Senior Electrical QC Engineer @ Enppi (Engineering for the Petroleum and Process Industries)
EGYPTIAN REFINERY COMPANY - ERC REFINERY PROJECT
مجموع سنوات الخبرة :14 years, 10 أشهر
• Prepare, check and review all Electrical work procedures and inspection test plan according to project requirements and client specifications
• Adhere to project specifications, drawings, data and construction instructions for all Electrical Works
• Keep the site quality control records coordinator informed on matters relating to quality control
• Monitor and Control the mark-up for the construction drawings required developing the as-built drawings
• Establish with the site personnel, practices on testing and turnover of the various systems and assist in securing the necessary client acceptance documentation for record.
• Witness the per-commissioning checks as required and maintain check out records
• Ensure the full implementation of company manuals, procedures and work instructions in accordance with the company / project quality system.
Prepare all Electrical work procedures and inspection test plan according to project requirements and client specifications
• Adhere to project specifications, drawings, data and construction instructions for all Electrical Works
• Keep the site quality control records coordinator informed on matters relating to quality control
• Monitor and Control the mark-up for the construction drawings required developing the as-built drawings
• Establish with the site personnel, practices on testing and turnover of the various systems and assist in securing the necessary client acceptance documentation for record.
• Witness the per-commissioning checks as required and maintain check out records
• Ensure the full implementation of company manuals, procedures and work instructions in accordance with the company / project quality system.
Solve the problems occurred on site.
Electrical panels installation according to layout
Cable laying, cables glanding and cables termination according to cable schedule and interconnection wiring diagram.
Installation of lighting poles, normal and emergency fixtures and junction boxes.
Installation of Lightning protection system.
Installation of Earthing system.
Solve the problems occurred on site.
Electrical panels installation according to layout
Cable laying, cables glanding and cables termination according to cable schedule and interconnection wiring diagram.
Installation of lighting poles, normal and emergency fixtures and junction boxes.
Installation of Lightning protection system.
Installation of Earthing system.
• Work with main contractor in the technical services, Site electrical engineering department to solve the problems occurs in the site and were sent to me by Request For Information "RFI" Report, also review all electrical documents to find any problems in engineering to solve it if possible and if not to address this problem to the engineering department in main office.
• Reviewing of Plot plan, Single line diagram, Isometric drawings, P&ID, electrical panels drawing, Cable drum schedule, cables schedule, interconnection wiring diagram, switchgear vendor documents, Heat Tracing drawings, installation details drawings, lighting system, lightning protection system and earthing system .
• Installation of electrical panels ( Switchgear, uninterrupted power supply, battery charger, soft starter, local control panels, interposing relay panel, and distribution panels), etc.
• Issue inspection and test reports, carry out these inspections with electrical quality control engineers and work to cover the initiated punch items.
• Assure that site activities as per contract specifications.
• Performing request for inspection to already finished activities.
• Familiar with the technical office duties and responsibilities.
• Issuing weekly of site reports for all electrical site activity.
• Site coordinator.
- A washing station works by PLC in addition to the treatment plant for the washing water to be used again and reduce wastage of water
- Washing station consists of the group stages contain engines and water pumps, brushes and alkaline and acidic materials for cleaning and some Blowers to dry.
- Treatment consists of several stages to separate the impurities and sediment from the water and then passing on the filters and some chemicals to produce water can which be used again in the laundry.