Muhamamd Muhammad Nadeem khan, QA/QC COORDINATOR

Muhamamd Muhammad Nadeem khan

QA/QC COORDINATOR

SAIPEM S.p.A

Location
Pakistan
Education
Master's degree, Civil Engineering
Experience
25 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :25 years, 0 Months

QA/QC COORDINATOR at SAIPEM S.p.A
  • United Arab Emirates - Abu Dhabi
  • My current job since October 2021

Interfacing and monitoring direct hire supervision and/or major subcontractor supervision and field engineering.
Ensures project requirements and expectations are met with regards to craft and supervisory performance, direct hire
craft productivity and performance and/or reporting on Subcontractors performance. Ensures adherence by all
discipline craft, Subcontractor’s to safety, quality, schedule and performance expectations as defined by Black and
Veatch. Provides craft supervisors with information and technical direction required to complete project safely, timely
and in a quality manner. Ensures schedule and project expectations are clearly defined to craft supervisors and
Subcontractors. Ensures schedule requirements are communicated to all levels of craft discipline and/or Supervision.
Coordinate interpretation of technical requirements. Provides technical data and informations as required to direct
hire workforce subcontractor supervision or Construction Engineers. Ensures compliance by workforce or
subcontractor to all standards, procedures and contractual commitments within the bounds of all applicable policies.
For Union Projects - Responsible for ensuring that the daily project execution is in line with the Black & Veatch
National Maintenance and Project Labor Union Agreements. Responsible for understanding all Local Union agreements
for the project. Responsible for establishing a working relationship with the Local Union BA and the Local Union Site
Job Steward. Responsible for ensuring the uninterrupted workflow at union interface points. Has ability and expertise
to stand in for the construction manager during absence from site if requested. Has ability to comprehend overall
project schedule with regards to requirements of other disciplines or subcontractors requirements. May have
responsibility for safety and quality requirements on site if required. Has ability and responsibility to mentor and train
other discipline superintendents. Capable of recommending training and development needs for the trainees.

QA/QC COORDINATOR at SAIPEM S.p.A
  • Mozambique - Pemba
  • December 2019 to September 2021

Setting up the project quality management system for the company by preparing a detailed project quality plan
to achieve client satisfaction. Monitor, review and amend the quality plan at regular intervals to drive continuous
improvement. Ensuring quality management system is understood and implemented within the company through
quality inductions, workshops and trainings. Monitor the company’s quality performance with respect to the
approved project quality plan
 Regularly monitor, review and improve on the company’s quality management system by monitoring the
established internal KPIs (key performance indicators). Presenting the KPI statistics in the monthly meetings to
drive the required improvements by establishing the root cause for lagging KPIs. Generating internal quality
reports to the management at regular intervals providing them the project quality performance
 Raise internal NCRs (non-conformance reports) and CARs (corrective action reports). Performing “Root Cause
Analysis” for the non-conformance reports generated for evaluation and implementing corrective/preventive
measures for process and systems
 Attend to and ensure timely close outs of audits NCRs raised by client. Ensure that the corrective actions are
implemented within the system for improvement
 Prepare and execute audits within the company as per audit schedule established in the project quality plan.
Distribute the audit findings and ensure timely close out of the non-conformances and observations. Carry out
follow up audits to verify the effectiveness of the corrective actions taken.
 Regular reporting to the client on critical quality issues and quality performance of the contractor and the
company using established KPIs (key performance indicators). Raise quality alerts in the reports for any potential
quality concerns. Monitoring the project’s KPIs through Statistical Process Control for continual improvement and
revising the same in line with the company’s quality objectives
 Coordinating with different internal disciplines like MEP, technical, architectural including the contractor for the
quality related issues.
 Act as a line of communication between the client and the contractor. Attend client meetings and chair meetings
with the contractor to regularly discuss and solve quality issues pertaining to the project.
 Take proactive measure to issue quality alerts foreseeing potential quality concerns and thus mitigate project
risks.
 Impart internal quality training as per the established training schedule to raise quality awareness in order to
drive the continuous improvement of the QMS and effectiveness of interrelated processes.
 Monitoring and reviewing the project close out process as per the approved procedures to ensure systematic
hand over of the project
 Prepare and disseminate quality learning points from the project, which is crucial link in the process of continuous
improvement of the company.

