مصطفى عبدالمولى, MEP Project Manager

مصطفى عبدالمولى

MEP Project Manager

Electrotech

البلد
الإمارات العربية المتحدة - رأس الخيمة
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
17 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 6 أشهر

MEP Project Manager في Electrotech
  • مصر - القاهرة
  • يناير 2022 إلى أغسطس 2023

1. Participate in a kick-off meeting with the client and consultant to obtain
basic information and an overview of the project such as (Budget,
Deliverables, project key persons and contacts, …)
2.Attending internal Kickoff meeting sharing the project information and roles
among the project team (Duration, Deliverables, who is doing what, …..)
3.Collecting the project package (Contract, IFC package, Document
formats…) and distribute to other teams (Technical, Planning, Site, ….)
4.Reviewing and full understanding of the project contract.
5.Reviewing carefully the project package specially (Budget with all the
related documents received from Tendering ) highlighting all concerns with
the proposed available solutions and listing the high risks concerns to Escalate
to the upper management,
6. Coordinate mobilization with the needed tools (Office spaces, PCs,
Furniture's, Transportations….)
7.Assigning the document controller to document everything during project
life cycle.
8.Create project team organization chart and approve from consultant and
client.
9.Coordinate with Planning and top management project (Schedule, Budget
, Scope ) listing project milestones.
10. Engineering monitoring with technical team and consultant.
11. Oversight of timely delivery of materials with procurement.
12. Manage all resources required to carry out the construction and supervise
construction activities with the construction team.
13. Oversight of interim payment invoices and coordination with all parties
involved
14. Monitoring of Changes or Orders to Change by All Affected Parties.
15. Manage and document all project communication with all parties
involved.
16. Participate in progress meetings with updated progress reports.
17. Creation of personnel KPIs based on company policy.
18. Conflict management and Problem Solving..
19. Manage risks to keep projects on budget and on schedule, and take
precautions to avoid or minimize adverse impacts.
20. Escalate risks to senior managers as needed.
21. Track project documentation archives.
Projects :
1- KENT COLLEGE SCHOOL - Giza - Egypt
Client :
SAGA INVESTMETS.
Consultant :
HOWEEDY CONSULTANT
Project Description :
2 Buildings (School building + Service Building + Site Layout )
School Building includes 4 Educational Floors (L.G with Kids Swimming pool,
GR, 1St, 2nd & Roof)
Service Building includes 1 floor (Main Food Court + Main Kitchen + Parking
Garage)
Site Layout includes (Playground + Infrastructure networks + U.G W.S Pump
Station + F.F Pump Station + UG W.T).
Project Status : Under construction - 70 % Progress
Project MEP Cost : 80, 000, 000 L.E
2- Radisson Blu Hotel Extension - Alexandria - Egypt
Consultant :
SABBOUR CONSULTANT
Project Description :
Building (Basement “W.S & F.F Pump room + Conference Halls” + 4 Guest
Floors “150 Guest Rooms”+ Roof + Site Layout )
(Basement W.S & F.F Pump room, GR, 1St, 2nd, 3rd & Roof)
Project Status : Under Construction - 80 % Progress
Project MEP Cost : 60, 000, 000 L.E

MEP Site Manager في LMS construction
  • مصر - القاهرة
  • يناير 2020 إلى يناير 2022

