Muhammad Junaid إقبال, QA/QC Maneger

Muhammad Junaid إقبال

QA/QC Maneger

SAS

البلد
المملكة العربية السعودية - ينبع
التعليم
بكالوريوس, Electrical Engineering
الخبرات
17 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 3 أشهر

QA/QC Maneger في SAS
  • المملكة العربية السعودية - ينبع
  • أشغل هذه الوظيفة منذ فبراير 2021

Here i am responsible to implement Quality system as per ISO and schedule Q requirements to mange the PQI (Project quality index) at its maximum level.

E&I QC Supervisor (Aramco Approved) في SULZER CHEMTECH (UK)
  • المملكة العربية السعودية
  • أكتوبر 2016 إلى يناير 2021

PDA REVAMP PROJECT LUBEREF II (ARAMCO BASED OIL REFINARY) YANBU.

Scope of project:
• Installation and Pre-commissioning of DCS/ESD/MCM/UCP/LV and MV MCC Panels/IR Panels/Dry type transformers/UPS and PDP panels.
• Grounding E&I Panels/ Transformers/ Local gauge boards and Field/skid instruments etc.
• LV/MV motors installation/Pre-Commissioning & Commissioning Activities
• Lighting Fixtures installation as per SAES and Projects Requirements
• Field Instruments installation, calibration, Pre-Commissioning and Loop test activities

Responsibilities and Skills:

Checking the conformity with the quality control plan, obtained the relevant documentation, check procedures and equipment to be used in test control and inspections, manage documents certifying test, control & inspection.
Executing the inspection and quality control activities on site, in material ware house and inside of buildings.
Conducted Inspection for all the Materials and Equipment received on site prior to installation to make sure that all materials & equipment are per specification requirements and latest version of Saudi Aramco Material Standard and Specification (SAMSS), NEMA, NEC and other applicable industry code and standards with complete documents (e.g. Material Test Certificate or Certificate of Conformance, Calibration Certificate, Instruction manuals & procedures).
Prepare Oversize/Over material, Shortage and Damage Report (OSDR) and submitting to QC Coordinator and Material Department.
Executed the supervision and coordination of quality control activities on instrumentation/electrical equipment and systems construction and installation activities
Executed the specific inspection on materials.
Issuing, follow up and approval of NCR
Preparation of QC documents for Mechanical Completion Documents (MCD) for review of QC Engineer and finally hand over to client.
Monitoring, review and inspection of all major activities related to quality of instruments construction work.
Attending weekly quality meeting with contractor and company Inspector to implement quality procedures at site.
Control of MOM (Minutes of Meeting) and follow-up the Quality Actions (Observations and Non- Conformance Reports).
Daily walk through of site to make sure work is ongoing as per ITP and Saudi Aramco Procedure.
Finalized As-built drawings, mark up, redlining and shedding of drawings.
Execution of works and comply fully as per standard and approved specifications.
Vigilant all the time and absolute sincere about the job execution.
Commissioning Activities and Functionality testing electrical & instrumentation works with Project Management Team trough Handover to the client.
Planning for all electrical and instrumentation activities and associated work requirements such as; drawings, materials and tools.
Responsible for the Electrical and Instrumentation installation which included above and underground cable routing, cable conduits & cable trays, Earthing and Lightning Protection, lighting system installation.
Installation of all Electrical Equip. Cabinets, Panels, and Motor control centers MCC, Instruments, Switchgears, Transformers, Variable Speed Drives VSD.
The ability to interpret ILDs, Single Line Diagrams & Electrical/Instrumentation drawings.
Follow up Instrument Lists, Electrical Consumer Lists, power& Instrumentation and control Cables lists, Diagrams (P&IDs).
Following up all Electrical, l&C Installation for HV & MV substations and plant control buildings and auxiliary buildings.
Following up all Electrical, l&C Installation for Fire and gas detection system, fire Alarm System, FM200 system, PAGA systems, CCTV System, UPS system.
Solve out Problem in the Field Rectification & Modification of NCR and Make As-Build if required and close punch list items.

