Assistant Engineer
Edu Tronics Engineering lab
Total years of experience :5 years, 0 Months
1) Provide technical assistance and resolution when electrical or engineering problems are encountered
before, during, and after construction.
2) Assemble electrical and electronic systems and prototypes according to engineering data and
knowledge of electrical principles, using hand tools and measuring instruments.
3) Install and maintain electrical control systems and solid state equipment.
4) Modify electrical prototypes, parts, assemblies, and systems to correct functional deviations.
5) Set up and operate test equipment to evaluate performance of developmental parts, assemblies, or
systems under simulated operating conditions, and record results.
6) Collaborate with electrical engineers and other personnel to identify, define, and solve developmental
problems.
7) Build, calibrate, maintain, troubleshoot and repair electrical instruments or testing equipment.
8) Analyze and interpret test information to resolve design-related problems.
9) Write commissioning procedures for electrical installations.
10) Prepare project cost and work-time estimates.
11) Evaluate engineering proposals, shop drawings and design comments for sound electrical
engineering practice and conformance with established safety and design criteria, and recommend
approval or disapproval.
12) Draw or modify diagrams and write engineering specifications to clarify design details and functional
criteria of experimental electronics units.
13) Conduct inspections for quality control and assurance programs, reporting findings and
recommendations.
14) Prepare contracts and initiate, review and coordinate modifications to contract specifications and
plans throughout the construction process.
15) Plan, schedule and monitor work of support personnel to assist supervisor.
16) Review existing electrical engineering criteria to identify necessary revisions, deletions or
amendments to outdated material.
17) Perform supervisory duties such as recommending work assignments, approving leaves and
completing performance evaluations.
18) Plan method and sequence of operations for developing and testing experimental electronic and
electrical equipment.
19) Visit construction sites to observe conditions impacting design and to identify solutions to technical
design problems involving electrical systems equipment that arise during construction.
In this time i'm work as lab assistant and my work is maintenance all practical equipments. And guides to students during exzam time how use
In this i repairs all home appliances like (fans, washing machine, air Coular, domestic wiring ect.)
And services all home appliances.
And winding of single phase AC motors (sailing fan, pedestal fan, 2 hp motor )