Muhamad Najib Bin Lasa Lasa, Lead Construction Instrument Engineer

Muhamad Najib Bin Lasa Lasa

Lead Construction Instrument Engineer

MIE Industrial (CCSM)-P1 PETRONAS RAPID Project

البلد
ماليزيا
التعليم
بكالوريوس, Industrial Instrumentation
الخبرات
17 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 5 أشهر

Lead Construction Instrument Engineer في MIE Industrial (CCSM)-P1 PETRONAS RAPID Project
  • ماليزيا
  • أشغل هذه الوظيفة منذ يوليو 2016
E & I Field Engineer/ Superintendent في Bechtel Malaysia Inc. (Malaysia Branch)-Wheatstone LNG Project
  • ماليزيا
  • مايو 2015 إلى ديسمبر 2015
Construction E&I Engineer في (THHE) Tabung Haji Heavy Engineering-Lundin Bertam Project
  • ماليزيا
  • يناير 2013 إلى أبريل 2015
Construction E&I Engineer/ Superintendent في (MMHE) Malaysia Marine Heavy Engineering-Exxon Mobile-Tapis-R Project
  • ماليزيا
  • فبراير 2012 إلى ديسمبر 2012
Construction E&I Engineer/ Superintendent في (MMHE) Malaysia Marine Heavy Engineering-PETRONAS TBCP-A Topside
  • ماليزيا
  • فبراير 2009 إلى ديسمبر 2011
Construction E&I Engineer/ Superintendent في (MMHE) Malaysia Marine Heavy Engineering-PETRONAS PC-4 Gas Development Project/ B-11DR-A Host Tie-In
  • ماليزيا
  • أكتوبر 2007 إلى فبراير 2009
Construction E&I Engineer/Supervisor في (MMHE) Malaysia Marine Heavy Engineering-Sarawak Shell Berhad (SSB) SCDR- A Topside
  • ماليزيا
  • أكتوبر 2006 إلى أكتوبر 2007
Project في (MMHE) Malaysia Marine Heavy Engineering-TECHNIP GEOPRODUCTION (M) SDN BHD Kikeh Spar Project
  • ماليزيا
  • يونيو 2006 إلى سبتمبر 2006

DUTIES, RESPONSIBILITIES & SKILL

1) Management
- Prepare Technical Bid Evaluation (TBE) contract document between client-main contractors, main contractor-sub contractors.
- Arranging Kick-Off Meeting, Vendor progress meeting, Sub-Contractor Progress Meeting and etc
- Prepare, review, comment document sub contractor scope of work and scope of supply.
- Prepare, review, report on planning package and schedule of work.
- Prepare electrical and instrument installation and testing procedure.
- Involve on Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
- Prepare, review, comment E&I workpack, pre-commissioning procedure on-shore/offshore.
- Review and/or approval of EPCC contractors’ key related engineering drawings and vendor data per the engineering document and data requirements set forth in the EPCC contracts and the document review and approval matrix
- Review and related technical approval of requested deviations (in consultation with Engineering Manager)
- Review and approval of related critical requisitions and technical bid tabulations in accordance with the terms of the EPCC contracts
- Participate in engineering review meetings
- Participate in constructability, operability and maintainability review
- Licensor coordination for compliance check and deviation approval
- Liaise with other disciplines to ensure inter-discipline checks are being performed
- Supervise the documentation hand-over and participate with OWNER in the final Hand-over of the Units/Package

2) Engineering
- Strong in instrumentation system, fire and gas system, telecom system and process system in oil and gas modules.
- Capable to review, comment on instrumentation shop drawings, fire and gas drawing, telecom drawings, piping and instrumentation drawing (P&ID), Piping Isometric drawings.
- Capable to review and understand structure, architecture, mechanical drawings, HVAC drawings.
- Capable to clarify on early stage modification that need to be plan, additional materials need to be purchase.
- Capable to prepare, review and comment TBE vendor, supplier supply items compared to project specification.
- Fimiliar with codes & standards PTS (Petronas), MPDS (Exxon)

3) Site Management
- Strong in site supervisory work. (on-shore, off-shore & Refinery)
- Capable handing manpower/manhour with all trade of skill.
- Capable plan manpower/manhour comparing with progress required.
- Well aware all site requirement, site facility, safety procedure that require.
- Well aware steps and installation procedure.
- Able to decide urgent solution due modification on drawing, clashes on site.
- Involve on Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
- Involve in Material management on warehouse in and out/ inspection and etc.

4) Quality
- Capable to inspect fabrication work, reject/pass/need to be repair.
- Familiar with QC documentation work such as QAN, ITR, MDR, NCR and etc.
- Fimiliar with codes & standards PTS (Petronas), MPDS (Exxon)

5) Hand skill
- Meggering cables, tube bending, cable glanding, cable termination, calibration of instrument devices, valves.
- Organize and do a pre-commissioning procedure and activities.

الخلفية التعليمية

بكالوريوس, Industrial Instrumentation
  • في Universiti Teknikal Malaysia Melaka
  • يونيو 2006

Specialties & Skills

CABLEADO
CONSULTING
CONTRACT MANAGEMENT
CUSTOMER RELATIONS
DOCUMENTATION
ELECTRONICS
ENGINEERING
CLARIFY
CALIBRATION

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Level 3 SKM: Control Valve calibration/ maintenance. Level 3 SKM: Instrument Safety Procedure (FGS). (الشهادة)
تاريخ الدورة:
January 2013