Muhammad Norman Matlan, Electrical and Instrument Engineer

Muhammad Norman Matlan

Electrical and Instrument Engineer

Dayang Enterprise Sdn. Bhd.

البلد
ماليزيا - Kuala Lumpur
التعليم
بكالوريوس, High Voltage
الخبرات
12 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 1 أشهر

Electrical and Instrument Engineer في Dayang Enterprise Sdn. Bhd.
  • ماليزيا - Petaling Jaya
  • أشغل هذه الوظيفة منذ أبريل 2021

1) APRIL 2021 - CURRENT

COMPANY : DAYANG ENTERPRISE SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Provision of Integrated Hook-up and Commissioning (iHUC) Services for Petronas Carigali Sdn. Bhd.
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT 1 : D18 Gaslift Compressor (GLC) Upgrade
LOCATION : D18 Field, Sarawak Water
PROJECT 2 : BNJT-K Phase 3 Infill Drilling
LOCATION : Baronia Field, Sarawak Water

• Reviewed drawings, Material Take-Off (MTO), Datasheets, Specifications for Motor Control Center (MCC), Loadbank, Fuel Gas Superheater and Gas Lift Compressor.
• Conducted and lead Joint-Review, Daily Meetings and Engineering Review with Consultants, Clients and Vendors (TAMCO Switchgear, Statron, Electrodynamics).
• Provided technical expertise on constructability and commissionability prior to installation and commissioning of multiple electrical packages.
• Developed eletrical switching procedures for Switchgears.
• Expedited procurement process and delivery for multiple packages of Tag Items, Bulk Items & Long Lead Items (LLI) such as Load Bank and Motor Control Centre (MCC).
• Reviewed and expedited RFQ/ITB, Technical Evaluation, Commercial Evaluation and issuance of Purchase Order (PO).
• Lead the development for E&I Commissioning Procedures, Package Commissioning Procedure with Vendors (e.g. Gas Lift Compressor), Construction & Commissioning Inspection Test Record (ITR), Checksheet Overview.
• Developed/ reviewed STQ, ETQ, Red-line Mark-up Drawings, and Vendor Data Incorporation (VDI).
• Developed System Definition, System Boundary/Demarcation/Mark-up and E&I Jobcards.
• Joint review Gas Lift Compressor Package with Mechanical Team on Fuel Gas Heater & Motor.

Electrical And Instrument Engineer في HHA Associates Sdn. Bhd.
  • ماليزيا - Petaling Jaya
  • يناير 2021 إلى مارس 2021

2) JANUARY 2021 - MARCH 2021

COMPANY : HHA ASSOCIATES SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Provision of Integrated Hook-up and Commissioning (iHUC) Services for Petronas Carigali Sdn. Bhd.
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT 1 : Dulang Revisit 2.0
LOCATION : Dulang Field, Terengganu Water
PROJECT 2 : Integrated Bekok Oil (IBO)
LOCATION : Bekok Field, Terengganu Water

• Review Electrical and Instrument documents such as Piping & Instrument Diagram, Datasheets, Single Line Diagram and ISO Metrics.
• Lead the preparation for Construction and Commissioning Job Cards using iHUC Manhours Norms.
• Developed System Definition & Demarcation, Construction & Commissioning Inspection Test (ITR) and Checksheet Overview.
• Mentoring Junior Engineer on ITB/RFQ preparation and Jobcards development.
• Offshore site visit to Dulang platform to review, advise and confirm E&I scope for HUC execution.

Electrical And Instrument Engineer في PETRA Resources Sdn. Bhd.
  • ماليزيا - Petaling Jaya
  • مارس 2019 إلى ديسمبر 2020

3) MARCH 2019 - DECEMBER 2020

COMPANY : PETRA RESOURCES SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Provision of Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 to 2018
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT : Baram South Redevelopment Project
LOCATION : Baram Field, Sarawak Water

