Muhammad Arshad Muhammad Arshad, Instrument Technician

Muhammad Arshad Muhammad Arshad

Instrument Technician

Descon - Qatar

Location
Qatar - Al Khawr
Education
Diploma, Electronics
Experience
12 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :12 years, 4 Months

Instrument Technician at Descon - Qatar
  • Qatar - Al Khawr
  • My current job since October 2020

Here I m currently working as a Instrument Technician with Qatar Gas. My responsibilities here as a Instrument maintenance Technician. I am doing here PM and CM job

Instrument Engineer at Gain and control engineering
  • Pakistan - Nowshera Cantonment
  • September 2020 to October 2020

Here my responsibilities as a Instrument supervisor. I worked here commissioning and matinance. PT, TT, LT, FT, DPT, RTD, THERMOCOUPLE, AND CONTROL VALVES

Instrument Supervisor at Gain and control engineering
  • Pakistan - Chakwal
  • September 2019 to April 2020

Here my responsibilities as a Instrument supervisor. I worked here all instruments installation which include PT, LT, TT, FT, DPT, Gauges, all type, loop checking and calibration.

Instrument maintenance Technician at Descon - United Arab Emirates
  • United Arab Emirates - Abu Dhabi
  • April 2017 to January 2019

Here my responsibilities as Instrument maintenance Technician. I worked here different types of instrument as like PT, LT, TT, FT, DPT, Valves, RTD, THERMOCOUPLE,

Instrument Supervisor at ZRK THN LINE MARDAN
  • Pakistan
  • January 2016 to November 2016

Area supervised: Press, Saw, Chipper, Energy Plant, Sanding and RAW Board Handling (RBH). Cable termination cable laying and loop testing.
Job Summary: Worked as a supervisor all the areas. Cable laying, termination, loop testing, calibration of devices and commissioning

Instrument Supervisor at CHINIOT POWER PLANT
  • Pakistan
  • May 2015 to January 2016

• QA/QC
• Follow installation of instrumental device as according drawings
• Loop checking and calibration all instruments as specification required
• Glanding, Termination of all types of panels and JB instruments side.
• I worked on all Instruments PT, FT, LT, TT, PDT RTD, THERMOCOUPLE and control valve.
• Cable laying test as specification required
• Pre commissioning activity
• Check all junction box for end of instrument.
• Check all device F&G system as specification required
• Ability to read P&ID, Location drawings, Hook up drawings, Termination drawings.

Instrument maintenance Technician at ENGINEERING QATAR
  • Qatar - Doha
  • January 2015 to May 2015

• Follow installation of instrumental device as according drawings
• Loop checking and calibration all instruments as specification required
• Glanding, Termination of all types of panels and JB instruments side.
• I worked on all Instruments PT, FT, LT, TT, DPT, THERMOCOUPLE, and Control valve.
• Cable installation test as specification required
• I worked here PM and CM job
• Check all junction box for end of instrument.

 Instrument Technician at DESCON ENGINEERING U.A.E
  • United Arab Emirates - Abu Dhabi
  • January 2013 to September 2014

 At Shah Oil & Gas Development Project 1341, I worked with
• QA/QC
• Follow installation of instrumental device as according drawings
• Loop checking and calibration all instruments as specification required
• Glanding, Termination of all types of panels and JB instruments side.
• I worked on all Instruments PT, FT, LT, TT, PDT, RTD, THERMOCOUPLE and control valve.
• Check all junction box for end of instrument.

• Ability to read P&ID, Location drawings, Hook up drawings, Termination drawings.

Instrument maintenance Technician at Pak Arab Fertilizers
  • Pakistan - Multan
  • July 2009 to November 2011

• Follow installation of instrumental device as according drawings
• Loop checking and calibration all instruments as specification required
• Glanding, Termination of all types of panels and JB instruments side.
• I worked on all Instruments PT, FT, LT, TT, PDT, RTD, THERMOCOUPLE and control valve.
• performed PM and CM job

Education

Diploma, Electronics
  • at NCCS MULTAN
  • September 2009

• Three years Diploma of Associate Engineering in Electronics Technology from PBTE Lahore (2009) 1st Division

Specialties & Skills

Loop checking
PT FT LT TT PDT
Glanding Termination
Calibration
COMPUTER SKILLS & SHORT COURSES

Languages

English
Intermediate

Training and Certifications

Electronics Application (Training)
Training Institute:
G.T.T.I Multan
Date Attended:
September 2008
Duration:
2880 hours

Hobbies

  • CRICKET AND BOOKS
    BOOKS OF INSTRUMENTATIONS