Mohsen Behzadi Abnavi, 3rd Party Inspection & Engineering Team Leader

Mohsen Behzadi Abnavi

3rd Party Inspection & Engineering Team Leader

N/A

Location
Iran
Education
Diploma, Mechanical Engineering Associate
Experience
25 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 2 Months

3rd Party Inspection & Engineering Team Leader at N/A
  • Iran
  • My current job since June 2011

•Managed and assisted technical inspection teams and the quality department of subcontractors to fulfill their duties.
•Supervised TPI staff by determining workloads and schedules; developed interpreted and implemented policies and procedures.
•Inspected, engineered, and consulted the construction process of process equipments (i.e. pressure vessels, heat exchangers, boilers, etc.) and tanks.
•Implemented, supervised and coordinated the quality control, engineering and inspection programs at the projects location.
•Commented and verified Manufacturer's Data Reports of all pressure and non-pressure vessels.
•Assisted Site Managers, Project Managers and site QA representatives with the preparation and compilation of ITPs, MDRs, etc.
•Provided technical information to engineering, manufacturing and subcontractor documentation to ensure that appropriate quality requirements are met.
•Reviewed, even commented and accepted the contractors Quality Plans and Engineering Procedures.
•Organized and managed off site inspections relating to orders placed on site and liaised with off site project personnel and fabrication companies to ensure that quality objectives are understood and are being met.
•Controlled and managed the Quality Control Record filing system and the input of the same into the Turnover System Tracking Report.
•Reviewed, commented and verified documentations of all piping construction work packages and piping test packages.
•Managed and Participated in selection and qualification of project technical personnel and evaluated staff and made hiring and termination recommendations.
•Interacted professionally with the PMC staff, vendors and other staff; maintained effective working relationships and works in cooperation with the management team to effectively meet departmental objectives.
•Coordinated section activities with other sections, programs and departments, including scheduling and resolving problems.
•Responded to emergencies as requested; coordinated activities with other responders; directed the work of staff and utilization of resources to effect repair and ensured the safety of the community.
•Worked closely with the commissioning teams to ensure compliance with safety and quality requirements.
•Monitored and participated in operations in assigned sections including inspecting projects, developing and implementing modifications and improvements, recommending specifications and scheduling for contracts, inspecting contractor’s work to ensure that safe work practices and procedures are followed.

TECHNICAL INSPECTION & ENGINEERING TEAM LEADER at TV
  • Iran
  • October 2008 to May 2011

•Directed and Managed the staff of Third Party Inspection Agencies and the quality department of subcontractors to ensure that they are well motivated and receive all necessary training and development to enable them to carry out their responsibilities to the required specifications and standards.
•Managed, engineered, inspected, and documented construction and In-service of piping systems/elements, pressure vessels, heat exchangers, air coolers, drums, separators, wellhead facilities, pipelines, equipment’s, storage tanks, cranes, etc.
•Performed and evaluated Fitness-For-Service and Risk-Based Inspection Technology on piping elements/systems, pressure vessels, wellhead facilities and pipelines in accordance with API 579-1/ASME FFS-1and API 581respectively.
•Engineered and determined the remaining strength of the pressured Oil and Gas pipelines based on intelligent pig results and ASME B31.G Code.
•Advised and consulted the Project Director of engineering inspection and QA/QC problems and prepared technical data for satisfactory resolution.
•Interacted professionally with the vendors and subcontractors; maintained effective working relationships and works in cooperation with the management team to effectively meet departmental objectives.
•Maintained strict engineering and quality control procedures in accordance with international standards- this necessitates regular testing of materials, work visual inspections, and frequent tours of the sites ensuring the projects run to schedule, and finding solutions to problems that may cause delays, such as the late arrival of materials.
•Reviewed and verified all piping construction work packages (CWPs), piping test packages, and MDRs.
•Assured all the proper documentation for the performing process and supplying with the necessary materials; ensured that safety and quality training is provided to QA/QC and TPI staff and that proper safety practices are followed.
•Verified various types of WPSs, PQRs and Welder Performance Qualifications and interpretation of radiographs.

QUALITY ASSURANCE/CONTROL MANAGER at (HEA)HEAT EXCHANGERS AUSTRALIA PTY LTD
  • Australia
  • January 2008 to August 2008

