Site Manager
ALFEN Construction
مجموع سنوات الخبرة :17 years, 3 أشهر
Professional experience in Infrastructure, Utilities, MEP Works, Prefabricated building, Sewage treatment Plan, RO Plant, HDPE Evaporated Pond, LV Substation, DG Powerhouse, Fire fighting Works, Fire Alarm security system, Fire suppression system, Mechanical workshop & Warehouse.
1- TEKFEN CONSTRUCTION & INSTALLATION CO. Inc., at YANBU NORTH JEDDAH PIPELINE, SAUDI ARAMCO Project.
2- GAMA Al-Moushegah Arabia Ltd & SAIPEM, at SAUDI ARAMCO Khurais Expansion Satellite GOSP Project.
Joint Venture (JV) with Alfen Construction Company in Riyadh Metro Project. A well experienced in Construction of Civil Works, Installation of Pre-Engineered Steel Buildings, Prefabricated offices, Fence work, DG power house, LV Cabling, Asphalt & MEP works & construction of reinforced concrete beam for Gantry track, Fire fighting & Fire alarm system.
1- SAMSUNG, Riyadh Metro Alliance, at line 4 & 6.
2- FCC Construction, Riyadh Metro Alliance at line 5.
3- ALSTOM, Riyadh Metro Alliance at TJV Site
MEMF Automation Systems Company is a Saudi company, a subsidiary of KFB Holding Group, the largest system integrator for Siemens in the field of process & industrial automation. MEMF is certified system integrator for Siemens in the fields of process & industrial automation in K.S.A. We serve in the following areas: PLC Programming, Services in troubleshooting in PLC & Drives, After sales services in LV Panels & soft starters. Power Transformers, AC & DC Motors. Additionally, offer engineering services, Annual maintenance contracts, commissioning, up gradation projects, manpower resources supply and electrical retrofitting & mechanical reconditioning of CNC machines.
Installation of Power Transformers, LV Switchgears & Diesel Generators. Also deals with annual & Periodic maintenance contract.
A sound experiance in Project management of water supply, wastewater, lift irrigation and industrial projects.
Major Projects are:
1- Water supply project PAF Sakesar. Project includes 3 pumping stations and 6.5 km long 5” MS piping.
2- Sadqia canal lift irrigation project, Installation of 4 heavy duty vertical types PNW pumps with associated piping and intake structure.
3- Improvement of sewage system up to 72” RCC, AC & GRP pipe lines, up gradation of existing pumping station and disposable station.
4- Clean Drinking Water for All (CDWA) project. Installation and O&M for water filtration Plants.