• Focal HUC E&I Engineer in Detail Design Engineering with Consultant, MMC Oil & Gas Engineering Sdn. Bhd.
• Review E&I engineering documents (drawings, datasheet, MTO etc.) .
• Lead HUC E&I Offshore Site Visit along with the Vendors, Client & Operation.
• Lead E&I Engineer to drive, manage and monitor overall HUC Electrical and Instrument scope throughout project execution.
• Supervise and coach subordinates (junior E&I engineers) on E&I scope understanding and job deliverables.
• Plan, organize and manage procurement of E&I items and packages.
• Expedite delivery of E&I packages to PRSB Yard Labuan and loadout to BAJT-H platform, Miri Water via arranged Vessel (AHTS).
• Prepare and manage Technical Query and Site Technical Query upon engineering deviation and in-situ site requirement during HUC campaign execution (onshore & offshore).
• Drive, coordinate & supervise Vendors for multiple packages such as DCS, SIS, Diverter Valve, FCV, ACV and SIPROD Alarm Panel from ITB till vendors' scope completion.
• Conduct Technocom, Kick Off Meeting (KOM) and Technical Clarification (TC) Meeting with Vendors & Client to align expectation of end deliverables and acceptance criteria.
• Coordinate, witness and verify Final Acceptance Test (FAT) and Site Acceptance Test (SAT) results with Vendors, Client and Operation.
• Incorporate and adapt Silverwell Digital Artificial Lift (DIAL) information into DCS Human-Machine Interface (HMI) Graphic.
• Lead daily work planning and provide recovery plan as and when required.
• Review/develop E&I system and sub-system boundary, Inspection Test Record (ITR) and system matrix.
• Prepare overall E&I scopes workpack including jobcards, manpower loading and procedures
• Provide input to Planner for site manpower coordination and activity sequencing for effective execution.
• Check and verify procedures, consumables, tools, equipment, materials & spares requirement for E&I.
• Involve and contribute in client's review session such as Line Design Review (LDR), Hazard & Operability (HAZOP), Hazard Identification (HAZID), Pre-Activity Safety Review (PASR)/ Pre Start-up Safety Review.
• Ensure end-to-end operational activities are being executed within schedule, cost, compliance to relevant policies, statutory requirement and regulations.
• Ensure operational excellence to achieve result that meet the specification and acceptance criteria for smooth handover.
• Ensure all activities are complying to PTW system, JHA, safety rules and best practices.
• Conduct morning tool box briefing with the team members at worksite.

Electrical And Instrument Engineer في PETRA Resources Sdn. Bhd.
  • ماليزيا - Petaling Jaya
  • مايو 2018 إلى يناير 2020

4) MAY 2018 - JANUARY 2020

COMPANY : PETRA RESOURCES SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Provision of Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 to 2018
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT : Temana Early Monetization Project (EMP)
LOCATION : Temana Field, Sarawak Water

• Organize, plan and execute hook-up and commissioning of Electrical and Instrument package for platform TEJT-C, TEJT-W and TEDP-B throughout project duration (covering SIPROD Conversion, platform normalization and well tie-in)
• Coordinate, witness and verify Final Acceptance Test (FAT) and Site Acceptance Test (SAT) activities and results e.g. Flow Control Valves (FCV) and Choke Valves etc. with Vendors, Client and Operation
• Lead offshore HUC team in interfacing with Drilling team, Rig (e.g. UMW Rig Naga 3, UMW Rig Naga), Temana Offshore Installation Manager (OIM) and Operation team for smooth work coordination and execution.
• Lead presentation and discussion e.g. SISO/ SIPROD/ SIPCOM for HUC scope of work at offshore including structural, piping and E&I disciplines
• Became Acting Construction Superintendant to lead Construction Team e.g. during rig-up, well tie-in and demobilization preparation
• Supervise E&I Team on overall E&I scope, identify root cause for arising issues, perform troubleshooting and device strategy/ provide solution to rectify the issues
• Manage vendor mobilization and demobilization plan to support project activities. Supervise vendor's task completion at site to ensure satisfactory and acceptable results
• Support Unloading Wells Team in sample taking, bean-up process and High Low Pilot installation
• Lead and drive construction and commissioning of platform safety system
• Ensure end-to-end operational activities are being executed within schedule, cost, complied to relevant policies, statutory requirement and regulations
• Ensure operational excellence to achieve result that meet the specification and acceptance criteria for smooth handover
• Ensure all activities are complying to PTW system, JHA, safety rules and best practices
• Conduct morning tool box briefing with the Team members and Contractors at worksite

Electrical And Instrument Engineer في PETRA Resources Sdn. Bhd.
  • ماليزيا - Petaling Jaya
  • يوليو 2017 إلى أبريل 2018

