Project Mnager
Technology Development and Fabrication company Pvt. Ltd
Total years of experience :11 years, 3 Months
• Performs on-site management, supervision and coordination of all self-performed and contracted work.
• Ensures execution of field construction activities in conformance with project drawings, specifications, schedules, cost estimates, procedures, quality requirements and safety standards.
• Ensures that daily and weekly short-range planning is maintained down to the foreman level.
• Responsible for supervising all field personnel of a discipline to achieve completion of the project on schedule, with quality workmanship that conforms to original plans and specifications.
• Monitor daily construction details and daily progress in his area. Prepares schedules and supervises completion of a final punch list.
• Monitor the activities of subcontractors to ensure compliance with specifications and procedures and with the project objectives for safety, quality, productivity, schedule and cost. Provide solutions to subcontractor’s problems in order to achieve the successful execution of the project.
• Ensure that the material handed over to the Subcontractor is controlled, preserved and issued for the intended purpose.
• Pre-commissioning, Commissioning and start-up support to operations.
• Coordinate with Area engineers and Supervisors to ensure that daily or weekly project activities in the assigned areas been carried out in a safe and timely as per plan.
• Performs on-site management, supervision and coordination of all self-performed and contracted work.
• Ensures execution of field construction activities in conformance with project drawings, specifications, schedules, cost estimates, procedures, quality requirements and safety standards.
• Ensures that daily and weekly short-range planning is maintained down to the foreman level.
• Responsible for supervising all field personnel of a discipline to achieve completion of the project on schedule, with quality workmanship that conforms to original plans and specifications.
• Monitor daily construction details and daily progress in his area. Prepares schedules and supervises completion of a final punch list.
• Monitor the activities of subcontractors to ensure compliance with specifications and procedures and with the project objectives for safety, quality, productivity, schedule and cost. Provide solutions to subcontractor’s problems in order to achieve the successful execution of the project.
• Ensure that the material handed over to the Subcontractor is controlled, preserved and issued for the intended purpose.
• Pre-commissioning, Commissioning and start-up support to operations.
• Coordinate with Area engineers and Supervisors to ensure that daily or weekly project activities in the assigned areas been carried out in a safe and timely as per plan.
• Involve in design of the cleaning pigs like MBCT & profile.
• Involve in design of inline inspection pigs like MFL, UT, IMU and TFI
• Prepare configuration for short and long run for different size of pipelines
• Prepare configurations as per different pipelines schedules.
• Prepare drawings for complete tool.
• Pipe fabrication and erection of LPG plant at Sanjoro Gas Processing Facility, OGDCL, Sindh.
• Pipe Fabrication and laying of Dia. 6” Sch. 40 API5L X52 3LP coated 25 KM flow line from Dachrapur to Daru Gas Processing facility(OGDCL) and construction of Well Head Facilities at Dachrapur Well Sindh.
• Fabrication and Erection of 16” flue line at Kunnar Gas Processing Facility, OGDCL
• Repair of Crude storage tanks at Kunnar Plant, OGDCL.
• Involve in design, Fabrication and Erection of Pressed Glass Furnace, Distributor, Fore-hearths, Batch Plant, Chimney, Steel Truss and Furnace Oil tank Steel Structure.
• Involve in capacity calculations, Material estimation and B.O.Q formation for the project.
• Involve in layout of plant basic utilities i.e. Water, Compressed air, Natural Gas and Furnace Oil.
• Involve in Glass Furnace refractory construction.
• Involve in Furnace Cooling Air Duct Fabrication and Erection.
I have done B.E (industrial engg.) from dawood college of engineering and technology, karachi and have got more than 5 years of work experience in different organization as a Mechanical Engineer whose details are given in the experience section.