Moustafa Soliman, Resident Engineer Roads and infrastructure

Moustafa Soliman

Resident Engineer Roads and infrastructure

CDM Smith

Location
United Arab Emirates - Sharjah
Education
Bachelor's degree, Civil Engineering
Experience
22 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 11 Months

Resident Engineer Roads and infrastructure at CDM Smith
  • United Arab Emirates - Dubai
  • My current job since December 2019

Resident Engineer, CDM Smith Inc, Dubai-UAE, Dec. 2019 - Present.

Projects Involvement:

▪ TR 399 Construction, Completion and Maintenance, in the Defects Liability Period, the Chilled Water Piping Network Extension to “The S Tower” at TECOM A.
▪ TR370 Construction, Completion and Maintenance in Defects Liability Period of Treated Sewerage Effluent (TSE) Network Connection to BB2 & BB5 District Cooling Plant.
Duties and Responsibilities:
Responsible for overall Contractor management, construction program, including contractual matter, contract administration, leading the progress meetings, Progress reporting, all technical reviews, site inspections etc.). Coordination with all stakeholders / Authorities related to project and assist Contractor to obtain all construction NOC’s required prior to start works as required for the project as below:
▪ Communication with the Client and the contractor regarding project budget, progress, area of concerns to sort out of any project related issues.
▪ Monitoring and leading the Contractor’s progress and quality of the works to complete the project as per contract.
▪ Reviewing and approving the contractor payments, variation orders and issuing the required site instructions related to the project after coordinating with the client.
▪ Preparing, reviewing all the report related to the project required by the client or other stockholders.
▪ Promoting technical excellence on the project, including furtherance of quality
improvement process, ensuring that adequate checking performed in accordance with the consultancy policy & procedure.
▪ Ensure to obtain different types of NOCs as required for the project with contractor (Information, trial trench and construction NOC’s) through RTA - e NOC system and the requested supporting documents for Service Authorities to be responded on time.
▪ Ensure to Obtain the approval from the services Authorities for the proposed work and for the utility distribution cross section drawings.
▪ Attend all meetings with the relevant Service Authorities and Providers Such as (DEWA, DM, DU, Etisalat, etc.) to solve the pending issues regarding their services.
▪ Coordinate with the Contractor’s on a frequent basis to ensure that no issues are encountered.
▪ Manage the project team to avoid any failure of the Contractor to conform to drawings plan and specifications and to provide good workmanship.
▪ Ensure that the works are being constructed to the latest construction and shop drawings.
▪ Liaise with the design office Engineer(s) when required.
▪ Ensure that works are compliant with the Contractor’s HSE plans at all times.


CDM Smith - Dubai
Project: R1020/1B - Up grade Dubai - Al Ain Road (Contract 1B)
Client: M/s Roads and Transport Authority - RTA).
Consultant: M/s CDM Smith - Dubai
Contractor: GUNAL Contracting.

Project R1020/1B starts from the chainage 3+700 at Oud Metha intersection with Ras Al Khor Rd - E44 (Bu Kidra Interchange) till the intersection with Sheikh Mohamed Bin Zayed Road - E311 (Nad Hessa Interchange) at chainage 13+300 for approximate length of 9.6 KM.

The scope of work includes:
• Upgrade the road from 3x3 dual carriageways to a 6x6 dual carriageway with CD roads on both sides of the road till Meydan-Manamah Interchange.
• Existing Bu Kidra Interchange shall be enhanced from 3 lanes per direction to 4 lanes, till its connection with Oud Metha Road.
• Major Structural works involve the construction of Meydan-Manamah Interchange, Nad Al Shiba Signalized Interchange connecting both Nad Al Shiba 1st and 4th areas.
• Install, modify and protect the underground utilities like DEWA-WD, DEWA-ED, Irrigation system, Drainage system, ETISALAT, DU, Street light, ITS, Landscaping and Duct works.

Project Manager at Flora Boring Infrastructure - Dubai
  • United Arab Emirates - Dubai
  • My current job since January 2017

FEB 2017 - NOV 2018 Flora Boring Infrastructure - Dubai
Position: Zone Manager
Project Value: (170, 000, 000AED)
Project: Infrastructure Works to Night Market & Board Walk - Palm Deira
Client: M/s NAKHEEL PJSC.
Consultant: AE7.