5) JULY 2017 - APRIL 2018

COMPANY : PETRA RESOURCES SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Subcontract for Hook-up and Marine Vessels for PCC of BESAR Drilling Platform Alpha (BsDP-A)
CLIENT : Malaysian Marine Heavy Engineering (MMHE) & Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT : Hook-up, Commissioning and Host Tie In Project for BsDP-A LOCATION : Angsi Field, Terengganu Water

• Lead and coordinate Permit To Work (PTW) for HUC Team (PCSB, MMHE & Petra) by reviewing completion of document submission (e.g. relevant attachments such as JHA), follow up with sequential approval parties and ensure PTW close out after job completion. Became PTW Applicant for several critical activities such as Welding (Hotwork), Heavy Lifting (28 Metric Tons), Gas Leak rectification at Christmas Tree (Wellhead) and Gas Engine Generator PTR (Performance Test Run 72 Hours).
• Conduct loadout preparation at yard e.g. materials inspection, packing list and cargo check
• Lead E&I team in interfacing with MMHE team, CSR, PMT, Vendors, Drilling and Operation at BsDP-A
• Plan, execute, manage and supervise E&I Team on overall E&I scope, identify root cause for arising issues, perform troubleshooting & device strategy/provide solution to rectify the issues at both onshore & offshore
• Supported Planner onboard by reporting daily site progress, manpower coordination (site allocation and welfare) and preparing summary time sheet.
• Demonstrated high commitment and dedication by taking the role of Operation Team Leader (OTL) and Planner during final campaign due to bedding limitation at offshore. Take responsibility for Daily Progress Report, daily decision making for Petra team, representing Petra in Handover System meeting with OIM and coordinate marine vessel operation e.g. berthing arrangement.
• Actual hands-on works with Construction & Commissioning crews at site such as opening wellhead wing valve for BsDP-A start-up, parameters reading taking (pressure, ambient, LEL), hydrotest and N2He reinstatement leak test preparation, mud and hydraulic bleed at wellhead (sampling) and High Voltage Switching (Diesel to Gas Generator system).

CONTRACT : Provision of Hook-Up, Commissioning and Topside Major Maintenance Services for 2013 to 2018
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT : Provision of Procurement, Construction & Commissioning (PCC) for Baronia Rejuvenation
LOCATION : Baronia Field, Sarawak Water

• Offshore focal point for manpower arrangement. Coordinate manpower request, crews’ mobilization, demobilization and welfare (e.g. timesheet, PPE, contract validity/expiry) and safe keeping of important certificates/ documents
• Generate marine related report such as People On Board (POB), Manpower One Week Look Ahead, 90 Days Forecast, Fast Crew Boat’s Clearance (Berthing and Offhire) and Oil & Water Consumption
• Establish Offshore Daily Status Report, Progress Claim and S-Curve
• Support logistic coordination for FCB and LCCT especially for lifting activity, FCB personnel transfer, bunkering, berthing and materials backloading
• Expedite site progress by completing Fill Weld and Dia-Inch daily target especially for Shutdown Scope
• Develop Baseline and Recovery Plan to clear outstanding scopes and catch-up progress
• Perform manhours budgeting, develop Rundown Activities and establish materials/tools/equipment • Perform hands-on works such as site preparation for Tie-In and Leak Test of New Fusible Plug Tubing at Compact Manifold, Wellhead Desander Skid, Flowline Pressurization Header, Desander, Closed Drain Header, Diesel Equalization, Sump Tank Replacement, Corrosion Loop, Diesel Fuel Transfer Pump and Gas Lift Manifold
• Assist Electrical Commissioning team on glanding, terminating, loop checking, function testing for installation of new Flow Transmitters, Instrument Cables and Pressure Gauge at site

Electrical And Instrument Engineer في Tanjung Offshore Services Sdn. Bhd.
  • ماليزيا - Miri
  • أكتوبر 2016 إلى يونيو 2017

6) OCTOBER 2016 - JUNE 2017

COMPANY : TANJUNG OFFSHORE SERVICES SDN. BHD.
POSITION : Electrical & Instrument Engineer
CONTRACT : Provision of Construction Work Request (CWR)
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
PROJECT : Structural & Piping Replacement (D35 & Bayan Package)
LOCATION : D35 & Bayan Field, Sarawak Water

