Work Experience

Total years of experience :19 years, 1 Months

Lead C&I Engineer at Parsons Brinckerhoff
  • Indonesia
  • My current job since November 2014

Responsible for hardware & software issues regarding the DCS(SEIMENS SPPA T3000) including supervision of the installation of the I/O cabinets, Process station (PCS) cabinets, Engineering Workstation (EWS), Operator stations (OPS), Network wiring & configuration, Communication with other systems- Turbine Control Monitoring System (GE Mark VI), Vibration monitoring system (VMS), Burner management system (BMS).
Review to improve ITP and QCP as applicable on the project.
Review quality pack, loop folder and project drawing.
Witnessed Site Acceptance tests, functional tests of all Electrical & Instrumentation Control systems.
Monitor completed document against construction completed jobs.
Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment.
Review P&ID, ILD and instrument location plan, hook up drawing and wiring diagram.
Attended Quality and Construction meeting in weekly basis to discuss quality related issues.

Field I & C Engineer. at Parsons Brinckerhoff
  • Saudi Arabia - Jeddah
  • September 2013 to October 2014

Review to improve ITP and QCP as applicable on the project.
Review quality pack, loop folder and project drawing.
Monitor completed document against construction completed jobs.
Responsible for hardware & software issues regarding the DCS(SEIMENS SPPA T3000) including supervision of the installation of the I/O cabinets, Process station (PCS) cabinets, Engineering Workstation (EWS), Operator stations (OPS), Network wiring & configuration, Communication with other systems- Turbine Control Monitoring System (GE Mark VI), Vibration monitoring system (VMS), Burner management system (BMS).
Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment.
Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation & electrical Workload.
Review P&ID, ILD and instrument location plan, hook up drawing and wiring diagram.
Attended Quality and Construction meeting in weekly basis to discuss quality related issues.
Inspection of installation of Cathodic protection anode and cathode electrodes and its cabeling and testing installed for vessels U/G & A/G pipe lines, vessels etc
Witnessed loop checking from field instrument to Marshalling cabinet ESD.
Witnessed installation of ESD, Marshalling cabinet, Console station and package instrument unit / skids
witnessed field and bench Calibration including field instrument installation, RTD, FT, PT, TT, LT, Control valve, pressure gauges and other instruments.
Inspect installation of instrument stanchions, Transmitter, Transducer, Tubing from taping point to process instruments including air supply leak testing according with standard and specification.
Check and verified installation of field junction boxes, Analog & Digital cables Thermocouple cable.
Witnessed installation of conduit, fitting, seal fitting as required by NEC, project drawing and
Client standard.
Witnessed installation & pre-commissioning of Fire & Gas systems (Smoke detectors, Heat detectors, UV detectors, Gas detectors, Deluge Systems, FM200 & Fusible plug systems)
Supervision of wire termination in field instrument, junction boxes and Marshalling cabinet.
Check instrument cable segregation for above and underground installation.
Verify and check process field instruments during loop check activates.
Witnessed insulation resistance test of instrument cables prior to cables pulling and after
cable termination.

E&I Engineer at DOOSAN
  • Saudi Arabia - Eastern Province
  • July 2010 to July 2013

• Review to improve ITP and QCP as applicable on the project.
• Review quality pack, loop folder and project drawing.
• Monitor completed document against construction completed jobs.
• Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment.
• Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation & electrical Workload.
• Reviewed ISS, P&ID, ILD and instrument location plan, hook up drawing and wiring diagram.
• Attended Quality and Construction meeting in weekly basis to discuss quality related issues.
• Issued Non-Conformance report of all repetitive violation of company standard, specification, drawing, industry standard and codes.
• Witnessed installation of conduit, fitting, seal fitting as required by NEC, project drawing and Client standard.
• Supervision of Cathodic protection Installation for Tanks, Pipes & rebar structure.

Instrument Engineer at Saudi Oger ltd
  • Other
  • April 2009 to May 2010

Worked as an QC/Automation engineer with Honeywell Alerton Bacnet system in
King Abdulla University for Science and Technology (Thuwal) Saudi Arabia.
• Under taking all types of work like Installation, commissioning of access control system, fire alarm system, Public addressing system, HVAC system (AHU, FCU VAV, and CHWP) and CO2 detector system.
• Execution of work as per drawings with ensuring the implementation of safety & quality in all activities and computing the discrepancies in the Quality of materials as per ARAMCO standard
• Certification of Job completion and RFI from Client and Consultants.
• Testing and commissioning with control diagrams for DDC controllers as per Sequence of Operation with PID loop and Graphics.

QA/QC Instrument Inspector at DAS Offshore Engineering Pvt Ltd.
  • Other
  • March 2007 to March 2009

Execute and conduct inspection as per approved QCP and ITP on electrical & instrument installation activities and equipment.
Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation & electrical Workload.
Review P&ID, ILD and instrument location plan, hook up drawing and wiring diagram.
Attended Quality and Construction meeting in weekly basis to discuss quality related issues.
Inspection of installation of Cathodic protection anode and cathode electrodes and its cabeling and testing installed for vessels U/G & A/G pipe lines, vessels etc
Witnessed loop checking from field instrument to Marshalling cabinet ESD.

Instrument Technician at RANK Controls & Instruments ltd
  • Other
  • March 2003 to March 2005

• To remove, dismentle, overhaul/repair & install electric, pneumatic, electronic or hydraulic control system such as control valves & actuators, recorders, measuring & recording instruments in the field or in the workshop.

• To perform preventive & emergency maintenance on all equipments on site, as well as during scheduled or unscheduled shutdown.

Education

Bachelor's degree, Instrumentation Technology.
  • at VTU
  • April 2007

Specialties & Skills

Installation
Commissioning
Overhaul
Materials