The project is construction of roads and infrastructure between 39 retail building and 15 F&B Buildings and marine area as the following:

• Construction of sewerage network which consist of 2209 lm pipe laying and 46 MH´s along with 34 HC´s including testing.
• Construction of storm network 2350 lm which include 37 manholes including 113 gullies.
• Construction of water network 4400 lm including 20 valve chambers.
• Construction of irrigation network 1230 lm including 14 valves.
• Construction of firefighting network 3200 lm including 14 valve chambers, 31 Hydrants, washouts, and air release.
• Construction of fire protection network 3500 lm including 71 valve chambers, washouts, and air release.
• Tiling works for 150, 000 m² including formation and sub base and FALAJ water feature.
• Construction of various ducts 11 Kv, irrigation, street light, gas.
• Construction of telecommunication network 2700 lm with chambers 46 Nos.
• Construction of chilled water network 63 chambers including FOC network.


Flora Boring Infrastructure - Dubai
Position: Project Manager
Project Value: (32, 000, 000AED)
Project: Infrastructure Works to green community phase II & III
Client: M/s National Properties.
Consultant: Arif & Bin Toak consulting architects and engineers.

The project is construction of roads and infrastructure for two phases II (95 Villas) & III (137 Villas) as the following:

• Construction of sewerage network which consist of 2082 lm pipe laying and 23 MH´s along with 81 HC´s including testing.
• Construction of storm network which include 16 manholes including 32 gullies and installation of infiltration tanks.
• Construction of water network 1429 lm including 19 valves, and 2 shutdowns.
• Construction of irrigation network 960 lm including 15 valves.
• Construction of firefighting network 1135 lm including 10 hydrants, washouts, and air release.
• Road works for 10700 m² including kerbstone 2364 lm.
• Construction of various ducts 11 Kv, irrigation, street light, gas.
• Construction of telecommunication network with chambers
• Construction of street light network 34 light poles with cables.

Construction Manager at 2017 Ghantoot Road Contracting
  • United Arab Emirates - Dubai
  • November 2013 to January 2017

Project Value: (59, 000, 000AED)
Project: Infrastructure Works to EPR. Roads & South Commercial 3rd Party Plots.
Client: Nakheel PJSC.
Consultant: Dar Al-Handasah Consultants (Shair and Partners).

The project is continuation of previously stopped project which required coordination with existing utilities been laid earlier

• Construction of sewerage network which consist of 1711 lm pipe laying and 24 MH´s along with 37 HC´s including testing.
• Rectification works for the existing network including adding new manhole replacing lines and repair works, upgrading of sewage lift station (02No´s)
• Construction of storm network which include 180 manholes including 358 gullies and installation of infiltration tanks.
• Construction of water network 2282 lm including 17 valves, 24 steel sleeve and 6 shutdowns.
• Construction of irrigation network 4602 lm including 18 valves and steel sleeves, washouts, and air release.
• Construction of firefighting network 5027 lm including 88 hydrants, washouts, and air release.
• Road works for 15400 m² including kerbstone 21500 lm.
• Construction of various ducts 11 Kv, irrigation, street light, gas.

Position: SR. PROJECT ENGINEER
Project Value: (91, 000, 000AED)
Project: R977, Various Improvements and Implementing Quick Wins Solutions.
Client: Roads & Transport Authority (RTA).
Consultant: Alturath Engineering Consultant.

Project Description:
• construction with all associated works such as earth work, pavement construction, asphalt work, road marking, sign board, Guardrail, New jersey barrier, street lighting .
• Laying all required ducts and services for future use for all service Authorities (DEWA (ED) & DEWA (WD), RTA, Irrigation Department, Street Lighting Department and ETISALAT Department.
• investigation, demolition and site clearance, earth work, in situ concrete, interface with existing roads, internal road network and parking areas, , civil works for MV/LV network, street lighting including feeder pillars and associated facilities, , storm drainage network, potable water network,

• Protection for existing utilities such as 132 KV cables, 11 kv cables.

• Construction of traffic signal civil works such as duct works, chambers, Stop loops and Scoot loops, piles, and following subcontractor for installation of the signal.

• Following Approved subcontractors for executing utilities works such as water line shutdown, and irrigation, traffic signal, street light shutdowns.

