Sr.Land Surveyor (Open For New challenge)
Directorate of Town Planning & Survey (DTPS)
Total des années d'expérience :20 years, 1 Mois
Highlights:
• Prepare and maintain sketches, maps, reports, and legal descriptions of surveys in order to describe, certify, and assume liability for work performed.
• Verify the accuracy of survey data, including measurements and calculations conducted at survey sites. Direct or conduct surveys in order to establish legal boundaries for properties, based on legal deeds and titles.
• Record the results of surveys, including the shape, contour, location, elevation, and dimensions of land or land features. Calculate heights, depths, relative positions, property lines, and other characteristics of terrain.
• Prepare or supervise preparation of all data, charts, plots, maps, records, and documents related to surveys.
• Perform demarcation the Plot Boundary and refrence levels for (Residential, Commercial, and Industrial & Agricultural) as per planning to the contractor in order to execute the work at the site.
• Advise clients about building/property issues including technical, financial, legal, environmental, building regulation and restoration matters.
• Undertake property and land surveys and valuations. Monitor the deterioration of a property and take steps to abate it.
• Create center line & building line for services utilities (Roads, Telecoms and Electrical cables). Site survey for updating the data base of Planning and GIS departments.
Performance Milestones:
• Project Coordination - Getting members of the team to work together to accomplish tasks. Identifying Objects, Actions, and Events - Identifying information by categorizing, estimating, recognizing differences or similarities, and detecting changes in circumstances or events.
• Guiding, Directing, and Motivating Subordinates - Providing guidance and direction to subordinates, including setting performance standards and monitoring performance. Interpreting the Meaning of Information for Others - Translating or explaining what information means and how it can be used.
• Establishing and Maintaining Interpersonal Relationships - Developing constructive and cooperative working relationships with others, and maintaining them over time.
• Providing Consultation and advice to Others - Providing guidance and expert advice to management or other groups on technical, systems-, or process-related topics.
• Performing Administrative Activities - Performing day-to-day administrative tasks such as maintaining information files and processing paperwork.
Project Name: Downtown Jebel Ali Infrastructure Works - Zone-1 (Dubai)
Client: Limitless LLC (Dubai World Company)
Scope of work: Design & Supervision of Infrastructure work
Highlights:
• Spearheaded the responsibility of coordinating findings with the work of engineering and architectural personnel, clients, and others concerned with projects.
• Planned and Handled Road and Highway and construction of infrastructure Projects. Checked setting-out, levels for services locations and ensured their protection.
• Supervised of all survey work in order to maintain accuracy, Establish fixed points for use in making maps used surveying and engineering instruments.
• Checked the quality of all survey work during the execution of the construction at the site & checking as required to make sure work done as per approved drawings & details.
• Determined the coordinates and levels of important features and boundaries in survey areas, used totalstations, levels, and global positioning systems (GPS).
• Analyzed survey objectives and specifications in order to prepare survey proposals or to direct others in survey proposal preparation.
• Assisted in the preparation of as-built drawings. Observed site safety procedures to be complied withe safety, health and risk management requirements.
• participated in all health and safety issues at site, as required by the Resident Engineer, and project Safety Representative.
• Wrote the survey report as for good record & references.
• Design, Supervision and construction of Box Culvert on the River Nile Avenue (Omdurman - Sudan)
• Detail Survey for Lay by Bus (Abu Dhabi Island - UAE)
• Evaluation of Mountains Area & Volume for Crasher Plant (Fujairah - UAE)
Project Name: Ras AL-Khaima Internal Roads Stage - 2 Ras AL-Khaima - UAE
Client: Abu Dhabi Municipality
Scope of work: Design & Supervision of Construction Roads & Facilities (Parking, roundabout)
Highlights:
• Handled projects related to road construction. Developed criteria for survey methods and procedures. Handed over the main control points & Bench marks to the contractor in joint survey with Contractor representative.
• Checked the entire contractor Instruments (Levels machines & Total stations) & validated with manufacture certificate.Led the efforts of supervising the Bench marks & Control Points to the constructions site work.
• Supervised for all the survey work which was taken by the contractor before & during the construction such as: setting-out the roads alignment, cross-section, road profiles & leveling work for the Original Ground Level.
• Checked the shop drawings & verified that drawings were made as per contract drawing and as per latest O.G.L. Adviced the managements if there was any changes required according to latest O.G.L.
Project Name: Race day Hotels (H3 & H4) Crown Plaza and Stay Bridge - Yas Island (Abu Dhabi-UAE)
Client: Al-Dare Propitiates-Abu Dhabi
Scope of work: Construction Of the two hotels & parking building
Highlights:
• Handled projects related to construction of buildings and civil works. Analyzed survey objectives and specifications to prepare survey proposals or to direct others in survey proposal preparation. Calculated heights, depths, relative positions, property lines, and other characteristics of terrain.
• Computed geodetic measurements and interpreted survey data to determine positions, shapes, and elevations of building constructions and facilities.
• Coordinated findings with the work of engineering and architectural personnel, clients, and others concerned with projects.
• Determined coordinates of important features and boundaries in survey areas using totalstations, levels, and satellite-based global positioning systems (GPS).
• Developed criteria for survey methods and procedures. Directed or conducted surveys to establish legal boundaries for properties, based on legal deeds and titles.
• Established fixed points for use in making maps, using geodetic and engineering instruments.
Client: Dubai Government-Dubai
Scope of work: Fabrication & erection of Steel structure of Dubai Metro stations (10 Nos)
Highlights:
• Handled projrcts related to construction of metro rail & station survey wok.
• Prepared and maintained sketches, maps, reports, and legal descriptions of surveys to describe, certify, and assume liability for work performed.
• Prepared or supervised preparation of all data, charts, records, and documents related to surveys. Recorded the results of surveys including thelocation, elevation, and dimensions of steel strcuture.
Client: Private - Doha
it is twin commercial office building each building (8 story)
Scope of work: Fabrication & erection of Steel structure
Highlights:
• Worked as Project Surveyor for a project related to construction of commercial building.
• Established the control points around the building from known two control points, which was given by the government.
• Set-out the points for the columns anchor plates on the concrete foundation using total station and Dumb Level & set the columns base plates’ center line after casting.
• Responsible & fallow-up all the installation of steel structure members.
Al-Bidda Platinum Tower Project (Doha-Qatar)
Client: Private - Doha
It is commercial high-rise building (45 stories).
Scope of work: Fabrication & erection of Steel structure in the tower
Highlights:
• Worked on project related to construction of high rise building survey work.
• Established the control points around the building from known two control points which was given by legal Authorty (Municipality).
• Set out points and reference level for fixing the embedded plates on the concrete slab & the core wall before casting the slab (up to 30th floor).
• Set out the bracing center points & beam centerline after cast the slab (up to 44th floor). Set out the centerline & the level for the core wall plates (from 30th to 45th floor).
• Responsible for setting out the beam & columns location for all the steel structure connection above 31st floor.
Client: Petrodar Operating Oil Company (PDOC) & Sudan Government - Sudan
Oil & Gas Facilities
Scope of work: Fabrication & erection of Steel structure buildings (23 Nos)
-Repalnning of Peace Camp (Dar Al-Salaam) Project, west Omdurman Khartoum-Sudan.
-The studies for enlarge Al-Kadro Al-Jaeily Street project (Khartoum)
-Control points to make geodesy maps for Marawi area development (North Sudan).
-Marawi Airport project, the survey work for the runway and the internal roads.
second class - upper