QA/QC COORDINATOR at BUREAU VERITAS (SNC LAVALIN INTERNATIONAL)
  • Oman - Salalah
  • September 2018 to December 2019

Review and approve the quality submittals of the contractor including the contract quality plan, method
statements, inspection and test plans and test reports. Give quality inputs for material and mock up approvals.
Ensure that project delivery by the contractor is achieved in compliance with the client’s quality requirements and
standards. As a client representative monitor, review and analyze the quality performance of the contractor by
monitoring the contractor’s key performance indicators (KPI). Monitoring the project KPIs through “Statistical
Process Control” for continual improvement and revising the same in line with the client’s quality objectives
Monitoring the inspection and test plan of the contractor to ensure the witness and hold points are correctly
defined. Make regular site audits and walk around to verify the compliance of executed works by the contractor
to the set quality standards and benchmarks
 Ensuring that the contractor is raising the material approvals and material inspections as per the approved
inspection and test plan. Monitoring the testing and reviewing the test results along with the technical team for
compliance
Prepare and execute audits on the contractor and the supply chain as per audit schedule established in the
project quality plan. Perform compliance and TPS (technical/process/system) audits on the contractor and their
respective supply chain to drive continuous improvement. Monitor and review the effectiveness of the audits
performed by the contractor. Drive continuous improvement of the systems by conducting regular trainings to
execute preventive actions. Issuing non-conformance reports to the contractor and follow on the timely close
outs.
Conduct quality workshops for the contractor’s site teams to increase awareness and drive the concept of “Right
First Time”. Imparting training to subcontractors on various works to ensure that the work adheres to the Method
Statements and ITPs

Civil /Building QC Engineer at SAIPEM CONTRACTING NIGERIA Ltd.
  • Nigeria
  • May 2015 to August 2018

 Inspection of fill material and ongoing earth works.
 Cast-In-Place Concrete and precast concrete Formwork, rebar and anchor bolts Inspection.
 Inspection of precast piles, prestressed pretension piling, bored piling, CFA piling.
 Fresh Concrete Sampling & Testing and inspection of Batch Plants.
 Inspection/ Testing of all materials for projects as per Designed General specification, ACI, ASTM, BS.
 Implement the quality control plan (QCP) as required for the project jobsite.
 Building works and civil foundation on going daily inspection handling.
 Protective Coating and Final Inspection of concrete, Concrete Moisture Field Test (For Coating Purposes).
 Concrete Coatings and Repair Materials Receiving, Storage & Preservation Inspection.
 Inspection of Steel Structure (Pipe Racks) and foundation works.
 Inspection of platform and access way on ground and top levels.
 Inspection of grouting activities i.e. Cement based grout, Cement based Non-shrink grout and epoxy Non-shrink grout.
 Inspection of building works i.e., masonry wall, gypsum board, plastering, ceramic, vinyl, resilient tile flooring before and after installation.
 Inspection building material for finishing.
 Inspection of building finishing works i.e., floor tiles, painting, false ceiling, cladding of walls, pitched roof, after installation of plumb, rating and finishing of panels, installed door and windows, glazing
 Inspection of HVAC ductwork, supports and air terminal, insulation and accessories and HVAC equipment.
 Inspection prior to commissioning, TAB (testing, adjusting & balancing) commissioning.
 Inspection of drainage works i.e., manholes, catch basins, sewer pits, drain channels, sump pits etc...
 Inspection of road works i.e., sub-grade, sub-base, base, primer application, asphalt wearing course and monitoring of laboratory testing of all levels.
 Grating inspection to ensure, all grating edges near cut out have stiffening ring around.
 To ensure no missing components in conformance with as-built drawings & site modifications.
 To ensure Structural Grating orientation as per drawings.
 Inspection/ Supervision of all construction activities at site like Equipment Octagonal foundations, compressor foundations, Pipe Sleepers, Miscellaneous foundations of Pipe Racks and cooling fan, Instrument and Equipment shelter, Operation & maintenance shelter, Integrin shed, Sub-station Building, sulphur pit, Interceptor Flush sump, Pump foundation, Exchanger foundations, closed drain drum sump, oil sumps, Elevated/ Table top Structures, Flare foundation, Vessel foundation, sulphur Pit Manholes, Catch Basins, Valve Boxes, Grouting, , Drains, Ditches, Paving, Underground works Earth Work like Excavation & backfilling, Ridged & flexible Paving, Survey Works & Leveling.
 Prepare Non-Conformance report whenever required.
 Approval of Mix-Design and review of method statements of construction contractor.
 To ensure the QHSE always keep close eye on work.
 Attending the meeting with Client and Sub-Con.
 Sub-Con quality personals CV reviewed & interviews.

