Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
MOHD HAZRI IBRAHIM, Manager

MOHD HAZRI IBRAHIM

Manager·PETRONAS CARIGALI IRAQ HOLDING B.V

Malaysia

Bachelor's degree,

Work experience

Total years of experience: 24 years, 6 months

Manager

January 2014 - Present

PETRONAS CARIGALI IRAQ HOLDING B.V

January 2014 - Present

TSD) &
Operations Readiness, Strategy & Assurance (ORSA)
Project Title : Garraf Development and Production Service Contract (DPSC)
Project Duration : More than 10 years
Project Status : On progress
Project Brief
* Garraf Development and Production Service Contract (DPSC) was signed on 18th
January 2010 by South Oil Company of the Republic of Iraq (SOC) of one part and

Company industry:
Oil & Gas
Job role:
Management

Construction Engineer

November 2011 - January 2014

PETRONAS CHEMICALS FERTILIZER SDN BHD

November 2011 - January 2014

Project Value : USD 1.5 Billion
Project Status : Completed
Project Brief
As an Alliance team in the BEPCC work included basic design, engineering, procurement,
installation, testing, pre-commissioning, commissioning and performance test of the SAMUR
located in Sabah Malaysia, consisting of site preparation, landscaping, security services, civil
works, temporary facilities, inland transportation and process buildings as well as development of
a Jetty and bagging plant.
Responsibilities
 Manage and coordinate with multi discipline design engineering as well as construction team.
 To monitor and observed the Construction and Fabrication activities ensuring contractors are
performing well as per plan and schedule. Highpoint to Construction manager when found delay in
progress and other problem observed with issuing site notification to Contractor. Report and create
recommendation that will enhance the project efficiency and to reduce potential problem at the same
time enforced the Contractor to expedite with the work.
 To ensure the Contractor executes the project in full compliance with its term and condition of
contract, project specific procedure and specification.
 Review, coordinate and monitor Contractor planning and scheduling. Monitor actual project
progress achieve against planned with controlling variance.
 Involve in design review and assessment in 5 packages:
- Site Study
- Environment Impact Assessments
- Basic & Detail Engineering, Procurement, Construction and Commissioning (BEPCC)
Alliance
- Non-Process Facilities
- Gas Pipeline & Metering Facilities
 Manage and handle Site Preparation works
 Lead team for construction of Temporary Facilities (Camp and Site Office)
 Tackle and solve local authorities issues
 Review and advise on design by Contractor
- Civil Foundation
- Civil Infrastructure
- Civil Structure
- Pipeline

Job role:
Engineering

Structure Engineer

January 2010 - November 2011

Ranhill E & C

January 2010 - November 2011

Tender Proposal Team)
Project Title : TENDER & PROPOSAL TEAM
Project Brief
 Sabah Oil and Gas Terminal (SOGT) MALAYSIA
 Fuel Storage & Off Loading Facility Ummu Qassar Port, IRAQ
 Waste Water for Cannal Sugar Factory SUDAN
- Gas Processing Facility, MEHAR Gas Field Development Project Onshore PAKISTAN
 Baghabari Power Plant BANGLADESH

Company industry:
Construction & Building
Job role:
Civil Engineering

Manager

January 2009 - January 2010

Ranhill International Incorporation (RII)

January 2009 - January 2010

Project Value : USD 149 million
Project Status : Completed
Project Brief
The EPC work included design, engineering, procurement, installation, testing, pre-
commissioning, commissioning and performance test of the Field Production Facility (FPF)
located in Palouge, consisting of crude oil processing equipment, production separators, booster
pumps, custody transfer meter system, nitrogen generator system, knockout drum & water seal
drum, cold vent, launchers and receivers as well as produced water system; the Central Processing
Facility (CPF) at Al-Jabalyn for the final treatment of the oil for export and 250km of produced
water 12” pipeline between Palouge and Al-Jabalyn.
Responsibilities
 Manage and coordinate multi discipline design engineering team.
 Basic design of Civil Structural work. Design more on pipe support, structural frame, pipe rack,
footing & foundation, infra works (sewerage & drainage system) and other civil structural scope.
 Work scope more on Engineering, Procurement, and Commissioning work at site.
 Work as civil structural engineer with Engineering Team.
 Hot Tapping work supervision and completion at plant.
 Planning and scheduling of work activities.
 Involved in issues such as Electrical, mechanical, piping and civil structural work.
 Responsible for all meeting with client and subcontractors.
 Solved the site problem with Technical team and engineers.
 Solved all drawing issue with technical team.
 Review of piping stress isometric for support and loading requirement (liaise with mechanical /
piping discipline)
 Well versed with AWS codes and standards.
 Site draft and amend the revised drawing as per site condition.
 Prepared daily, weekly and monthly report to Project Manager.
 Checking design and drawing for submission to client.
 Coordinates between technical and site issue with Engineers and supervisor.
 Arranging procurement and logistic status.
 Solving all Site Technical Query (STQ) for contractor not to delay the work.
 Manage and solved on how to change / added / modification the existing structural frame to make it
more stronger or new requirement from client or additional scope.
 Checking and report on equipment status arrived at site.
 Pre-commissioning & commissioning equipment of plant.
Page 6 of 11

