Project Construction Manager, PMP®
Alghanim International Co. ( ALG Int.), http://www.falghanim.com
Total des années d'expérience :21 years, 2 Mois
Project's involved were Mosque, Cafeteria and Training Centre building's @ Al-Zour "NRP" new Refinery Project ( $19bn ), under the Supervision of Fluor's Joint venture FDH JV team which was selected by (KIPIC) as (EPC) Contractor.
Job Duties & Capability :
___To Oversee total Constr. Execution & Progress on timely or earlier Completion and within budget.
___To Follow-up and implement Safety and Qa/Qc Procedures.
___To Ensure adherence with Company, Client, Project Policies, Procedures and Standards.
___To Lead a large Constr. Team with different skills & Categories, Improve Team’s Performance.
___To Raise potential Time Cost Impact and Variation Report, and to Evaluate Value Engineering with Cost saving performance.
___To Ensure Harmonious and Successful Operation of Construct and Problem resolution.
___To Provide direction to Planning, Scheduling, Engineering and Construction functions.
https://www.fluor.com/projects/engineering-construction-al-zour-refinery-kuwait
Construction of B11 - Residential Bldg 2014-2017 http://www.b11beirut.com, a Landmark Project at Centre Ville _ Beirut (First bldg to Obtain LEED with Gold rating)
Construction of M1 _ Mika-1 Offices Bldg 2011-2014
http://www.m1building.com, at Down town _ Beirut, a Landmark Project at Centre Ville
Construction of Capital Centre Tower, In Exhibition Center Area (ADNEC) Abu Dhabi; The International Tower (US$100Million), http://www.internationaltower.ae
7 Fl Parking (770 Cars), ( 4B+Gr+P1/2+28 Fl) Multi-stories Office bldg, Area=84000M2, H=115M covered 16000M2 Unitize Glaz Syst & 3000 Alum Clad.Panels, built with 42000M3 & 8200Ton, having 12 HS Lifts (6 M/Sec) & 1 Serv. Lift (4 M/Sec).
---From Jul-2008-2009...@ Villamar project @ Bahrain Financial Harbor (3 HR twisting towers of 57 Stories with 30, 000M2 Podium & SkyVilla 7 Stories, Total Area 250, 000.M2 at Cost US$ 430 Millions), http://www.villamarharbour.com
---From Apr-2007-2008 ...@ Marriot Hotel project (2HR towers of 22 Stories Residential_188 Aparts, 34, 000.M2 Area at Cost US$ 52 Millions), http://www.marriott.com/hotels/travel/baher-marriott-executive-apartments-manama-bahrain
---From Nov-2004-2007...@ Bahrain Financial Harbor project (2 HR towers of 52 Stories Office Bldgs, 124, 000.M2 Area at Cost US$ 190 Millions), http://www.bfharbour.com
---From Sep-Nov 2004...@ Trust International officeTower, Bahrain (22 Story office bldg, cost $ 22 Millions), http://www.smehboob.com/portinternational7.html
---From Feb-Sep 2004...@ Ahli United Bank new head Quarter, Bahrain (7 Story bldg, cost $ 17.5 Millions), http://www.ahliunited.com/bhabout.html
---From Apr-2002-2004...@ Al-Moayyed Tower, Bahrain (47 Story bldg, cost $ 52 Millions), http://www.designbuild-network.com/projects/almoayyed/
---From Feb-2001-2002...@ Garden Village, Dubai-Jebel Ali (28 Bldgs of 3 story & 36 flats each, cost $30 Millions)
---Reconstruction of Housing Lebanon, Tripoli ( US$ 20 Million) 78 residential building of total 980 units with school, shops etc....... In Charge of Steel Yard for the project.
Reconstruction of Military Warehouses, include all type of
Maintenance, In charge of Aluminum, Glass, Steel, Wood & Block work Workshop for all Military Job in Lebanon ( Supply & Installation ); Controlling more than 50 Skilled / Unskilled Soldiers.
---Major Courses are : Reinforced Concrete (ACI / BAEL codes), Prestressed/Post tensioned Concrete, Special Const. design, Bridges design (BS), Highway & Road Design, Metallic Structures, Soil Mechanics, Hydraulics, Seismic Design (UBC), Finite-Element, Urban Hydrology, buillding Economies & Research Operational etc... ---Proficiency in Microsoft Office, AutoCAD, Ms. Project, Primavera, Robot97 & Sap90. ---http://www.tripoli-lebanon.com/university.htm ---http://www.ul.edu.lb/faculte/branches.aspx?facultyId=12