NE designing
LCC
مجموع سنوات الخبرة :2 years, 1 أشهر
1:worked as NE MW and RF design engineer.
2:worked as MW and RF MOP designing.
3:worked as MSAN, FTTH, FTTM MOP designing engr.
4:Preparing PAT documents.
5:Worked as Transmission design engineer.
I am very good in studies.