Muhammad Asif, Maintenance Manager / مدير صيانة

Muhammad Asif

Maintenance Manager / مدير صيانة

Al Islami Foods

Location
United Arab Emirates
Education
Bachelor's degree, Mechanical Engineering
Experience
13 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 3 Months

Maintenance Manager / مدير صيانة at Al Islami Foods
  • United Arab Emirates - Sharjah
  • My current job since September 2016

Responsible for:

1. Maintenance & smooth running of all Production Machines/Equipment includes CFS Flaker, Simo Grinder, Simo Mixer, CFS Mixer, Vemag Filler, Formax, Pekmount & fessmann Smokehouses, Multivac Packing, Webomatic Packing, Martini Vertical Packing, Sausage Peeler, Kliklok forming & Packing, Carton Sealer, Stackers etc

2. Maintenance & New installation of Refrigeration Plant and Freon Chiller Units

3. Development & implementation of maintenance calendar, preventive maintenance checklists and breakdown reporting

4. New extension project work includes flooring, wall panel installation, new refrigeration plant installation, Piping, Electrical Cabling & Control Panel, Ammonia & Glycol Evaporator installation

5. Report & control expenses with in monthly budget

Project Planning & Coordination Engineer at ADEAREST
  • United Arab Emirates - Sharjah
  • July 2015 to September 2016

Responsibilities:
1) Create & track project plans for all projects along with site visits
2) Asset & Rental equipment resource monitoring & optimization with saving of approx. AED 15000 per month
3) Manpower resource optimization among different project sites
4) Schedule project meetings and update project plans

Junior Manager - Maintenance & Projects at Iffco
  • United Arab Emirates - Sharjah
  • November 2012 to May 2015

Responsibilities:

Refrigeration:
1) Looking after the operation & maintenance of Refrigeration Plant
2) Leaded & Monitored third party installation of New Ammonia Accumulator (600kW @ -430C) in our current Refrigeration Setup
3) Leaded & Monitored third party installation & commissioning of TWO New Grasso Compressor Packages at our Refrigeration Setup
i. High Stage Compressor Package: 1084.9 Ref KW
ii. Swing Compressor Package: 1032 Ref KW
4) Working on energy conservation & replacement of Evaporator Coils for Cold Stores
5) Responsible for Maintaining Line Efficiency >90% for Refrigeration Plant
6) Managing Floor Requirements for smooth production run
7) Working for the implementation of Oracle as an ERP in Engineering Department
8) Plan, Monitor & Control Budget of Operational & Capital Expenses

General Maintenance & Projects:
8) Executed Effluent Treatment Plant (ETP) of capacity 200 m3/day and looking after its running & maintenance.
9) Looking after General & Building Maintenance of the entire factory
10) Centralized New Engineering & Inventory Store for all factories.
11) Looking after departmental purchase & maintaining spare parts inventory

Safety Coordinator & Focal Point:
12) Presently getting IOSH Training & Certification
13) Serving as a factory safety coordinator and working for the betterment & safe factory environment

Meat & Marine Divisions:
14) Was Responsible for Maintaining Line Efficiency >85% for Meat & Marine Divisions
15) Managed Floor Requirements for smooth production run
16) Involved in the building renovation & layout modification of Meat Factory
17) Maintained Spare Parts Inventory for Meat & Marine Divisions.
18) Liabled for successful Municipality & Compliance audits

Commercial Dealings:
19) Supplier dealings and negotiations on different projects running factory wide
20) Looking after Annual Maintenance Contracts (AMCs) for different equipment like Air Compressors, Chemical Treatment for Condenser Water & ETP and Fire & Safety System

Project Engineer at Futehally Chemicals Pvt Limited (Unilever)
  • Pakistan - Karachi
  • January 2011 to November 2012

1) Worked on the expansion project of 400 Tons Detergent Process Plant including BOQ making, fabrication monitoring & building erection, equipment erection & installation, piping & its relevant procurement and bill verifications.
2) Leaded the Development & Construction Projects of New Prayer Area, Hot Air Generator Foundation and Generator Room & Electrical Sub Station.
3) Leaded the Standard & Hygienic Piping Execution along with BOQ & Tender making, Procurement and Test Run of Home & Personal Care Project.
4) Tracking of all Mechanical & Civil Projects running in the factory and maintaining tracker sheet of each project.
5) Tenders and BOQ making of different Mechanical & Civil Projects/Activities.
6) Verification of activities at site as per drawings and equipment placement.
7) Gravity flow water pipeline design calculation.
8) Cross calculation and verification of head losses for all ordered Pumps for the plant.
9) Developing summary of email correspondence & technical reports by Third Party Inspection Company for different projects.

Education

Bachelor's degree, Mechanical Engineering
  • at NED University
  • December 2010
High school or equivalent, Pre-Engineering
  • at Adamjee Govt. Science College
  • December 2006
High school or equivalent, Matriculation - Science
  • at Fatimiyah Boys School
  • December 2004

Specialties & Skills

Management
Plant Operations
Plant Maintenance
Project Management
Project Management
Operation & Maintenance
General Management (Finance & Budgets, Spare Parts Inventory and Employees)
MS OFFICE
MS PROJECT
Autocad 2D

Languages

English
Expert
Urdu
Expert
Arabic
Beginner
Gujarati
Intermediate