Trainee
ECG
مجموع سنوات الخبرة :2 years, 4 أشهر
• three weeks in the office in infrastructure department reading shop drawings and working on civil 3d
• eight weeks at al mariot hotel (under construction) learning different aspects of the work .
• dewatering, stairs, composite beams and columns consultation
• Utilization of Municipal Solid Waste Incineration Fly Ash in Cement Mortars and Leaching Behavior
• Analysis of the fly ash we have from Municipal Solid Waste
• Determine the suitable replacement of those fly ashes instead of cement in a ratio of 10%, 20%, 30% and measures the compressive strength, permeability, leaching ....etc .
• Writing reports on the results and recommendations
• reading shop drawings
• asset technical in taking the reading
try to make interview with especial persons and this interview is on aproduct that the company make researchs on its quallity , and other things.
also i worked there for a period of time in the callcentre