MEP Engineer-Mechanical
Leighton Contracting WLL
Total years of experience :14 years, 9 Months
Current Job Profile: MEP Engineer
Leighton Contracting Qatar WLL as MEP Engineer-Mechanical Since Nov’16
Client: Ashgal LRDP, Construction and Road Improvement Works at Aziziya East
• Currently working in Piping upgrade works in Doha, Qatar; Pipe type includes Vitrified Clay, GRP pipe, HDPE pipe and Ductile Iron pipes
Dec’15- Present
Client: King Fahd Medical City, Ministry of Health
Highlights/Role:
• Distinguished efforts towards installing:
o Chilled water line
o Duct Work, Fire Fighting, Plumbing
• Coordinating Electrical and Mechanical issues with other discipline and avoiding conflicts which lead to delay in project.
• Supervising mock-up room installation and taking final approval from the consultant.
• Issuing clearance for Civil prior to any activity as and when required.
Leighton Middle East Contracting LLC, Al Baitha, Qaseem, KSA Oct’14 - Dec’15
(Dragados-Leighton JV)
Designation: Mechanical Engineer -(MEP)
Client: Maaden Alcoa JV-Bauxite Mine Infrastructure & Utilities Project
Highlights:
• Distinguished efforts towards installing:
o Power Generation Building-Generators Installation
o Bore Well Pump
o Residential Building in Mine Village.
• Coordination with subcontractors for timely completion of project.
• To ensure proper manpower deployed by the subcontractors for achieving the specific target. Also, to check material availability with approval done prior to start of an activity.
• Reviewing the scope of work of subcontractor and apprising the Quantity Surveyor for any deviation.
• To ensure proper permits are issued prior to start of an activity.
• Infrastructure work (PVC, GRE/RTR, and G.I. pipe laying) and coordinating for HVAC, Plumbing and Fire Fighting Services for the Mine Site building works.
• Material Approval, Inspection request. Coordinating with Quality Control department for effective completion of work and to avoid any anomalies.
• Coordinating with the client for any changes and delivering it as per scope and quality.
• Issuing Request for Information (RFI) to the designer for any doubts and taking advice, or for changes in design as per site condition and subsequently taking approval from it.
Working in One of the prestigious project Under the Guidance and Supervision of Ministry of Interior, KSA, Strategic Project-SBG KAP 0
1.To Erection & Installation of Drainage, Water supply network, and also fire fighting
2. Erection & Installation of Chilled Water Pipe Lines, Checking the Welding Joints and Quality of Welding.
3. Insulation of Ducts and Chilled Water Pipe.
4. Preparing the Bill of Material.
5. Handling the Man power, Material and Quality of Work.
6.. Forecasting of Material for the continuously work flow.
8. Coordinating with other fellow contractors for clearances to work.
9. Preparing the measurement, checking the measurement with clients and take the certification.
10. Maintaining the good relation with Client, PMC, Vendors, and Contractor.
11. Execution the Project as per Approved Drawings, Specifications, Scope of Work and Quality.
1.To daily take production report and plan manpower.
2.To take daily inventory status and plan accordingly.
3.Effective planning to decrease cost.
4.Controlling production as per demand.
5. Implement 5S on shop and quality check.
6. Analysis of output.
7. Creatings methodology to improve production.
1.To develop Mechanical Drawing in accordance to IS Specification for Transformer
2.Bill of Material.
3.To do quality checks at the shop floor.
4.Assisting procurement department for Material specification.
Achievement GPA : 73.96% Was a third rank holder in third year of graduation. Dissertation Project: • Dynamic response control of a cantilever beam using FEM • Designed an Air Conditioning system for the Kennedy Hall Auditorium, AMU, Aligarh (Dip. in Engg.)
Aligarh Muslim University