•Managed Quality Assurance and Quality Control personnel in the manufacturing/construction process of pressure vessels, drums, air coolers, heat exchangers, refurbishment jobs, materials, welding, NDT, Structural Steel and Painting.
•Engineered, implemented, maintained and advanced the quality systems in compliance with ISO 9001 standard and ASME code.
•Supported Quality Assurance Questionnaire to all suppliers in order to assess their qualifications monthly and sometimes quarterly.
•Prepared and managed all quality assurance, quality control and engineering procedures and established Quality Plans, ITPs, WPSs and MDRs.
•Developed and implemented Quality Assurance/ Quality Control programs and Quality Management System (QMS).
•Managed Non-conformance Reports for non-conforming equipment and components and manufacturing, repair, modification and monitored closures of NCRs.
•Performed internal and external audits and supported the audits conducted by other professionals.
•Established quality control programs for construction, consistent with design standards and specifications, client requirements, standards and codes.
•Attended client initiated QC meetings, contract kick-off meetings, internal Management meetings and Construction Contractor progress meetings.
•Prepared and delivered shop quality control inductions and engineering procedures to all personnel charged with performing quality control functions.
•Ensured that work procedures and QA/QC verifying documents (check sheets) conform to the Client/Project specified requirements.
•Developed and managed of project specific procedures for NDT, PWHT, hydro test, repair welding, and painting.
•Performed, verified, and retained engineering, quality control documents for inspection, calibration and testing.
•Conducted evaluation of quality and engineering problems and monitored corrective and preventive actions to resolve the problems.
•Controlled the quality assurance within all involving and relevant departments i.e. document controls, design departments, etc.

TECHNICAL INSPECTION ENGINEER at SA
  • Iran
  • June 2006 to August 2007

•Directed the staff of Third Party Inspection Agencies and the quality department of subcontractors to ensure that they are well motivated and receive all necessary training and development to enable them to carry out their responsibilities to the required specifications and standards.
•Engineered, inspected, and documented construction and In-service of piping systems/elements, pressure vessels, heat exchangers, air coolers, drums, separators, wellhead facilities, pipelines, equipment’s, storage tanks, etc.
•Performed and evaluated Fitness-For-Service of piping elements/systems, pressure vessels, pipelines, and so on in accordance with API 579.
•Engineered and determined the remaining strength of the pressured Oil and Gas pipelines based on intelligent pig results and ASME B31.G Code.
•Interacted professionally with the vendors and subcontractors; maintained effective working relationships and works in cooperation with the management team to effectively meet departmental objectives.
•Maintained strict engineering and quality control procedures in accordance with international standards- this necessitates regular testing of materials, work visual inspections, and frequent tours of the sites ensuring the projects run to schedule, and finding solutions to problems that may cause delays, such as the late arrival of materials.
•Reviewed and verified all piping construction work packages (CWPs), piping test packages, and MDRs.
•Assured all the proper documentation for the performing process and supplying with the necessary materials; ensured that safety and quality training is provided to QA/QC and TPI staff and that proper safety practices are followed.
•Verified various types of WPSs, PQRs and Welder Performance Qualifications and interpretation of radiographs.

TECHNICAL INSPECTION ENGINEER at TECH. INSPECTION&CORROSION CONTROL Co. (
  • Iran
  • May 2004 to July 2006

•Managed and assisted quality department of subcontractors to fulfill their duties.
•Supervised contractor's staff by determining workloads and schedules; developed interpreted and implemented policies and procedures.
•Inspected, engineered, and consulted the construction process of process equipments (i.e. pressure vessels, heat exchangers, boilers, etc.) and tanks.
•Implemented, supervised and coordinated the quality control, engineering and inspection programs at the projects location.
•Commented and verified Manufacturer's Data Reports of all pressure and non-pressure vessels.
•Assisted Site Managers, Project Managers and site QA representatives with the preparation and compilation of ITPs, MDRs, etc.
•Provided technical information to engineering, manufacturing and subcontractor documentation to ensure that appropriate quality requirements are met.
•Reviewed, even commented and accepted the contractors Quality Plans and Engineering Procedures.
•Controlled and managed the Quality Control Record filing system and the input of the same into the Turnover System Tracking Report.
•Managed and Participated in selection and qualification of project technical personnel and evaluated staff and made hiring and termination recommendations.
•Interacted professionally with the PMC staff, vendors and other staff; maintained effective working relationships and works in cooperation with the management team to effectively meet departmental objectives.
•Coordinated section activities with other sections, programs and departments, including scheduling and resolving problems.
•Responded to emergencies as requested; coordinated activities with other responders; directed the work of staff and utilization of resources to effect repair and ensured the safety of the community.
•Monitored and participated in operations in assigned sections including inspecting project, developing and implementing modifications and improvements, recommending specifications and scheduling for contracts, inspecting contractor’s work to ensure that safe work practices and procedures are followed.

EQUIPMENTS INSPECTOR at ATI INDEPENDENT TECHNICAL INSPECTION CO.
  • Iran
  • January 2004 to May 2004

•Managed and assisted technical inspection teams and the quality department of subcontractors to fulfill their duties.
•Inspected, engineered, and consulted the construction process of process equipments (i.e. pressure vessels, heat exchangers, boilers, etc.) and tanks.
•Implemented, supervised and coordinated the quality control, engineering and inspection programs at the projects location.
•Commented and verified Manufacturer's Data Reports of all pressure and non-pressure vessels.
•Assisted Site Managers, Project Managers and site QA representatives with the preparation and compilation of ITPs, MDRs, etc.
•Provided technical information to engineering, manufacturing and subcontractor documentation to ensure that appropriate quality requirements are met.
•Reviewed, even commented and accepted the contractors Quality Plans and Engineering Procedures.
•Reviewed, commented and verified documentations of all piping construction work packages and piping test packages.
•Managed and Participated in selection and qualification of project technical personnel and evaluated staff and made hiring and termination recommendations.
•Interacted professionally with the PMC staff, vendors and other staff; maintained effective working relationships and works in cooperation with the management team to effectively meet departmental objectives.
•Coordinated section activities with other sections, programs and departments, including scheduling and resolving problems.
•Worked closely with the commissioning teams to ensure compliance with safety and quality requirements.
•Monitored and participated in operations in assigned sections including inspecting projects, developing and implementing modifications and improvements, recommending specifications and scheduling for contracts, inspecting contractor’s work to ensure that safe work practices and procedures are followed.

