Installations of MV distribution equipment consisting of MV switch gears and MV distribution Transformers along with all accessories and supports.
Installations of LV distribution equipment consisting of LV Dry Type transformers, LV Main distribution boards, Sub distribution boards, lighting and power panel boards.
Installations of Raceways consisting of Conduits, cable trays, cable trunks and cable ladders including accessories and supports.
Installing Grounding system, Lightning protection system, Central battery system, and uninterruptible power supply system.
Estimates, prepares and assigns the resources such as manpower, materials,
Consumables, equipment, tools, etc., required prior to execution.
Ensure all materials used and work performed are as per specifications and per the consultant’s request.
Deal with suppliers in order to submit Material Submittals according to the projects specifications for Consultants approval.
BE in Electrical Engineering Lebanese American University, Byblos (2012)