Projects Manager Certified as Unlimited Structural Engineer from Dubai Municipality
L^KYOOB Consultancy
Total years of experience :13 years, 9 Months
Key Deliverables:
• Prepare the structural drawings in line with the analysis model of the project with engineering programs like ETABS, SAFE, and PROKON.
• Get the approval of the drawings and building Permits, by liaising and coordinating with the related authorities.
• Direct and oversee all assigned construction and development projects from conception to the finished structure including project planning, management, execution, completion and handing over as per cost, quality and deadline.
• Lead the project team to ensure all construction is being performed to quality standards and is in compliance with design specifications, drawings, budget and schedule.
• Keep clients and superiors apprised of the project status through the provision of detailed reports outlining workplace injuries, cost overruns and the causes of any construction delays.
• Review construction technical documentation for accuracy, feasibility and conformance to standards; generate daily/ monthly project progress, estimates and deliverables reports.
• Monitored and assessed works executed by contractors and processed contractor bill payments.
Key Deliverables:
• Prepared the structural drawings in line with the analysis model of the project with engineering programs like ETABS, SAFE, and PROKON.
• Reviewed shop drawings based on project requirements; studied and assessed drawings, plans, specifications and other documents relating to construction projects.
• Collaborated with Dubai Municipality, DEWA, Civil Defence, and RTA to get the approval of the drawings and building Permits.
• Prepared construction claims including cost estimation and Bill of Quantities (BoQ) review.
• Monitored project progress, compliance with design specifications, quality control and safety standards; maintained detailed documentation of all site engineering activities.
• Reviewed construction technical documentation for accuracy, feasibility and conformance to standards; generated external and internal reports on job status, daily project progress, estimates and deliverables.
Key Projects:
Project Location Description
Al-JADAF • Prolite Building (2B+G+8 Typical Floor)
• Al-Bassam Building (3B+G+12 Typical Floor)
Al-BARSHAA • MIZIN Building (G+4 Typical Floor)
• Mr.Mohamed Al-Balooshi Villa ( G+1 )
NAD EL-SHEBA • Mr. Mohamed Rashid Villa (G+1 +Out House)
• 3 Villas for AL-SAHOOL Family (G+1 + Service Block)
• Mr. Ahmed El-Shehi villa (G+1 + Service Block)
AL-KHAWANIG • Mr. Essa Karmastaji Villa (G+1)
• Mr. Saeed Karmastaji Villa (G+1)
• Mr. Mohamed Al-Mehiri Villa (G+1)
AL-AWIR • Mr. Awadh AL-Rasbi Villa (G+1)
AL-QUSAIS • Bin Salmeen Mosque (Mosque +Service Block)
AL-QUSAIS • Hasa bint EL-Mor Mosque (Mosque + Service Block)
• Mr. Shukri Albarik Villa (1B+G+1)
• Mr.Mohamed Al-Darmaki Villa ( 1B+G+1)
AL-WARQAA • Mr.Abdallah Almarzouki Building (2B+G+4Typical Floor)
• Mr.Tarik Karmastaji Villa (G+1+ServiceBlock)
• Mr.Fahd Karmastaji Villa (G+1+Service Block)
Key Deliverable:
• Inspected the progress work from the contractors and confirmed that the work has been completed as per the project requirements and specifications.
Key Achievements/ Projects:
• Manazel Compound in Fifth Settlement in Cairo, Egypt to supervise more than 20 Buildings (1B+G+3Typical + Roof + Upper Roof) with the consultant team.
• Coordinator Engineer with TSK Company to construct Three Electrical Power plants in Hurghada, Port Saeed, and Sharm EL-SHEIKH in Egypt.