Planning & Control Manager
Sarooj Construction Company LLC
Total years of experience :18 years, 0 Months
Project Title: BP Khazzan Gas project - Civil Packs 4 & 5
The project includes the construction of 56 well pads (53 Production well pads & 3 Water disposal well pads) and 130 km of infield roads for the BP Khazzan tight gas field within Block 61 in Oman.
Client: BP Exploration
Project Administrator: Jacobs
Project Title: BP Khazzan Raw Water Treatment Plant Civil Works In partnership with Veolia Water,
The project includes all civil works for a Raw Water Treatment Plant in the BP Khazzan tight gas field within Block 61 in Oman.
Client: BP Exploration
Project Administrator: Jacobs
Project Title: Oman International Container terminal C - Phase II Civil Works & Side Gate Works
The project includes the 16 reefer gantries, 2 Sub stations with 11 kV switch gears, 3 Security buildings, 3 OCR Portals, 12 km Runway beam & 600 Container beams along with the associate earth works & road works.
Client: Oman International Container Terminal Project Manager: Tebodin Consultant & Engineers
Project Title: Musandam Gas Plant Project
A major sub-contract from EPC Contractor Hyundai Engineering Company, the project included the following major works
1. Construction of all temporary facilities
2. Marine works
3. Earthworks including 1.7 Million m3 of blasting and earthmoving
4. Civil Works including roads, pipelines and other Concrete works (55, 000 m3)
5. Building - Sub-station, Administration & permanent staff accommodation
Client: Oman Oil Company Exploration & Production LLC EPC
Contractor: Hyundai Engineering Company
Project Title: Construction of Paved Road in Wilayat Mad’ha
The project consists of construction of 11 km of asphalt roads, including drainage structures, relocation of utilities and link / access roads in the mountainous terrain that includes following major works
1. Blasting & earthmoving - 4.5 Million m3
2. Asphalt pavement with road marking & signs - 11 km
3. Concrete works including Culverts & retaining walls - 20, 000 m3
4. Street lighting, guard rails, Ditches & slope protection works
Client: Ministry of Transport & Communications - MOTC
Engineer: NESPAK Engineering
Project Title: Nimr Water Treatment Plan
The works involve the production of 1, 000, 000 m3 of clay over a period of15months. In addition to cutting and leveling of an area of some 6 million m2.
Client: Petroleum Development Oman
Main Contractor: Bauer Nimr
Project Title: Waterways specialist works & seawater intake
The works involve the construction of sea water intake basin, Pump house and a compressor room. (The excavation for this construction is bellow water level and dewatering system is in place throughout the construction phase.) And the following major works involves in the project.
1. Five nos. of submersible pumps with complete accessories
2. Four nos. of suction screens to be installed in the sea including manifold.
3. Supply and installation of 1400mm dia HDPE seawater intake pipeline with all required accessories
Client: The wave Muscat
Engineer: Atkins International
Project Title: Al Shattie Beach Security Barriers - Salalah
The works consist of Construction of Beach security barrier, Ramps, Guardrail, Electrical panel room and its associated electrical works.
Client: The Royal court of Affairs - RCA Engineer: Consulting Engineering Services LLC.
Project Title: Saud Bahwan Plaza - SBP
In partner with WJ Towel Construction & Co., The Saud Bahwan plaza is a gated community development comprising 576 2 & 3 bedroom super luxury residential apartments (6 Blocks) 2 commercial blocks.
Client: Saud Bahwan Group
Engineer: Design Uint - Kadri Consultant
Project Title: Agugambay Bridge and Access Road Project
The Arugam Bay Bridge - Linking nearly 45, 000 residents of Pottuvil, Panama, Arugam bay & Ulla in Eastern Sri Lanka. It is a pivotal lifeline to the reconstruction of Tsunami - Torn in Sri Lanka.
Client: USAID Owner: RDA, Sri Lanka Engineer: CH2MHILL International Services Inc.
Supervised the construction of The Phone company new building project in Bampalapitiya, Sri Lanka from the Super Structure to finishing works along with the project engineers. In addition to the supervision responsible to identify and quantify the material requirement, raise material request to the procurement department and maintain the Sub-contractors works measurement sheet and approve the quantities for their interim payment.
Successfully completed a three month training programme under the Alternative Livelihoods Recovery through Training - ALRT project in Construction methods for Roads and Reinforced concrete and Masonry structures as a Technical Officer.