1. Participate in a kick-off meeting with the client and consultant to obtain
basic information and an overview of the project such as (Budget,
Deliverables, project key persons and contacts, …)
2.Attending internal Kickoff meeting sharing the project information and roles
among the project team (Duration, Deliverables, who is doing what, …..)
3.Collecting the project package (Contract, IFC package, Document
formats…) and distribute to other teams (Technical, Planning, Site, ….)
4.Reviewing and full understanding of the project contract.
5.Reviewing carefully the project package specially (Budget with all the
related documents received from Tendering ) highlighting all concerns with
the proposed available solutions and listing the high risks concerns to Escalate
to the upper management,
6. Coordinate mobilization with the needed tools (Office spaces, PCs,
Furniture's, Transportations….)
7.Assigning the document controller to document everything during the
project life cycle.
8.Create the project team organization chart and approve from the
consultant and client.
9.Coordinate with Planning and top management project (Schedule, Budget
, Scope ) listing project milestones.
10. Engineering monitoring with technical team and consultant.
11. Oversight of timely delivery of materials with procurement.
12. Manage all resources required to carry out the construction and supervise
construction activities with the construction team.
13. Oversight of interim payment invoices and coordination with all parties
involved
14. Monitoring of Changes or Orders to Change by All Affected Parties.
15. Manage and document all project communication with all parties
involved.
16. Participate in progress meetings with updated progress reports.
17. Creation of personnel KPIs based on company policy.
18. Conflict management and Problem Solving..
19. Manage risks to keep projects on budget and on schedule, and take
precautions to avoid or minimize adverse impacts.
20. Escalate risks to senior managers as needed.
21. Track project documentation archives.
Projects :
1- MENA HOUSE PALACE RENOVATION - Giza - Egypt
Client : Egoth.
Operator : JW Marriott.
Consultant : Hill International Project Description :
(7th guest Floors (6th, 7th, 8th, 9th, 10th, 11th, 12th & Roof) + Public areas (1
Bs + Gr.& Lobby + 1st + RF) + Outdoor Swimming Pool + infrastructure networks
+ Extension of the energy building.
Project Status : Under Renovation Project Cost : 530, 000, 000 L.E

MEP Coordinator في CRC - Dorra
  • الإمارات العربية المتحدة - أبو ظبي
  • ديسمبر 2018 إلى يوليو 2019

1. Monitoring technical work (workshop drawings, coordination drawings,
material submittals, etc.) with technical team and consultant.
2. Monitoring material delivery status with procurement team for particularly
long lead items delivery to take necessary preventive actions in case of any
anticipated delay.
3. Overseeing and confirming that installed materials are compatible with
approved materials
4. Oversee quality of store and stored equipment.
5. Collaborate with quality control team and on-site team to monitor and
control quality of MEP's work in timely manner.
6. Track IR productivity with onsite team.
7. Coordinate site work and necessary approvals among concerned parties
before work commences.
8. Report work progress to direct manager.
9. Track project package updates with all affected parties.
10. Monitoring and following up MEP correspondences.
11. Distribute work packages or updates to site instructions and report any
relevant impacts to project manager so that project manager can take
necessary action accordingly.
12. Oversee issuance of interim payment invoices and reconciliation to
subcontractors according to scope of work.
13. Participation in technical and progress meetings.
14. Supervision and coordination of closing process (documentation such as
snag list covering, “as-built drawings”, final QS sheets, final invoice, T and C
certificates, regulatory certificates, warranties, O and M, handover
certificate).
Projects :
1- Janana Tower - Al Khalidiyah - Abu Dhabi - UAE Client : EPICO.
Consultant : PIONEER
Project Description : 4 Bs + Gr. + Mezz + 16 Typ. + RF + TRF Floors Project Status :
Under construction
Project Cost : 101, 500, 000 AED
2- Najmat Tower - Al Reem Island - Abu Dhabi - UAE Client : Reem Developer.
Consultant : Unii
Project Description : 3 Bs + Gr. + 3 Podium + 3rd Podium open swimming pool
+ 36 Typ. +
RF+ TRF Floors
Project Status : Under construction Project Cost : 239, 500, 000 AED
3- Al Hameli Tower - Al Falah -Abu Dhabi - UAE Client :ADCB.
Consultant : Shaheen Engineering Consultancy.
Project Description : 4 Bs + Gr. + Mezz.+ 15 Typ. + RF+ TRF Floors Project Status :
Testing and commissioning phase

MEP Coordinator - Mechanical Technical Manager في LEEDS (Leaders in Energy & Electromechanical Developments & Services)
  • مصر - القاهرة
  • يوليو 2015 إلى ديسمبر 2018