Job role:
Management

Civil & Structural Engineer

July 2008 - January 2009

WCT-CEBARCO JV

United Arab Emirates

July 2008 - January 2009

Project Value : RM 2 billion
Project Status : Completed
Project Brief
A build-only contract

Job role:
Civil Engineering

Coordinator

February 2008 - July 2008

WCT-ARABTEC JV

United Arab Emirates

February 2008 - July 2008

MEYDAN RACECOURSE DUBAI
Client : MEYDAN
Project Duration : 2 years
Project Value : RM 4.6 billion
Project Status : Completed
Project Brief
Involves the construction and completion of the main building works, external works and
infrastructure works in relation to the proposed development and construction of the Nad Al
Sheba Racecourse on Parcel ID 600-6888, Nad Al Sheba

Job role:
Administration

Construction Manager

October 2004 - February 2008

RANHILL PETRONEEDS JV

October 2004 - February 2008

MELUT BASIN OIL DEVELOPMENT PROJECT SUDAN
Client : PETRODAR Operating Company
Project Duration : 3 years
Project Value : USD 239.4million
Project Status : Completed
Project Brief
The EPCC work included design, engineering, procurement, installation, testing, pre-
commissioning, commissioning and performance test of the Field Production Facility (FPF)
located in Palouge, consisting of crude oil processing equipment, storage tanks, production
separators, booster pumps, launchers and receivers as well as produced water system; the Central
Processing Facility (CPF) at Al-Jabalyn for the final treatment of the oil for export and 250km of
produced water 12” pipeline between Palouge and Al-Jabalyn.
Responsibilities
 Manage and coordinate multi discipline design engineering team.
 Basic design of foundation, pad footing, concrete and steel structural on site as per design changes.
 Basic design of rectification works and steel structural works.
 Planning and scheduling all activities at site.
 Responsible for all steel structure works etc. i.e.; Piling, Piping, Civil and Infra, Concreting, External
and Internal Package buildings, Installation of all plant static and rotating equipment / machinery.
 Skid and pipe racks / steel structure; Review and complement all Lifting Plans, Work Permits,
Identification of equipment offloading locations / lay down areas.
 Responsible in managing all Project and Contract Services, Scope, Quality, Reporting, Schedule,
Risk Analysis, Cost control, Manpower/Equipment/Tools/Consumables Loading, Procurement and
Local Authority Clearance in order to ensure smooth completion of various projects.
 To conduct welder testing (WQT), test piece visual inspection and welding test bays preparation.
 Surveillance and Ensuring the Correct Filler/Electrodes are utilized as per WPS on welding
activities.
 Control of fabrication and weld defects for repair works.
 Piping Material request as per drawing and work order.
 Ensuring all concreting works for tank foundation, buildings, ground foundation and concreting
work in plant followed the specification and standards.
 Prepare Daily Progress Report on fabrication and erection of piping and steel structures.
 Assisted architect for finishing work at all building at site and plant.
 Responsible for all infra works at site such as roadwork, drainages, sewerage line and landscapes.
 Managed to complete building for camp such as high rises building, hospital, mosque, sport
complex, staff accommodation, fire station, administration building, warehouses and workshop.
 Assist and conduct water & sewerage treatment plant system with vendor at site.
 Well versed with American Concrete Institutes (ACI), AISC and BS codes standards.
 Summarized project implementation delay factors and propose solutions.
Page 9 of 11

Company industry:
Oil & Gas
Job role:
Engineering

Design Engineer

April 2003 - October 2004

RANHILL CONSULTING SDN BHD

April 2003 - October 2004

MALAYSIA

Job role:
Engineering

Civil Engineer

June 2002 - April 2003

RANHILL CONSULTING SDN BHD

June 2002 - April 2003

TRAFFIC DISPERSAL SCHEME FOR KL SENTRAL
Client

Job role:
Civil Engineering

Engineer

December 2001 - June 2002

RANHILL CONSULTING SDN BHD

December 2001 - June 2002

s Electrical High Speed Double Track, Malaysia

Job role:
Engineering

Construction manager

-

PETRONAS Carigali Sdn Bhd (PCSB), Japan Petroleum Exploration Company (JAPEX)