• Execute E&I, structure and piping maintenance e.g. piping sectional replacement, spade installation, soaking, flushing, washdown, sump caisson isolation and Field Fit Weld on weld joint on site
• Perform troubleshooting and provide solution to expedite urgent job requests and accomplish job completion within schedule
• Perform Work Breakdown Structure (WBS) or work scoping for Rig Up Station, Pre-Lay Equipment, Erection of Scaffolding/Cold Cutting/Safe Habitat, Hotwork, Non-Destructive Test (Magnetic Particle/Radiography), Box-Up and Paint Coating
• Stakeholder management by interfacing with various hierarchy personnel and multiple teams at both onshore and offshore, such as Project Manager, Superintendent, Offshore Installation Manager, CSR, SOR, Supervisor (Maintenance and Production), Turnaround Manager and Operations team
• Cooperate with Front Line team for smooth Permit To Work submission for Client approval (e.g. Job Hazard Analysis, Hotwork Checklist, Hazardous Area, P&ID and ISO Matrix Drawing) along with sitework coordination while complying with HSE requirements
• Smooth Platforms Handover (D35, D18 and Bayan) to Operations with 100% scope completion. Conduct Final Confirmation Session with CSR, SOR and OIM
• Assist Quality Control documentation such as Visual Inspection Report for Piping, Welding Status Record, Hydrotest Report and Radiography Report
• Monitor daily progress, conduct DPR and feedback meeting with site team to assess matters arise and discuss the solution for better performance and results
• Develop Daily Progress Report and establish project S-Curve, HSE statistic, downtime record, manpower loading and equipment list

Electrical And Instrument Engineer cum Operation Technical Assistant في PETRA Resources Sdn. Bhd.
  • ماليزيا - Miri
  • سبتمبر 2013 إلى مايو 2016

7) SEPTEMBER 2013 - MAY 2016

COMPANY : PETRA RESOURCES SDN. BHD.
POSITION : E&I Engineer cum Operation Technical Assistant

PROJECT 1 : Offshore Service Contract (OSC) Topside Maintenance Execution for Gumusut Kakap
CLIENT : Shell Semi FPS
LOCATION : Gumusut Field, Sabah Water

PROJECT 2 : Topside Maintenance Execution Services for Samarang (SMQ-A)
PROJECT 3 : Topside Maintenance Execution Services for Sumandak (SUPG-B)
PROJECT 4 : Rigdown, Reinstatement & Helideck Installation for Bokor (BODP-A) and Baram (BADP-B)
CLIENT : Petronas Carigali Sdn. Bhd. (PCSB)
LOCATION : Samarang & Sumandak Field, Sabah Water Bokor & Baram Field, Sarawak Water

• Plan, execute, organize and manage outgoing and incoming materials, tools, equipment, crews and management visit
• Coordinate the inspectors and inspection on E&I, mechanical, welding and painting at site for Petra and SHELL
• Assist Field Engineer in reviewing engineering documents such as Piping and Instrumentation Diagram (P&ID), Single Line Diagram (SLD), Process Flow Diagram (PFD) and Workpack
• Develop checklist & compilation of database for newly installed instrument items such as item specifications, operating manual and perform troubleshooting
• Assist Petra Inspectors in completing and submitting Design Change Note (DCN), Site Work Approval Form (SWAF) and Quality Finding Report (QFR)
• Supporting site team in performing Risk Assessment, submitting Permit To Work via Integrated Safe System of Work (ISSOW) and Jobcards review
• Liaise with Vendors in managing Request Order, Material Take Off and Load Out process for equipment such as Safety Valve, Generator Set, Radars and Electrical tools
• Prepare documents such as Punchlist, STQ and Inspection Test Record (ITR)
• Hands-on involvement in site execution from start till completion of Turnaround, First Oil and First Gas Delivery
• Managing manpower at Miri Office by preparing legal documents prior crews's mobilization to offshore (SMART Card, Safety Passport, Competency Card, BOSIET & Work Permit) along with crews' welfare, contract management and training arrangement

Quality Assurance Engineer في CELESTICA ELECTRONICS (M) SDN. BHD.
  • ماليزيا - Johor Bahru
  • نوفمبر 2012 إلى أغسطس 2013

