Electrical Design Engineer/Technical Engineer/Lighting Designer
Arabian centres
Total years of experience :12 years, 4 Months
**Working in Development Department and I have the following Responsibilities:
-Datasheet and Technical specification preparation for all Electrical work.
-Design and preparing for shop drawings for the renovation work in all Arabian Centre's Malls .(Lighting System, Power System, Low Current &Grounding System)
-Reviewing all Design drawings &Shop Drawings for New Malls.
-Reviewing the MEP design for all retail shops &Restaurant .(HVAC, FIREFIGHTING, POWER, LIGHTING &LOW CURRENT).
- trying to Solve the Electrical faults in all mall
-SLD preparation .
-MCC and PMCC, Sub Distributions board schedule and sizing .
-Cable tray sizing and calculations .
-Generator &Transformer Sizing and selection .
-Lighting Calculation Using Dialux Evo.
**Achievements:
-Electrical design for Arabian Center's head office (Low current, Power System, Lighting System, Earthing) . Selections of all material.
-Power Load Distribution for Nakheel Mall, Tala Mall&Salma Mall including installation of all Materials .
-BMS System In Khurais Hospital.
-Design more than 500 Shops &Restaurant .
-Power System In Dabab Building.
-Design of Mall Management office in Aziz mall.
- Renovation Work For Tala Mall.(Lighting &Power).
-Reviewing of The MEP design for more than 400 Shops
-Solar lighting for Nakheel mall Parking.
-Reviewing all material submittals for all electrical projects
• Providing installation, maintenance and repairs on equipment within an assigned territory to assure continuity of customer operations and high levels of customer satisfaction.
• Responsible for owner ship of all customers issues that are voiced or observed and act appropriately.
DESI Conveyance Project:
• 13.8KV Switchgear.
• 500 KVA Auxiliary Transformers.
• AC/DC Auxiliary Systems.
• Cable Trays/Ladders.
• Indoor & Outdoor lighting.
• Earthing Network.
• Cable Pulling & Termination.
- Install a Cathodic Protection stations
-Distribute and Manage THE input and output power for the stations
- install fiber optic cable
2006-2011 Jordan University of Science and Technology, Irbid, Jordan Bachelor of Science (B.Sc.)