Engineering Project Manager
Al-Moasron Group
Total years of experience :8 years, 2 Months
Responsibilities & Duties:
1. Project manager for the new white cement grinding plant in Jordan. (480 tons per day)
2. Responsible for feasibility studies, tendering, and technicalities.
3.Responsible for the group plant’s OEE reports and monthly performance evaluation.
4. Creating estimates and studies for the raw material costs and sourcing.
5. Creating estimates and reports for the group plant’s OPEX and make development plans.
6. In charge of conceptual design, tendering, technical evaluation, and purchase for a specific project.
7. Responsible for Erection and commissioning for any new production line in the group’s plants.
**** For the current white cement grinding plant, Responsible for:
1. Prepare Global contracts. (Equipment, Installation, Logistics, and technical annexes).
2. Prepare local contracts. (Excavation, Civil, MEP, Landscape, Steel Structure, and technical annexes).
3. Prepare Governmental requirements. (EIA, Investment documents, Licensing, and regulatory).
4. Site management. (Mobilization, Site control, payments and financial control, scheduling, and reports).
5. Overall Project Management.
Responsibilities & Duties:
• Analyzing project specifications & Developing work schedules.
• Ensuring that each project stays within the allocated budget and timeframe.
• Preparing conceptual designs, studies, reports and technical proposals.
• Mechanical equipment erection and commissioning such as vertical cement mills, Packing plants, Bucket elevators, Silos, and other production line equipment’s.
• Preparing call for tender documents, BOQs, and pricing.
• Design project’s infrastructure such as water piping, Firefighting pipelines, and sewage networks.
• Performed CFD and static simulations to solve any issue facing processes or cement production.
• Create project handover protocols, supervise performance testing, and prepare all project documents such as governmental clearances, time sheets for international specialists, and acceptance certificates.
• comprehensive maintenance and upgrading of CEMENTRA's MEP and BMS systems, including domestic water, flush & sewage, fan coil units, chilled and hot water network, parking ventilation systems, firefighting and fire alarm systems
Skills:
• Excellent team leading and site supervision capabilities.
• Effective and efficient technical skills.
• Well-developed Project management skills.
• Experienced in equipment erection, commissioning and performance testing
• Excellent abilities in mathematical modeling and control design using Matlab.
• Enjoys mechanical design and simulation using Solidworks statics and CFD
• Enjoys searching for better engineering solutions
• Superior and efficient problems-solving skills.
• Curious and well-organized.
• Friendly and well-mannered verbal and written communication skills
• Well-developed analytical and numerical ability
• Flexibility and adaptability to heavy workload
• Confident educated decision-making and negotiation
• Excellent ability to present design ideas and plans.
• Excellent Experience in troubleshooting and commissioning of facilities mechanical and plumping systems
• Enjoys operating and maintenance of the latest Fan coil units and the district cooling and heating chillers.
• Familiar with the BMS systems and can operate any facility systems efficiently.
• Adopt appropriate supplier management methodologies and procurement strategies, by searching for new suppliers.
• Saving four times more than the requested “saving” target of my annual budget by sourcing and attending any exhibition presenting new markets to find better alternatives brands.
• I was able to make a 20-30% saving in some of the annual rotini requisitions by changing the delivery terms and conducting a third party.
• Carry out the required procedures to obtain the necessary governmental certificates.
• Adopt appropriate supplier management methodologies and procurement strategies, by searching for new suppliers.
• Saving four times more than the requested “saving” target of my annual budget by sourcing and attending any exhibition presenting new markets to find better alternatives brands.
• I was able to make a 20-30% saving in some of the annual rotini requisitions by changing the delivery terms and conducting a third party.
• Carry out the required procedures to obtain the necessary governmental certificates.
-UPS and diesel Generators installment and maintenance.
(Equivalent to a Bachelor of Mechatronics Engineering, as determined by World Education Services in Toronto, ON- ICAP package)
High school general examination score 88%, (scientific branch).