Muhamad Najib Lasa, Lead Construction Instrument Engineer

Muhamad Najib Lasa

Lead Construction Instrument Engineer

MIE Industrial (CCSM)-P1 PETRONAS RAPID Project

Lieu
Malaisie
Éducation
Baccalauréat, Industrial Instrumentation
Expérience
17 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 5 Mois

Lead Construction Instrument Engineer à MIE Industrial (CCSM)-P1 PETRONAS RAPID Project
  • Malaisie
  • Je travaille ici depuis juillet 2016
E & I Field Engineer/ Superintendent à Bechtel Malaysia Inc. (Malaysia Branch)-Wheatstone LNG Project
  • Malaisie
  • mai 2015 à décembre 2015
Construction E&I Engineer à (THHE) Tabung Haji Heavy Engineering-Lundin Bertam Project
  • Malaisie
  • janvier 2013 à avril 2015
Construction E&I Engineer/ Superintendent à (MMHE) Malaysia Marine Heavy Engineering-Exxon Mobile-Tapis-R Project
  • Malaisie
  • février 2012 à décembre 2012
Construction E&I Engineer/ Superintendent à (MMHE) Malaysia Marine Heavy Engineering-PETRONAS TBCP-A Topside
  • Malaisie
  • février 2009 à décembre 2011
Construction E&I Engineer/ Superintendent à (MMHE) Malaysia Marine Heavy Engineering-PETRONAS PC-4 Gas Development Project/ B-11DR-A Host Tie-In
  • Malaisie
  • octobre 2007 à février 2009
Construction E&I Engineer/Supervisor à (MMHE) Malaysia Marine Heavy Engineering-Sarawak Shell Berhad (SSB) SCDR- A Topside
  • Malaisie
  • octobre 2006 à octobre 2007
Project à (MMHE) Malaysia Marine Heavy Engineering-TECHNIP GEOPRODUCTION (M) SDN BHD Kikeh Spar Project
  • Malaisie
  • juin 2006 à septembre 2006

DUTIES, RESPONSIBILITIES & SKILL

1) Management
- Prepare Technical Bid Evaluation (TBE) contract document between client-main contractors, main contractor-sub contractors.
- Arranging Kick-Off Meeting, Vendor progress meeting, Sub-Contractor Progress Meeting and etc
- Prepare, review, comment document sub contractor scope of work and scope of supply.
- Prepare, review, report on planning package and schedule of work.
- Prepare electrical and instrument installation and testing procedure.
- Involve on Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
- Prepare, review, comment E&I workpack, pre-commissioning procedure on-shore/offshore.
- Review and/or approval of EPCC contractors’ key related engineering drawings and vendor data per the engineering document and data requirements set forth in the EPCC contracts and the document review and approval matrix
- Review and related technical approval of requested deviations (in consultation with Engineering Manager)
- Review and approval of related critical requisitions and technical bid tabulations in accordance with the terms of the EPCC contracts
- Participate in engineering review meetings
- Participate in constructability, operability and maintainability review
- Licensor coordination for compliance check and deviation approval
- Liaise with other disciplines to ensure inter-discipline checks are being performed
- Supervise the documentation hand-over and participate with OWNER in the final Hand-over of the Units/Package

2) Engineering
- Strong in instrumentation system, fire and gas system, telecom system and process system in oil and gas modules.
- Capable to review, comment on instrumentation shop drawings, fire and gas drawing, telecom drawings, piping and instrumentation drawing (P&ID), Piping Isometric drawings.
- Capable to review and understand structure, architecture, mechanical drawings, HVAC drawings.
- Capable to clarify on early stage modification that need to be plan, additional materials need to be purchase.
- Capable to prepare, review and comment TBE vendor, supplier supply items compared to project specification.
- Fimiliar with codes & standards PTS (Petronas), MPDS (Exxon)

3) Site Management
- Strong in site supervisory work. (on-shore, off-shore & Refinery)
- Capable handing manpower/manhour with all trade of skill.
- Capable plan manpower/manhour comparing with progress required.
- Well aware all site requirement, site facility, safety procedure that require.
- Well aware steps and installation procedure.
- Able to decide urgent solution due modification on drawing, clashes on site.
- Involve on Factory Acceptance Test (FAT) and Site Acceptance Test (SAT)
- Involve in Material management on warehouse in and out/ inspection and etc.

4) Quality
- Capable to inspect fabrication work, reject/pass/need to be repair.
- Familiar with QC documentation work such as QAN, ITR, MDR, NCR and etc.
- Fimiliar with codes & standards PTS (Petronas), MPDS (Exxon)

5) Hand skill
- Meggering cables, tube bending, cable glanding, cable termination, calibration of instrument devices, valves.
- Organize and do a pre-commissioning procedure and activities.

Éducation

Baccalauréat, Industrial Instrumentation
  • à Universiti Teknikal Malaysia Melaka
  • juin 2006

Specialties & Skills

CABLEADO
CONSULTING
CONTRACT MANAGEMENT
CUSTOMER RELATIONS
DOCUMENTATION
ELECTRONICS
ENGINEERING
CLARIFY
CALIBRATION

Langues

Anglais
Expert

Formation et Diplômes

Level 3 SKM: Control Valve calibration/ maintenance. Level 3 SKM: Instrument Safety Procedure (FGS). (Certificat)
Date de la formation:
January 2013