Muhammad Asif ميمن, Assistant Signal Engineer

Muhammad Asif ميمن

Assistant Signal Engineer

BPS

البلد
باكستان
التعليم
الثانوية العامة أو ما يعادلها,
الخبرات
12 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 6 أشهر

Assistant Signal Engineer في BPS
  • لبنان
  • أشغل هذه الوظيفة منذ فبراير 2012

Mainly responsible for the maintenance and up keep of the following sections over Sukkur Division;
Section

ASSISTANT TELECOM ENGINEER في Pakistan Railways
  • باكستان - كراتشي
  • يناير 2013 إلى ديسمبر 2015

BIOMATRIC(Face .Finger)
To ensure maintenance and installation, interfacing of bio metric system,
Installation bio metric system under supervision and have knowledge about bio metric software.

CCTVT Camera
To ensure maintenance and installation of cctvt camera,
Installation camera under supervision and have knowledge about
NVR working on ip based, video cable, power cable and cctvt Camera.
To ensure OPERATION AND MAINTAINANCE of:
Microwave sites :
960 channels MW radio system in 7 GHz band i.e. 878c-82860 GTE Len Kurt
UHF sites
36 channels UHF radio system in 1.5 GHz band i.e. 71E3 AEL Microtel
Station to station VHF sites.
Icom Japan VHF installed in locomotives Icom Japan
Diesel Generators, Power Supplies & Batteries Duets FL series
PABX and GTD-1000 Telephone Exchanges
Maintenance of PL routes (overhead lines)
To conduct inspection of Stations
To conduct footplate inspections & ticket less inspection.
Efficiently use the Budget for repair and maintenance of telecom gears, by Floating tenders and through local purchase.
To coordinate with other branches in recruitment process and finalization of Accident enquiries.

Assistant Telecom/assistant Signal Engineer في Pakiatan Railways
  • باكستان
  • يناير 2012 إلى يناير 2013

System of working (LME All-relay Interlocking and standard III interlocking)
Sukkur station to habibkot and habib kot to dadu station (interlocking and non
interlocking without track circuit)
Main Duties
Responsible for efficient maintenance and repair of all Signaling
Installations to ensure Safety, efficiency and economy in accordance with
specified Signaling Standards, Rules and Regulations.
To carry out regular inspections and testing of all the signaling equipment.
To arrange indenting of material from Store for maintenance and new works.
To ensure proper maintenance of the following equipment:
Track Circuits
DC track circuiting is provided in all yards and block sections.
Signals
All color Light Signals and all types e.g. Routing, Shunting and Main
Signals.
Relay Rooms (58 No.s), Underground Cables (Power, Signal & Telecom)
Signal Rehabilitation Project: EBI-Lock 950 R3 system
To co-ordinate with Bombardier Transportation and CRSC
Representatives in the Execution of project while representing demands
of Sukkur Division.
Summary:
In depth knowledge and practical experience of the following:
Mechanical Signaling and Interlocking
Mechanical Detectors: 1-way, 2-ways 3-ways, 4-ways and up to 8-ways
Lock Bars: IRS Type and NWR type Facing point Bolt Lock, Switch Extension piece A & B.Stretcher Bar, Clamp for Lock Bar.
Mechanical Cranks: Adjusting Crank, Crank Compensator, Accommodating Crank, Crank Horizontal, Crank Vertical, Foundation A type, Rod Rollers 1-ay to 4-way, CI Base for Rod Rollers, Locking Trough, Signals IRS and NWR type,
Automatic Tripping Device, Wire Adjusting Screw, Signal Post and arms, and different types of Lenses.
Lamps case IRS and NWR type, Special Counter weight. SM Slide frame, Slot Indicators, Lever Contact Box, Arm, Contact Box, Reversers, Standard I, II, & III interlocking systems:
Electrical Signaling and Interlocking:
Electrical Point Machines: Electrical Detectors, Control & Indication
Panels, Color Light Signals, AC/DC Track circuits, Cable Distribution components i.e. Veretilers, Junction Boxes.
All Relay Interlocking systems of Siemens and LME Ericcson. Track Relays.
Lock 950 R3 & R4 System, OCS 950 (Object Controller System 950), IPU
950, JEA 73 Non-trail able internal Lock Point Machine, EEA-5 Non-trail
able external Lock Point Machine, ZPW2000 coded frequency Shift: AC track circuits, 25-Hz Phase sensitive AC Track Circuit, Cab Signaling with
ATP, Passive Balise etc.

Divisional Assistant Signal Engineer في Pakistan Railways
  • باكستان - كويتا
  • نوفمبر 2011 إلى فبراير 2012

Responsible for efficient maintenance and repair of all Signaling
Installations to ensure Safety, efficiency and economy in accordance with specified Signaling Standards, Rules and Regulations.
To carry out regular inspections and testing of all the signaling equipment.
To arrange indenting of material from Store for maintenance and new works.
To ensure proper maintenance of the following equipment:
Signals
All color Light and semaphore arm Signals and all types e.g. Routing, Shuntingand Main Signals.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها,
  • في Mehran University of Engineering and Technology Jamshoro
  • يناير 2009
بكالوريوس, Telecommuncation And Signalling
  • في Mehran UET jamshoro
  • نوفمبر 2008

B,E Telecommunication from Mehran Uet jamshoro (2005-2008)1st division. Major subjects . 1.Telecommuncation wireless system 2.Signalling system. 3.Optical Fiber cable(splicing) 4.Antenna 5.Radar system 6.Sattelite system and e.t.c

Specialties & Skills

اللغات

الانجليزية
متوسط