Civil / Structural QC Engineer at APPLUS VELOSI (RAS GAS)
  • Qatar - Doha
  • April 2014 to January 2015

 Schedule, implements, controls being undertaken by the site engineers, skilled workers and labours.
 Advance planning on every activity for equipment material and manpower required for each activity.
 Projects execution, prepare material take-off, Prepare construction schedule and reports.
 Do pre-estimate and post estimate from time to time as instructed by my boss.
 Review and approval of the method statements of Sub-Con.
 Spot non-conformances as per project requirements and persuade responsible Sub-Con. For the remedy.
 To ensure all work is xecuted as per agreed specifications, procedures, method statement and other specific project requirements
 Evaluation of variations, design changes and concession requests.
 Supervise daily manpower operation from mobilization to actual operation based on plans and specification.
 Inspect and double that the works was being done based on plans and details.
 Give instruction regarding workers activities to be done.
 To check the quality of bricks, aggregates, cement and reinforcement.
 Checking the reinforcement and finishing works of the building.
 Responsible for site reinforcement checking.
 Placing of concrete using different concrete machinery like concrete pump, placer, etc. and manually fixing the concrete top at the desired level using levelling instrument, curing up-to the prescribed period, etc.
 Responsible for levelling the sites and marking the plinth beam, floor beam, lintel and openings.
 Complete supervision of all construction works.
 Supervision of Earthwork using heavy earth moving equipment’s like excavator, dozer, grader, roller, etc., for foundations of different structures, canal sub grade, etc.
 Checking of reinforcing bars, formworks and supervision of concrete placement.
 Checking of concrete workability and slump test during concreting.
 Responsible to all civil works activities and grouting works.
 Inspection of form works, rebar, coating etc., prior to pouring of concrete.
 Inspect Steel Structure (Pipe Rack)and foundation
 Inspection of platform and access way on ground.
 Perform visual inspection in accordance with company Standards
 Inspection of precast prestressed pretensioned piling and bore piling.
 Inspect foundation and bolt elevation prior to erection.
 Inspection of equipment structure and others structures.
 Conduct bolt tightening calibration and testing.
 Inspection stacks support structure.
 Good experience of roads and highways.
 Good experience of grouting activities Cement based grout, Non-shrink grout and epoxy Non-shrink grout for the foundations, heavy equipment foundations, vessels, turbine and heavy compressor.
 Check drawing and specification of structure.
 Monitor civil and structural works according to standards specs.
 Check horizontal and vertical elevation of vessel foundation.
 Conduct bolt template inspection prior to vessel installation.
 Participate in alignment meeting with regards to improvement in quality control
 Review quality plan and inspection test plan.
 Documents own inspection activities for reference purposes.

Civil QC Supervisor at SAIPEM SPA
  • United Arab Emirates - Abu Dhabi
  • April 2011 to March 2014

Inspection - Bolts, Nuts & Washers for Structural Connections.
Inspection of Fabricated Steel and Aluminium Structure Concrete Sampling, Testing & Placement Inspection.
Cement Based Non-Shrink Grout Compressive Strength Test Reports.
Foundation and Grout Curing / Protection and Final Inspection.
Leak Proof Testing / Final Inspection.
Roof Flood Testing.
Waterproofing Roofs - Receiving and Storage Inspection.
Precast Concrete Erection and Alignment.
Procedure for Tightening of High Strength ASTM A325 and A490 Bolts.
Inspection of Structural Steel Shapes & Plates.
Inspection of Support Foundation Prior to Structural Installation.
Inspection of grouting activities i.e. Cement based grout, Non-shrink grout and epoxy Non-shrink grout
Inspection of Fabricated Steel and Aluminium Structure.
Glass & Glazing - Installation & Final Inspection.
Metal Doors and Windows - Final Inspection.
Inspection of HVAC works installation and testing
Good experience in roads and highways.
Ceramic Wall and Floor Tiles and Accessories - Receiving and Storage Inspection.
Gypsum Wall Board System - Receiving & Storage Inspection.
Inspection - Bolts, Nuts & Washers for Structural Connections.
Acoustical False Ceilings - Installation & Final Inspection.
Inspection and handling of batching plant & civil Laboratories.
Inspection of precast prestressed pretension piling and bore piling.

