Senior Project Engineer
Petroshahd Petroleum Co.
Total years of experience :12 years, 9 Months
o First Project Engineer at the company technical office for one week and the other week at the field as site engineer (Consultant).
o Planning, implementation and supervision for all Projects including the following Activities.
(Feasibility study, Basic Engineering, Detailed Engineering, Procurement, Contracts Preparation and Awarding)
o Design two steel structure building with total area 300 m².
(One for Petroshahd work shop and the other for Exploration ware house)
o Design an architecture plan for the new camp of the company and design all concrete buildings with all infra structure, and then participate and supervise in the execution of the project. (We made a record to execute the total project in three months)
(The Project consists of 6 villas category (A, B), Mess hall (30m x 20m), refrigerator (4m x 9m), construct drainage network and connect the entire project on it).
o Design a drainage network system for Qarun station and then Participated and supervised in the execution of the project. (This Project saved about 650K$/ year) Main Contractor: PETROMAINT
(The project consists of 24 underground inspection rooms, underground concrete tank with large capacity and then recycling the oil again to the tanks with pumps station. This project saved the oil for the company from spill).
o Work in Project dep. tenders as a technical engineer and as the head of committee of the tender, prepare the scope of work.
o Pipe Line 86km, 30Thousands bbl/day. (Project Starts from August 2014 - November 2016) “27 Million $” Main Contractor: PETROJET
(Construction a pipe line 3.8 km with dia. 6” passes through Shahd station to Shahd S.E station that will pumping the total oil to Qarun station through a pipe line 82.2km with dia. 10”. Each station will have a new facility to facilitate the oil with a large capacity).
• Each station will have: Eight tanks foundation each 2400bbl with its bund wall, pumps station, power station, control room, lighting towers, and receiver & launcher areas.
• The project helped us to reduce the cost of the oil barrel from 2.95$ to 2.45$, and this will make the company earn about 3, 240, 000 $/year.
o Worked as project site manager in the execution of the drain pipe line for SHAHD S.E station which help to save the new oil pipe line from damage and increase its life time.
• WORK EXPERIENCE:
Five years experience in infrastructure, drainage networks, and circular foundation for steel tanks, post-tension slabs, pipe lines and general constructions for all buildings.
A great working knowledge of construction sequences and standard work procedures of the building structures.
Wide experience in the oil/gas field such as site preparations for oil wells, tanks foundations, installation of steel tanks, pipe lines, bund wall, water retaining structures, fences & barriers, contracts preparation & awarding, commissioning and start up for all projects.
A great working knowledge of construction sequences and standard work procedures of the building structures.
Projects:
o PETROSHAHD’s Company Fire fighting building.
(Steel shed with area 200 m² with all concrete foundation, installation of steel structure and finishing works for all offices).
o Extension for SHAHD South East Station.
(Which included three ring beams foundation for steel tanks each 2400 bbl each with bund wall).
o Site Preparations. (Eight locations)
(Which include a rig foundation with dimension 18m x 25m with a cellar 3m x 3m x 3m depth and leveling for all the location with dimension 60m x 60m).
o Extension for Qarun Receiving Area.
(Which include four ring beams foundation for steel tanks each with bund wall, four steel lighting towers, interlock walkways and leveled piping supports).
o Maintenance and construction work on the desert road.
(Orientation and supervision of all the equipment for maintenance and construct the desert roads knowing that at Petroshahd I responsible for minimum 200 km of desert road).
Senior project engineer at Petroshahd company