Project Engineer at KHARAFI NATIONAL
  • United Arab Emirates - Abu Dhabi
  • February 2009 to October 2013

Project: P-04 Construction of Saadiyat STP (EPCM Project).
Position: PROJECT ENGINEER
Project Value: (400, 000, 000AED)
Client: Tourist, Development, and Investment Company (TDIC).
Consultant: Parsons International Limited.

Project Description:
The project includes engineering, procurement, Construction, and management of sewerage treatment plant with capacity 76, 000 m³/day,
The project contains the following activities:

• Civil / process design for the plant which contain 27 Buildings, main pump station, force main (02 No's) including internal roads network 27000 M², sewerage network, and sewerage lift station (01 No's) and all related electrical and mechanical works.
• Building permit and other NOC's for executing NDM works.
• Construction of the plant buildings (27Nos), internal roads network 27000 M², sewerage, and sewerage lift station (01 No's).
• Construction of power substations (04 No's) and all related electrical works.
• Construction of the main pump station and force main 3000 lm - (02 No's) including all related works such as valve chambers, NDM/ HDD works for crossing Greek, 132Kv cables.
• Supply and installation of all related electrical and mechanical works.

Project: ADWEA Waste Water Treatment Plant BOOT (ISTP1) in Wathba - Abu Dhabi - UAE
Position: PROJECT ENGINEER
Project Value: (1, 300, 000, 000AED)
Client: Abu Dhabi Water & Electericity authority (ADWEA)
Consultant:

• Construction of pump station, and tanks inside the plant including shutter works steel fixing works and concrete works for foundation, walls, and roof.
• Fixing of GRP pipes inside the plant and structures.
• Road works inside the plant
• Construction of sewerage / storm manholes and gullies

PROJECT ENGINEER at Wade Adams Contracting
  • United Arab Emirates - Dubai
  • April 2008 to January 2009

Project: Roads and Infrastructure for Jabel Ali Palm Crescent (E)
Position: PROJECT ENGINEER
Project Value: (800, 000, 000AED)
Client: NAKHEEL.
Consultant: Hyder Consultant.

Execution of infrastructure networks at jabel ali palm crescent (E):
• Construct around gravity pipe line in difference diameter (from 200mm to 1300mm) and difference material (GRP and UPVC).
• Construct of street light works.
• Construct sewerage storm manholes in difference type.
• Fixing of storm water gullies

INSPECTION ENGINEER at ROADS & TRANSPORT AUTHORITY (RTA)
  • United Arab Emirates - Dubai
  • June 2004 to March 2008

Worked as a utility coordinator who is responsible to liaison with the authorities such as DEWA (ED & WD) DM, Etisalat, etc in resolving site related issues and obtaining relevant approvals
Inspection of all road elements in all emirate of Dubai to ensure that they are in full operational state Inspection all types of defects for different road elements such as settlement, cracks, rutting, depression, damage etc. Inspection of the work activities of the private contractors and other authorities such as DEWA, ETC, DM, to ensure that they are working according to the specs, regulations and laws Making suggestions for improvement of the function of road elements as a result of my comprehensive inspection of Dubai emirate net work Supervision of work execution of road maintenance contractors, such as earth works, services, sub base, road base, asphalt base coarse, asphalt wearing coarse, road signs, road marking and making detailed reports to the head of section. Participating in taking over inspection of completed new road projects, preparing snag lists and the necessary clearance certificate action.

CIVIL ENGINEER at Roshdy contracting and trading - Egyp
  • June 2001 to June 2004

Execution of extension of sewerage treatment plants including
the following:
* Pipe line installation for force main ductile iron materials
between the plant and the draying pits
* Sheet pile works and bracing for installation for installation od
AC pipes diameter (1800mm)
* Construction of thrust block for pipes.
* Mechanical installation for the plant (bridges, weirs, scrappers,
and motors)

Education

Bachelor's degree, Civil Engineering
  • at Zagazig University
  • January 2001

Civil Engineering

Specialties & Skills

strong personality
Ability to Work under Pressure
Very good communication skills
MICROSOFT WORKS
NETWORKING
BRIDGES
CUSTOMER RELATIONS
MATERIALS MANAGEMENT
MECHANICAL
SUPERVISORY SKILLS
TELECOMMUNICATIONS
CONSULTING

Languages

Arabic
Expert
English
Expert
Greek
Expert

Memberships

Society of engineers
  • Engineer