QC CIVIL INSPECTOR (SAP#70010714) at Saipem Spa
  • Saudi Arabia
  • January 2010 to March 2011

Review and approve the quality submittals of the contractor including the contract quality plan, method statements, inspection and test plans and test reports. Give quality inputs for material and mock up approvals.
Ensure that project delivery by the contractor is achieved in compliance with the client’s quality requirements and standards. As a client representative monitor, review and analyze the quality performance of the contractor by monitoring the contractor’s key performance indicators (KPI). Monitoring the project KPIs through “Statistical Process Control” for continual improvement and revising the same in line with the client’s quality objectives
Monitoring the inspection and test plan of the contractor to ensure the witness and hold points are correctly defined. Make regular site audits and walk around to verify the compliance of executed works by the contractor to the set quality standards and benchmarks
Ensuring that the contractor is raising the material approvals and material inspections as per the approved inspection and test plan. Monitoring the testing and reviewing the test results along with the technical team for compliance
Prepare and execute audits on the contractor and the supply chain as per audit schedule established in the project quality plan. Perform compliance and TPS (technical/process/system) audits on the contractor and their respective supply chain to drive continuous improvement. Monitor and review the effectiveness of the audits performed by the contractor. Drive continuous improvement of the systems by conducting regular trainings to execute preventive actions. Issuing non-conformance reports to the contractor and follow on the timely close outs.
Conduct quality workshops for the contractor’s site teams to increase awareness and drive the concept of “Right First Time”. Imparting training to subcontractors on various works to ensure that the work adheres to the Method Statements and ITPs

QC CIVIL INSPECTOR (SAP#70010714) at Snamprogetti SpA
  • Saudi Arabia - Khobar
  • August 2008 to December 2009

Setting up the project quality management system for the company by preparing a detailed project quality plan to achieve client satisfaction. Monitor, review and amend the quality plan at regular intervals to drive continuous improvement. Ensuring quality management system is understood and implemented within the company through quality inductions, workshops and training. Monitor the company’s quality performance with respect to the approved project quality plan
Regularly monitor, review and improve on the company’s quality management system by monitoring the established internal KPIs (key performance indicators). Presenting the KPI statistics in the monthly meetings to drive the required improvements by establishing the root cause for lagging KPIs. Generating internal quality reports to the management at regular intervals providing them the project quality performance
Raise internal NCRs (non-conformance reports) and CARs (corrective action reports). Performing “Root Cause Analysis” for the non-conformance reports generated for evaluation and implementing corrective/preventive measures for process and systems
Attend to and ensure timely close outs of audits NCRs raised by client. Ensure that the corrective actions are implemented within the system for improvement
Prepare and execute audits within the company as per audit schedule established in the project quality plan. Distribute the audit findings and ensure timely close out of the non-conformances and observations. Carry out follow up audits to verify the effectiveness of the corrective actions taken.
Regular reporting to the client on critical quality issues and quality performance of the contractor and the company using established KPIs (key performance indicators). Raise quality alerts in the reports for any potential quality concerns. Monitoring the project’s KPIs through Statistical Process Control for continual improvement and revising the same in line with the company’s quality objectives
Coordinating with different internal disciplines like MEP, technical, architectural including the contractor for the quality related issues.
Act as a line of communication between the client and the contractor. Attend client meetings and chair meetings with the contractor to regularly discuss and solve quality issues pertaining to the project.
Take proactive measure to issue quality alerts foreseeing potential quality concerns and thus mitigate project risks.
Impart internal quality training as per the established training schedule to raise quality awareness in order to drive the continuous improvement of the QMS and effectiveness of interrelated processes.
Monitoring and reviewing the project close out process as per the approved procedures to ensure systematic hand over of the project
Prepare and disseminate quality learning points from the project, which is crucial link in the process of continuous improvement of the company.

Construction Manager, I/C- QA/QC (QC MANAGER) at Descon Engineering Qatar L.L.C
  • Qatar - Doha
  • September 2006 to June 2008