-

and North Oil Company (NOC) of the second part for the Garraf Contract Area which was
subsequently made effective on 10th February 2010.
* There are two major milestones for Garraf development, i.e. First Commercial Production
(FCP) and Plateau Production Target (PPT). The FCP production is to deliver the
production target capacity of 35, 000 BOPD for 90 days after first oil and 60, 000 BOPD for
remaining of 2013 before progressively increase production to reach Plateau Production
Target (PPT) of 230, 000 BOPD, by 2017.
Responsibilities
 Manage to design and issue out tender package for infrastructure works; project design such as
roadworks, buildings and infraworks
 To monitor and observed the Construction and Fabrication activities ensuring contractors are
performing well as per plan and schedule. Highpoint to

Job role:
Engineering

Senior Civil Structural Engineer

-

 Construction of 2 tanks Bintulu MALAYSIA

-

Project MALAYSIA
 Bio-Xcell Development MALAYSIA

Job role:
Civil Engineering

-

Jabatan Kerja Raya Malaysi

-

Project Value : RM1.4 billion
Project Status : Completed
Project Brief
Proposed dual-carriageway expressway starting from MSSC Interchange and end at Penawar
Interchange with the total of length of 77km. The proposed expressway was divided into 4
packages including 5 interchanges, 1 at-grade intersection & 4 toll plazas.
Responsibilities
 Manage and coordinate multi discipline design engineering team.
 Responsible for Hydrological & Hydraulic analysis of drainage and culvert at Senai-Desaru
Interchanges and Mainline.
 Basic design of bridges for 3 packages.
 Basic design of steel structural and civil works such as footing and foundation.
 Planning and scheduling all activities in the office.
 Involved in the basic design, tender drawings preparation and tender bid evaluation.
 Preparation of tender documentation for the reservoir, coordinated engineering drawing, tender
documentations inclusive of bills of quantities and review Quantity Survey Reports.
 Liaison with the relevant authorities for their approval in the implementation of the project.
 Site reconnaissance and investigation.
 Familiar with BS 8110 and BS 5950 standard and requirements needed.
 Handled requests for drawing services based on sketched input drawings and modifications for
physical drawings.
 Managed and coordinated personnel and operational activities involved in all phases of construction
projects.
Page 10 of 11

Job role:
Other

Project

-

Dewan Bandaray

United Arab Emirates

-

Project Brief
Propose a new road / highway to avoid critical traffic in KL Sentral Area.
Responsibilities
 Manage and coordinate multi discipline design engineering team.
 Produce preliminary and detailed engineering design drawings and calculations for Traffic Dispersal
Scheme for Tun Sambanthan Road and its vicinity for the development of Kuala Lumpur Sentral.
 Prepare report such as inception report, site visit reports and monthly progress report.
 Performed design of concrete buildings.
 Skilled in manual drafting, as well as AutoCAD.
 Submitted shop drawings for the architects' approval.
 Assist engineering design team in site development for utilities, storms, detention, paving, lakes,
drainage studies, grading, and roads.
 Coordinated with construction firms involved in building structure.

Job role:
Engineering

Project

-

Jabatan Kerja Ray

-

Project Brief
Design, construction & supervision of double-tracking a 110 kilometers section of railway line from
Rawang to Bidor, including eight new stations and a freight depot
Responsibilities
 Manage and coordinate multi discipline design engineering team.
 Produce preliminary and detailed engineering design drawings and calculations for Traffic Dispersal
Scheme for Tun Sambanthan Road and its vicinity for the development of Kuala Lumpur Sentral.
 Designed reinforced concrete processes for slabs and beams.
 Developed and designed new layouts and construction plans.
 Experienced in site development, drainage, and utilities design.

Job role:
Engineering

Education

University Technology of Malaysi

January 2001

January 2001

Bachelor's degree,

courses: PETRONAS Scholarship) PROFESIONAL MEMBERSHIP Graduate Member (B.E.M.) & (I.E.M.) COURSES ATTENDED NIOSH – Oil & Gas Safety Passport (OG0011833N) & CIDB course

Skills

BASIC
Expert
BASIC
Expert
CUSTOMER RELATIONS
Expert
CUSTOMER RELATIONS
Expert
FINAL
Expert
FINAL
Expert
GRAPHIC DESIGN
Expert
GRAPHIC DESIGN
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
OIL PAINTING
Expert
OIL PAINTING
Expert
PAGE
Expert
PAGE
Expert
PROCUREMENT
Expert
PROCUREMENT
Expert
PROGRESS
Expert
PROGRESS
Expert
SCHEDULING
Expert
SCHEDULING
Expert

Languages

Arabic
Expert
English
Expert