Site Civil Structural Engineer
Al Yamama Company
مجموع سنوات الخبرة :5 years, 10 أشهر
Managed design verifications of the structural design of RCC and steel structures and
prepared structural shop drawings.
* Coordinate with the design consultant, subcontractors to ensure the structural design and
drawings are as per project requirements.
* Oversaw drawing development to “Issued for construction (IFC)”status and ensured all
technical requirements are met and clearly illustrated.
* Conducted periodical design meetings and design workshops with design consultant, sub
consultants, contractors, to solve project related issues and to mitigate or avoid any
potential delays in the actual progress, so as to achieve the planned progress.
* Ensured coordination across all disciplines with the design department.
* Coordinated with SAPMT Design engineer to obtain approvals for the design documents &
shop drawings at all stages of work.
* Conducted site visits and attend periodical review meetings to understand and ensure that
the work is in compliance with the design drawings & specifications and progressing as per
schedule and resolved any structural design related issues which may hamper the progress
of the project.
* Coordinate with different departments and consultants regarding design of the projects to
get to accurate and final information and decisions.
Presented seminars on “Stress Ribbon Bridges” & “Comparison between Different Techniques of Base Isolation”. I'm a very sincere student during my Masters, as I got many Academic awards during my masters. During the 1st Semester, I got 2nd place in the department & in the 2nd Semester, I got 1st place in the department. My sincere and hard work goes on in the department & throughout my master's period. As I completed my final year project on “STATIC And Dynamic Analysis of Multi-storey Building with Ground and Intermediate Soft story having Floating Column”. Academic Project of M.Tech 4th Semester “STATIC And Dynamic Analysis of Multi-storey Building with Ground and Intermediate Soft storey having Floating Column” • Using ETABS. • Fundamental time period, base shear, storey displacement and story drift is calculated by Equivalent static analysis & Response spectrum analysis. 3rd Semester Analysis and Design of Multi-storey Building • Using STAAD Pro. • Manually Analysis by Moment Distribution Method.
Academic Project of B.E "Analysis and Design of Commercial Mall" • Using STAAD Pro • Manually Analysis by Khane’s Method Academic Survey camp It was executed at Tavargera survey camp Setting out, levelling and surveying the site Operating survey instruments and devices Preparing detailed field notes of survey activities...