QA/QC Supervisor @ Const. of Uch Power plant Phase 2, Balochistan. في Descon
  • باكستان - كويتا
  • أكتوبر 2014 إلى سبتمبر 2016

Duration; 09 October 2014 to 10 Sep 2016.
Position; QA/QC E&I Supervisor.
Employer; Descon Engineering Limited Pakistan

Key Responsibilities:

Install, test and calibrate field Instruments as (Pressure, temperature, flow, level, etc.) as required according to the project specification and codes.
Conducted Inspection for all the Materials and Equipment received on site prior to installation to make sure that all materials & equipment are per specification requirements and latest version of NEMA, NEC and other applicable industry code and standards with complete documents (e.g. Material Test Certificate or Certificate of Conformance, Calibration Certificate, Instruction manuals & procedures).
Prepare Oversize/Over material, Shortage and Damage Report (OSDR) and submitting to QC Coordinator and Material Department.
Executed the supervision and coordination of quality control activities on instrumentation/electrical equipment and systems construction and installation activities
Attending weekly quality meeting with contractor and company Inspector to implement quality procedures at site.
Control of MOM (Minutes of Meeting) and follow-up the Quality Actions (Observations and Non- Conformance Reports).
Daily walk through of site to make sure work is ongoing as per ITP and Quality Procedure.
Co-ordination with client and subcontractors.
Undertaking E&I Calculations and Reviews on the Consultant/Contractor's design and coordinate the design review within the project team within the Scope of Work.
Monitor and verify through surveillance of ongoing work in instrument equipment installation, hook-up, loop checking and functional testing in compliance with the technical requirements for the project.
Calibration and site commissioning of all field equipment. Level master, transducers, gauges, public announcement systems, and fire and gas detectors.
Initiate and follow up clearance of Punch List items during construction & pre-commissioning phases, as per CMS procedure; provide technical
Input to evaluate requirements with regards to specification, SOR and operability.
Having complete package of experience relevant to DCS/ESD (YOKOGAWA Centum VP) system Panels & Marshaling cabinets i.e. from material receiving to commissioning.
Function test, calibration and installation of PV, FV, LV control valves.
Installation of cables/conduits as per project requirement.
Excellent instrument calibration skills with appropriate usage of test equipment: HART 374 communicator, loop calibrator, temperature calibrator and Fluke Multi Tester etc.
Cable Glanding and termination of instruments junction box (JB) and Marshalling Cabinet (MC).
To assess any deviations from procedures or project requirements and make appropriate recommendation to the Management.

QA/QC E&I Inspector at Attock Oil Refinery Extension Project في DESCON
  • باكستان - إسلام أباد
  • ديسمبر 2011 إلى سبتمبر 2014

Position; QA/QC E&I Inspector
Employer; Descon Engineering Limited Pakistan
Duration; 30-December 2011 to September 2014

Responsibilities:

Quality check and Review on detailed design/specifications and drawings, submitted by Contractors and Consulting Engineers and ensure fit for purpose and
Technical quality, in terms electrical inputs.
Cable pulling & termination (both Power & Instrumentation i.e. MV/HV/LV/PLTC/ITC/TC/Data Highway Cable/FO etc.) with standard test requirements i.e. Meggaring/Continuity/ HI - POT tests etc.
Installation/Commissioning of monitoring control panel i.e. MCM/VMS System.
Verify all required inspection report and test records are systematically generated and compiled according to the Approved QC Procedures.
Inspection of Switch/Control Gear Panels installation and Cable termination.
Inspection of Induction and synchronous motors installation.
Cable trench/Duct Banks inspection as per Standard.
Insulation Resistance and Winding Resistance Testing of LV, MV motors.

E&I Inspector at Construction Of Engro Fertilizer Phase 3, Daharki. في Descon
  • باكستان - كراتشي
  • فبراير 2007 إلى ديسمبر 2011

Position; QA/QC E&I Inspector
Employer; Descon Engineering Limited Pakistan
Duration; 20-Feb 2007 To 02- December 2010

Performed E&I relevant inspection as per approved ITP and Quality standards.

QA/QC E&I Inspector Revamp Of Pak American Fertilizer, Iskendrabad. في Descon
  • باكستان - سركودھا‎
  • يناير 2011 إلى ديسمبر 2011

Position; QA/QC E&I Inspector
Employer; Descon Engineering Limited Pakistan
Duration; 20-Jan 2011 to 22- December 2011

Performed E&I inspection as per ITP and approved Standards.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في University of engineering & technology Taxila
  • يناير 2006

PEC Registration Number: Elect 22809 2006 B.Sc. (Electrical Engineering) from University of engineering & Technology Taxila securing A- Grade. I have very bright education career as shown in b/m points: Secured 1st. position in matriculation result of 2000 of D.G Khan Board. Due to 1st. position I was awarded admiration shield by chief executive of Pakistan (Gen. Pervez Musharraf at Governor house lahore) in 2000. 3-Secred 3rd. position in 2nd. Micro Mirax exhibition held at U.E.T Taxila in 2006.

Specialties & Skills

Calibration
Instrumentation
QA QC Engineering
Electrical Controls
Electrical Testing
AIR CONDITIONING
CATERPILLAR
CIRCUITS
CONTROL ROOM
COOLING
ENGINEER

اللغات

الانجليزية
متمرّس

الهوايات

  • Literature & Movies