Setting up the project quality management system for the company by preparing a detailed project quality plan to achieve client satisfaction. Monitor, review and amend the quality plan at regular intervals to drive continuous improvement. Ensuring quality management system is understood and implemented within the company through quality inductions, workshops and training. Monitor the company’s quality performance with respect to the approved project quality plan
Regularly monitor, review and improve on the company’s quality management system by monitoring the established internal KPIs (key performance indicators). Presenting the KPI statistics in the monthly meetings to drive the required improvements by establishing the root cause for lagging KPIs. Generating internal quality reports to the management at regular intervals providing them the project quality performance
Raise internal NCRs (non-conformance reports) and CARs (corrective action reports). Performing “Root Cause Analysis” for the non-conformance reports generated for evaluation and implementing corrective/preventive measures for process and systems
Attend to and ensure timely close outs of audits NCRs raised by client. Ensure that the corrective actions are implemented within the system for improvement
Prepare and execute audits within the company as per audit schedule established in the project quality plan. Distribute the audit findings and ensure timely close out of the non-conformances and observations. Carry out follow up audits to verify the effectiveness of the corrective actions taken.
Regular reporting to the client on critical quality issues and quality performance of the contractor and the company using established KPIs (key performance indicators). Raise quality alerts in the reports for any potential quality concerns. Monitoring the project’s KPIs through Statistical Process Control for continual improvement and revising the same in line with the company’s quality objectives
Coordinating with different internal disciplines like MEP, technical, architectural including the contractor for the quality related issues.
Act as a line of communication between the client and the contractor. Attend client meetings and chair meetings with the contractor to regularly discuss and solve quality issues pertaining to the project.
Take proactive measure to issue quality alerts foreseeing potential quality concerns and thus mitigate project risks.
Impart internal quality training as per the established training schedule to raise quality awareness in order to drive the continuous improvement of the QMS and effectiveness of interrelated processes.
Monitoring and reviewing the project close out process as per the approved procedures to ensure systematic hand over of the project
Prepare and disseminate quality learning points from the project, which is crucial link in the process of continuous improvement of the company.

QC Civil Inspector at Best Way Cemen
  • Pakistan - Rawalpindi
  • March 2005 to September 2006

Carried out day to day inspections and having meeting with the sub-contractors

QA/QC Civil Engineer/Construction Manager Civil at M/S Izhar (Pvt) Ltd
  • Pakistan - Lahore
  • January 2000 to February 2005

Schedule, implements, controls being undertaken by the site engineers, skilled workers and labors.
Advance planning on every activity for equipment material and manpower required for each activity.
Projects execution, prepare material take-off, Prepare construction schedule and reports.
Do per-estimate and post estimate from time to time as instructed by my boss.
Review and approval of the method statements of Sub-Con.
Spot non-conformance as per project requirements and persuade responsible Sub-Con. For the remedy.

Civil Supervisor at M/S Home Ways Construction Co
  • Pakistan - Lahore
  • January 1999 to January 2000

To ensure all work is xecuted as per agreed specifications, procedures, method statement and other specific project requirements
Evaluation of variations, design changes and concession requests.
Supervise daily manpower operation from mobilization to actual operation based on plans and specification.
Inspect and double that the works was being done based on plans and details.
Give instruction regarding workers activities to be done.
To check the quality of bricks, aggregates, cement and reinforcement.
Checking the reinforcement and finishing works of the building.
Responsible for site reinforcement checking.
Placing of concrete using different concrete machinery like concrete pump, placer, etc. and manually fixing the concrete top at the desired level using levelling instrument, curing up-to the prescribed period, etc.
Responsible for levelling the sites and marking the plinth beam, floor beam, lintel and openings.
Complete supervision of all construction works.
Supervision of Earthwork using heavy earth moving equipment’s like excavator, dozer, grader, roller, etc., for foundations of different structures, canal sub grade, etc.

Education

Master's degree, Civil Engineering
  • at PIMSAT
  • February 2008

(Attested by UAE embassy & UAE foreign office) (Attested by MOFA Pakistan & HEC)

Bachelor's degree, CIVIL
  • at PIMSAT
  • February 2006

(Attested by UAE embassy & UAE foreign office) (Attested by MOFA Pakistan & HEC)

Diploma, CIVIL
  • at PUNJAB BOARD OF TECHNICAL EDUCATION LAHORE
  • December 2000

(Attested by MOFA Pakistan & IBCC)

High school or equivalent, SCIENCE
  • at GOV. HIGHT SCHOOL GRW.
  • September 1996

(Attested by MOFA Pakistan & IBCC)

Specialties & Skills

Construction & Property
Steel Structures
MICROSOFT WORKS
QC MANAGER
CIVIL SUPERINTENDENT
QC BATCHING PLANT
QC BUILDING ENGINEER
CONSTRUCTION MANAGER CIVIL
Sr, CIVIL ENGINEER
QC CIVIL/STRUCTURAL ENGINEER
QC COORDINATOR

Languages

English
Expert
Punjabi
Expert
Urdu
Expert

Hobbies

  • Exercise
    I like to do exercise on daily basis's.
  • cricket
    When ever i has some spare time i like to play Cricket.
  • Reading
    I like to read books .