Muhammad Fiaz Khan, Chief Surveyor

Muhammad Fiaz Khan

Chief Surveyor

MMPakistan

Location
Pakistan
Education
Bachelor's degree, Arts
Experience
6 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :6 years, 10 Months

Chief Surveyor at MMPakistan
  • Pakistan - Mansehra
  • My current job since July 2017

EXPERIENCE RECORD

(3 Years) (MM Pakistan (Pvt.) Ltd)
(September1/07/2017 to 31/05/2021) (Senior Surveyor - civil & Geo technical Works)

Suki Kinari Hydro Power Project: 1.9 billion USD CPEC project involving construction of 22.6KM lined Headrace tunnel. Access tunnel, tailrace twin tunnels, eleven Adits, Powerhouse cavern, Penstocks, Surge shaft, Main Dam, Spillways and Intake structure on Kunhar River in KPK province. It is a run-of-river project which on completion shall contribute 884MW electric power to the National grid of Pakistan.
Activities:
• Review of Contractor’s design submissions, with context of surveying.
• Construction survey supervision of Main Dam, Power house works involving survey control network, cross section work and excavation sheets verification of dam site as well as power house site.
• Supervision of all sort of surveying work of power house area i.e. checking of under cuts/overcuts and over breaks and to inform the OE, s supervising staff to take action for the improvement of the work quality.
• Checking of the as built survey and to compare with the design to evaluate the deviations.
• Tunnel cross sections check for undercut/overcuts.
(One year) (Afrina Establishment Jeddah KSA)
(April 14, 2015 to April 14, 2016) (Chief surveyor)
Project: Construction of Bayot Plazas High rise buildings work, Medina Road Jeddah KSA. Activity: Overall responsible for the Management of the site survey supervision works.
• Responsible for survey, layouts, control survey check and make it sure that survey work meets the design with in permissible

(Three Months) (Daewoo Engineering and construction (Pvt.) Ltd)

(December 31, 2014 to March 31, 2015) (Chief Surveyor)
Patrind Hydro power project Muzafarabad AJK & KPK: Construction of 150MW Hydropower station.
Activity: Resolution of issue raised by the consultant for big deviation after breakthrough traverse closing error.
• Responsible for control survey, setting out work, as built survey work. Cross section survey in tunnel to check the over cuts/under cuts and over breaks.

(4 years, 9 Months & 9 days) (NESPAK F (Pvt.) Ltd)
(February 17, 2010 to Nov, 26 2014) (Senior Surveyor)
Neelum Jhelum Hydro power Project (970MW AJK): JV between MWH, NORPLAN, NESPAK, NDC & ACE
Activity: Over all supervision of 10 survey crew members working at site C-2.
• Independent check of contractor, survey work using our own survey instrument and staff and if any deviations found and the contractor is conveyed to rectify the same at the site.
• Providing the necessary data to our site engineers and geologist on their request.
• Checking and keeping the record of convergence and deformation monitoring data and handing over to the geotechnical

(2 years 9 months and 23 days) (Engineering Management Services JV with Geo consult/ Typsa Austria)
(April 17, 2007 to Jan, 10 2010) (Senior survey Specialist)
Lowari Road Tunnel Project KPK
Activity: Supervision of all survey work of contractor (Sambu construction Ltd)
• Checking of survey control network for the Lowari Road tunnel project.
• Providing topographic survey of the required area to the designer for design purpose.
• Stockpile calculation using 12 D software.

(26 years) (Survey of Pakistan, M.O. Defense)
(November 1st, 1981 to April 1st 2007) (Senior Surveyor)

• Appreciation Letter: From Director survey Training Institute Islamabad

Education

Bachelor's degree, Arts
  • at Punjab university
  • April 1996

BA 2nddivision Diploma in surveying 1st Division

Languages

English
Expert
Urdu
Expert

Training and Certifications

Diploma In Land Surveying (Training)
Training Institute:
BTE Lahore Punjab