QUALITY ASSURANCE/CONTROL INSPECTOR at (AAC)ABAN AIR COOLER Co.
  • Iran
  • July 2000 to November 2003

•Assisted Quality Assurance and Quality Control personnel in the manufacturing/construction process of pressure vessels, drums, air coolers, heat exchangers, refurbishment jobs, materials, welding, NDT, Structural Steel and Painting.
•Engineered, implemented, maintained and advanced the quality systems in compliance with ISO 9001 standard and ASME code.
•Prepared all quality assurance, quality control and engineering procedures and established Quality Plans, ITPs, WPSs and MDRs.
•Developed and implemented Quality Assurance/ Quality Control programs and Quality Management System (QMS).
•Managed Non-conformance Reports for non-conforming equipment and components and manufacturing, repair, modification and monitored closures of NCRs.
•Established quality control programs for construction, consistent with design standards and specifications, client requirements, standards and codes.
•Attended client initiated QC meetings, contract kick-off meetings, internal Management meetings and Construction Contractor progress meetings.
•Prepared and delivered shop quality control inductions and engineering procedures to all personnel charged with performing quality control functions.
•Ensured that work procedures and QA/QC verifying documents (check sheets) conform to the Client/Project specified requirements.
•Participated in developing and managing of project specific procedures for NDT, PWHT, hydro test, repair welding, and painting.
•Performed, verified, and retained engineering, quality control documents for inspection, calibration and testing.
•Evaluated quality and engineering problems and monitored corrective and preventive actions to resolve the problems.
•Controlled the quality assurance within all involving and relevant departments i.e. document controls, design departments, etc.

QUALITY CONTROL INSPECTOR at FAKC MANUFACTURING&INDUSTRIAL CO.
  • Iran
  • September 1999 to April 2000

•Performed Quality Assurance and Quality Control on all incoming and outgoing materials, parts, machined castings, etc.
•Prepared all Quality Assurance and Quality Control documents and established Quality Plans, ITPs and MDRs.
•Monitored Quality Assurance and Quality Control activity to ensure that all facilities are designed, manufactured constructed, tested, installed and commissioned to an optimum level of quality and integrity.
•Prepared and checked all operations for machining activities and verified all relevant procedures are met before starting the job.

QUALITY CONTROL INSPECTOR at ZARIF AFZAR ENGINEERING TECHNICAL CO.
  • Iran
  • May 1999 to June 1999

•Performed Quality Assurance and Quality Control on all incoming and outgoing materials, parts, machined castings, etc.
•Prepared all Quality Assurance and Quality Control documents and established Quality Plans, ITPs and MDRs.
•Monitored Quality Assurance and Quality Control activity to ensure that all facilities are designed, manufactured constructed, tested, installed and commissioned to an optimum level of quality and integrity.
•Prepared and checked all operations for machining activities and verified all relevant procedures are met before starting the job.

QUALITY CONTROL/ TECHNICAL INSPECTOR at PARSTECHNIC INDUSRIAL CO.
  • Iran
  • May 1998 to May 1999

•Performed Quality Assurance and Quality Control on all incoming and outgoing materials, parts, machined castings, etc.
•Prepared all Quality Assurance and Quality Control documents and established Quality Plans, ITPs and MDRs.
•Monitored Quality Assurance and Quality Control activity to ensure that all facilities are designed, manufactured constructed, tested, installed and commissioned to an optimum level of quality and integrity.
•Prepared and checked all operations for machining activities and verified all relevant procedures are met before starting the job.
•Assessed all operations regarding machining, welding, PWHT and NDE are carried out in the best condition; signature of all daily reports regarding welding and NDE activities.

Education

Diploma, Mechanical Engineering Associate
  • at Shahid Bahonar Engineering Technical College
  • December 1998

Specialties & Skills

Inspection
Manufacturing
Pressure Vessels
Pressure
Engineering &Technical consulting, QA/QC, Fitness-For-Service, RBI, Materials and welding knowledge

Languages

English
Expert

Training and Certifications

Yes (Certificate)
Date Attended:
September 2011
Valid Until:
September 2011
Yes (Certificate)
Date Attended:
August 2006
Valid Until:
September 2006
Yes (Certificate)
Date Attended:
June 2000
Valid Until:
June 2000
Yes (Certificate)
Date Attended:
May 2008
Valid Until:
May 2008