MEP Coordinator:
1.Participation in technical and progress meetings.
2.Support on-site team with necessary approvals among concerned parties.
3.Collaborate with quality control team and on-site team to monitor and
control quality of MEP's work in timely manner.
Mechanical Technical Manager:
1. Review the received IFC package (drawings, B.O.Q, specifications).
2. Prepare a verification report of the IFC package received, listing all missing
documents and concerns (technical, contractual, coordinating) and relevant
documentation (letter, RFI, VO, V.E., etc.) forward to the relevant parties.
3. Leads and collaborates with technical teams (engineers and draftsmen) to
create workshop drawings (HVAC, Plumbing, Fire fighting) and uses software
to create relevant and necessary calculations such as (HAP, Elite, External
Static, Pump Flow, Pump Head, Microsoft Office. etc) Compliant with local
and international standards (ASHRAE, SMACNA, IPC, NFPA, etc.)
4. Perform a technical review of material documentation to apply actual
dimensions to workshop drawings.
5. Support on-site team with flexible alternative solutions for coordination
during construction.
6. A reminder about the delay in requesting materials from the procurement
department.
7. Reminding consultant of delays in responding and approving technical
documents (workshop drawings, material submittals, RFIs, etc.)
8.Report progress to direct manager.
9. Complete all technical project work.
10. Assist on-site team in creating as-built drawings.
Projects :
1- Carrefour - Mall of Egypt - 6th of October - Egypt.
2- VOX Cinema - Mall of Egypt - 6th of October - Egypt.
3-Alsson School - New Giza - 6th of October - Egypt.
4- Bonjourno Factory - 6th of October - Egypt.
5- Metlife - Office Building - New Cairo - Egypt.
6- Allegria Club house - Sodic - 6th of October - Egypt.
7- Polygon - Office Building - Sodic - Sheikh Zayed - Giza - Egypt.
8- Al Mansoura - Office building - New Capital - Cairo - Egypt.
9- SICO Mobile Phones Factory - Assiut - Egypt.
10- Semiramis Intercontinental Hotel - Main Ball Room Renovation-Cairo -
Egypt
11-Seashell Resort - North Coast - Egypt.
12-Hall of life - New Capital - Egypt.
13-Covered Hall - New Capital - Egypt.
14- Sky Mall - Sheikh Zayed - Giza Egypt.
15- WE- Egypt Telecom Centrals (Renovation F.F Plants) - Cairo - Egypt.

SR.Mechanical Engineer - Supervision في Mechanical Electrical Design (MED)-(ENG-ABD ELHAMID BAKRY) - EGYPT
  • مصر - القاهرة
  • يوليو 2010 إلى يوليو 2015

