Project Engineer
Ahmed M.Ali Jaffari Est
Total years of experience :12 years, 5 Months
Estimation, preparation and assigning the resources such as manpower, materials, consumables, equipment, tools, etc.
Ensures that all site works are done according to all applicable quality standards and ensure daily problems are resolved.
Kept all clients, architects and consultants updated on project progress.
Supervising work to ensure compliance with client requirements.
Coach, mentor and motivate project teams to take positive actions and accountability for their assigned work.
Maintained all safety and quality control project standards.
Coordinate with the subcontractors and verify their quantities and quality of work.
Documentation of daily reports, requests and progress reports to consultants.
Managing all teams to their respective jobs according to time frame (schedule)
Estimates, prepares, cross-check and assigns the resources such as manpower, materials, consumables, equipment, tools, etc for projected work.
Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local, national or international standards.
Managing technical issues, shop drawings and Single Line Diagrams.
Plans the execution of all MEP related works and coordinates the works to Electrical, mechanical and civil group.
Doing all inspections for installed installation and testing to verify prior to inspection by the consultant Engineer
Preparing weekly reports on activities carried out and discussion the schedule and progress with the consultant.
Assist in project from start to finish, with the specified specifications, budget and time.
Handing over completed project work
Apply Project management knowledge and use personal
Checking the material received on site to be in compliance with requirements.
Managing technical issues and shop drawings.
Prepare electrical (power & lighting), fire alarm systems, Low current systems drawings.
Obtain drawing approvals from consultants for execution of work.
Dealing with client and consultant, executive meetings etc.
Investigate problems and recommend solutions
I was working as Network assistant at Telco Net Communication & Engineering, Islamabad since January 2012.My responsibilities were:
Network InfraStructure Configuration
VPN based Network Deployment
Troubleshoot Management
Wateen Telecomm Islamabad - Sep 01 to Dec 01 2012
Trainee (Wateen solutions)
• General overview of WIMAX technology
• Installations and trouble shooting of WiMAX (indoor CPEi600, outdoor
CPEo400 both), devices.
• Power survey in NORTH sites of WATEEN.
• Installation of media converter (optical fiber ring connectivity)
• Field deployment of complete LAN environment and providing support of
IT hardware, software and infrastructure
• Trouble shooting, administration and support of windows 2000 server and
Microsoft exchange.
• Deployment of LAN and WLAN.
• Configuration of Cisco routers and switches
• Responsible for providing level 1 and level 2 supports to different
corporate customer regarding their IT infrastructure
Al- Hakeem Traders- march 2012 to July 2012
Network Administrator
• To administer and maintain the network
• To ensure smooth communication
• To administer and maintain the server all computers (hardware and software) and peripherals thereby ensuring smooth functioning of the office
• To ensure smooth functioning of all templates and MS Office
Pakistan Telecommunication Company Ltd (PTCL) - Sep 2008 to Oct 2008
Internee
• 6 week internship with PTCL in OFNS (optical fiber network solutions)
• General overview of the Optical Fiber and SDH Technology
• Overview of Architecture of PTCL OFAN and Metro Networks
• Testing of Optical Fiber Links using OTDR, Optical Power Source/ Meter and SDH/ PDH analyzer.
PARTICAL TRAINING:
CCNA - training
• CISCO Academy, COMSATS campus, Islamabad
•
MCITP - training
CORVIT Rawalpindi
• Testing of Optical Fiber Links
• Pakistan Telecommunication Company (PTCL)
•
• Transmission Network (Optical Fiber)
Pa Pakistan Telecommunication Company (PTCL)
2005 - 2009 Army Public College Of Management & Sciences, Rawalpindi. (National University Of Modern Languages and Sciences, Islamabad) BE - ELECTRICAL ENGINEERING (Telecommunication)
2002 - 2004 Cadet College Sanghar, Sindh FSc. (pre-engineering)
2000 - 2002 Cadet College Sanghar, Sindh MATRICULATION (Science) DEGREE PROJECT: BE (ELECTRICAL ENGINEERING) Automatic Power Cut off System (human detection using camera) The system was designed for security purposes and other effective applications. HOG was the algorithm used. A camera placed in room will be watching the human presence, if camera not detects any human in room, the connected electrical appliances will be switched off to save the electricity.