1. Review and approve material submittals and relevant calculations to
ensure they meet project technical specifications and project requirements
according to the defined scope of work.
2. Check and approve the workshop drawings and coordination drawings.
3. Work with other departments to solve coordination issues.
4. Review and approve the submitted MIRs and Contractor IRs.
5. Respond to submitted RFIs and escalate deep technical issues to designers.
6. Submit required site instructions and NCRs to contractor.
7- Participation in technical and progress meetings.
8. Review and approve contractor interim payment invoices and make
appropriate deductions.
9. Review work clearances and coordinate with other departments.
10. Issue a work snag list at the project completion stage to ensure
completion of work and systems to achieve specified deliverables.
11. Participation in HVAC testing and balancing (air and water)
12. Monitoring, testing and commissioning of all systems to ensure they are
operating properly and achieving specified performance and issuing the
relevant certificate.
13. Review and approve contractor handover documents (As built drawings,
final QS sheets, final invoices, T and C certificates, regulatory approvals, O
and M, warranties, spare parts).
14. Review and approve hand over certificate.
Projects :
1- MR.MOHAMED MANSOUR PRIVATE VILLA @ WARRAK -GIZA -(Egypt)-
(design)-(VRV system )
1floor main building contains bedrooms, home cinema, reception halls,
dining hall, library with private office& main kitchen + 1 floor gym building +2
floor of two small private villas + 2 floor stuff building + 1 floor security building
+3 swimming pool + outdoor site VRV plant Total capacity: ( 5 outdoor Heat
Recovery VRV units 36 T.R each serving indoor FCUs + 3 outdoor Heat Pump
VRV units 50 T.R each serving indoor AHUs + 2 outdoor DX units 26.5 T.R Serving
2 AHUs of Gym building + Split DX units serving stuff and security buildings).
2- PHIELA TOURISTIC BOAT @ (Egypt)-(design)-(chilled water system )
4 Deck boat contains Restaurant, Main Kitchen, Cafeterias, Health Club,
Disco & Guest Bedrooms.
Total capacity: ( 2 Existing Water Cooled chillers 110 T.R each)
3- FOOD AND BEVERAGE MALL @ 6TH OF OCTOBER -GIZA -(Egypt)-(design)-
(chilled water system )
4floor building contains F&B shops and car park.
Total capacity: ( 4 Air Cooled chillers 380 T.R each with one chiller standby)
4- ABB ADMINISTRATION BUILDING @ 10TH OF RAMADAN -(Egypt)-(design)-
(chilled water system )
3floors building contains offices + Roof plant.
Total capacity: ( 3 Air Cooled chillers 110 T.R each)
5- PORTO NEW CAIRO @ CAIRO -(Egypt)-(design)-(chilled water system )
1 Garage floor of 54, 000 m2 for car park + 1 Retail floor contains Restaurant
, shops, coffee
shops, Mall Area, food court and Hyper Market + 1 Ground floor contains
Restaurant
, shops
, coffee shops, Anchor stores, Mall Area, Health club, Residential
Apartments And Administration building + 8 floors of Residential Apartments
and Administration + Roof plant.
Total capacity: ( 2 Plants of Absorption chillers “First plant 3250 T.R + Second
Plant 2750 T.R”)
Supervision)-(chilled water system )
6- NAGUIB MAHFOUZ RESTAURANT -KHAN ELKHALELY @ CAIRO -(Egypt)-
(Supervision)-(chilled water system )
Project summary:
One floor contains Restaurant, Main Kitchen & Café shop. Total capacity: ( 2
Air Cooled chillers 110 T.R each)
7- FOOD MOOD BUILDING @ 5TH TAGMO3 -CAIRO -(Egypt)-(design)-(VRV
system )
4floor building contains Lobby, tenant restaurant shops and car park. Total
capacity: (240 T.R )

Senior Mechanical Engineer - Supervision في Consultancy Engineering Group (CEG)
  • المملكة العربية السعودية - الرياض
  • يوليو 2009 إلى يوليو 2010

1. Review and approve material submittals and relevant calculations to
ensure they meet project technical specifications and project requirements
according to the defined scope of work.
2. Check and approve the workshop drawings and coordination drawings.
3. Work with other departments to solve coordination issues.
4. Review and approve the submitted MIRs and Contractor IRs.
5. Respond to submitted RFIs and escalate deep technical issues to designers.
6. Submit required site instructions and NCRs to contractor.
7- Participation in technical and progress meetings.
8. Review and approve contractor interim payment invoices and make
appropriate deductions.
9. Review work clearances and coordinate with other departments.
10. Issue a work snag list at the project completion stage to ensure
completion of work and systems to achieve specified deliverables.
11. Participation in HVAC testing and balancing (air and water)
12. Monitoring, testing and commissioning of all systems to ensure they are
operating properly and achieving specified performance and issuing the
relevant certificate.
13. Review and approve contractor handover documents (As built drawings,
final QS sheets, final invoices, T and C certificates, regulatory approvals, O
and M, warranties, spare parts).
14. Review and approve hand over certificate.

Senior Mechanical Design Engineer في Mechanical Electrical Design - MED
  • مصر - القاهرة
  • أكتوبر 2005 إلى يوليو 2009

1. Participating preparation of mechanical design concept.
2.Preparation of preliminary design drawings with draftsmen.
3. Supporting optimal system selection for client.
4. Collaborate with team (engineers and draftsmen) to create IFC packages
(drawings, B.O.Q, specifications) using AutoCAD and Microsoft Office as well
as software programs related to mechanical discipline (HVAC, plumbing,
firefighting) such as (HAP, Elite, External Static Pressure, Pump Flow, Pump
Head, etc.) Complies with local and international standards (ASHRAE,
SMACNA, IPC, NFPA, etc.)
5. Equipment proper selection.
6. Work with BMS team to control and sequence operation of mechanical
systems
7. Work with Fire Alarm team to interface Mechanical systems as required.
8. Provide electrical team with actual power consumption of selected
mechanical equipment.
9. Provide structural team with necessary shafts and concrete slab openings
required for mechanical work.
10. Provide architectural team with necessary mechanical space and proper
equipment placement, in addition to mechanical requirements such as
exposed outlets, access doors, and false ceiling heights that must be included
in ID drawing.
11. Coordinate architectural fire zones and escape routes to be considered
and coordinate them with mechanical fire protection package releases such
as (smoke management packages, fire fighting, etc.).
12.work with Architectural and electrical teams on a complete life safety
package with fire scenarios (escape routes and their architectural
considerations, smoke management, fire fighting package, fire alarm, natural
gas, etc) and their considerations where comply with authorities.
13. Participation in technical meetings.
PROJECTS:
1- Ramses Hotel. (Wady lahmy-Red sea -Egypt)-(Design)-(District cooling
chilled water system )
8 building clusters (360 guest room) +10 building suite +main building (3 floors
contain
reception, main restaurant, kitchen, shops, cafeterias, car parking in
basement floor) Total capacity: (960 T.R)
(6 water cooled chiller 160 T.R each.)
2- Sharming Hills Resort:(Sharm El-sheikh-Egypt) (supervision)(A\C-FirefightingPlumbing)
10 Clusters contain 267 guest rooms (KING& DOUBLE) - Main building (3 floors
contains SPA, main restaurant, reception, Management offices )
-Landscape contains entrance fountain, 3 swimming pools one is heated+
kids pool- sewage
treatment plant - boiler plant - water tank
Total capacity: VRV units for clusters with different capacities- (2 air cooled
chiller 165 T.R each with one chiller standby )
3- Conrad Hotel Cairo "Main Restaurant & Bar ". (Egypt)-(Redesign)-( Chilled
water System).
Main restaurant & kitchen @ first floor
- Four seasons hotel (Residential part) Private apartment Floor 29th & 27th
(Egypt)- (Design
& supervision)- (chilled water system).
5- Jasmine palace hotel - Sahl hashish-red sea (Egypt)-(Design Review)-
(Chilled water
System).
Extension as 4 floors building containing (shops, restaurants, main
kitchens, laundries, management offices & lobbies )
Total capacity :(3 Air cooled chiller 150 T.R each with one chiller standby)
6-Boutique hotel @ Zamalek (Egypt)-(Design)-(VRV System).
4 floors building contains (guest rooms, restaurants, lobbies, main kitchens&
laundries) Total capacity :(550 T.R)
7- City escape Mall @ 6TH October City (Egypt)-(Design)-(Chilled water
System).
Project summary:
4 floors building contains (shops, restaurants, management offices, lobbies &
cinema) Total capacity :(3 absorption chiller 360 T.R each with one chiller
standby)
13- HSBC Bank-Smart village-Cairo (Egypt)-(Commissioning Agent for "LEED"
certificate)

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Cairo University - Faculty of Engineering - Mechanical Power Engineering Department
  • مايو 2005

Bachelor Degree: Cairo University - Faculty of Engineering - Mechanical Power Engineering Department

Specialties & Skills

Contracts Review
Construction Project Management
Fire Fighting
Plumbing Design
Familiar with LEED requirement
Design and Planning
Estimating
Teamwork and Collaboration

اللغات

العربية
اللغة الأم
الانجليزية
متوسط

العضويات

Egyptian Engineer Syndicate
  • N/A
  • October 2005

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
November 2021
Plumbing System Design (تدريب)
معهد التدريب:
ENGSOFT
تاريخ الدورة:
October 2016
المدة:
48 ساعة
Fire Fighting System (تدريب)
معهد التدريب:
ENGSOFT
تاريخ الدورة:
July 2016
المدة:
48 ساعة
HVAC System Design (تدريب)
معهد التدريب:
ENGSOFT
تاريخ الدورة:
March 2016
المدة:
120 ساعة

الهوايات

  • FOOTBALL
    N/A