8) NOVEMBER 2012 - AUGUST 2013

COMPANY : CELESTICA ELECTRONICS (M) SDN. BHD.
POSITION : Quality Assurance Engineer
CLIENT : Agilent Technologies
PROJECT : Basic Instrument Division (BID) and System Product Division (SPD)
LOCATION : Johor Bahru, Johor

• Monitor the implementation of Quality Assurance and Quality Control, especially in process and customer delivery
• Responsible for any quality issues (Production) and attend to complaints from Client. Resolve the matter and provide immediate feedback"
• Drive Process Engineers and Quality Inspectors to close any Open Items pending for Corrective Actions
• Advise the suitable tools and process flow to be used according to Client's specific request
• Provide solutions for Special Customer Complaints using 8 Step Analysis (Root Cause & Preventive Actions), Fish Bone Diagram and Plan-Do-Check-Act (PDCA) Tools
• Conduct major audit such as External Safety Quarterly Audit and External Electrostatic Discharge (ESD) Audit with Client (Agilent) and Auditor (SIRIM)
• Inspect and monitor New Product Introduction (NPI) throughout Printed Circuit Assembly (PCA) process
• Conduct daily audit to monitor and highlight any abnormality to prevent reoccurence of repetitive problems
• Make decision for actions to be taken in addressing quality problems

Electrical And Instrument Engineer في TOTAL PLANT CARE (TPC) SDN. BHD.
  • ماليزيا - Bintulu
  • يونيو 2012 إلى أغسطس 2012

9) JUNE 2012 - AUGUST 2012

COMPANY : TOTAL PLANT CARE (TPC) SDN. BHD.
POSITION : Electrical & Instrument Engineer CLIENT : Asean Bintulu Fertilizer Sdn. Bhd.
PROJECT : Rejuvenation of New Cooling Tower (NCT) Project
LOCATION : Bintulu, Sarawak

• Execute Engineering, Procurement, Construction, Commissioning (EPCC) and associated works scope for ABF New Cooling Tower
• Monitor Chargeman, E&I Supervisor and Foreman performing termination at 9 panels of 3 phase cable at Main Substation
• Monitor vendors (TAMCO Switchgear, UPS Protection, Tokuyama, Makarmas Tenaga) at Main Substation upon fixing and upgrading equipment
• Guide Electricians of UPS Protection in completing continuity and functionality test of power cable (7.2kVx2) at Main Substation for NCT using High Pot Meter (Pressure Test)
• Design, install & terminate earthing system for lighting pole at NCT’s handrail & street lighting
• Assist Push Button Test Signal for NCT from Main Substation, Digital Control System (DCS) and Emergency Control Room (ECR)
• Monitor the Thermite Weld process at 76” and 80” pipe, plus with installation of Test Station above the pipe

Teacher في SMART Tuition Centre
  • ماليزيا - Bintulu
  • مايو 2012 إلى يونيو 2012

11) MAY 2012 - JUNE 2012

COMPANY : SMART Tuition Centre
POSITION : Teacher
LOCATION : Bintulu, Sarawak

• Teaching English, Mathematics, Science and History subjects to STPM, SPM and PMR students
• Strategize for exam readiness and create efficient work plan for students which include specific critical and logical thinking
• Practising learning method such as mind-maps memorizing, questions familiarization, analyze previous test papers and improvise statements response

Electrical And Instrument Engineer في CELESTICA ELECTRONICS (M) SDN. BHD.
  • ماليزيا - Johor Bahru
  • نوفمبر 2011 إلى أبريل 2012

10) NOV 2011 - APRIL 2012

COMPANY : CELESTICA ELECTRONICS (M) SDN. BHD.
POSITION : Electrical & Instrument Engineer CLIENT : Agilent Technologies
PROJECT : Interactive Working Instruction &
New Product Introduction (NPI)
LOCATION : Johor Bahru, Johor

• Supporting Engineers in publishing First Article report by doing each PCBA process from start to end
• Practice DMCA & PDCA technique, 5 tools method, Standard Operating Procedure, Kaizen's Improvement, and Lean Six Sigma Tools to complete task given
• Perform supplementary task such as adjusting pneumatic torque driver, taking sample data for Ionic Contamination Meter and solving line production’s problems

الخلفية التعليمية

بكالوريوس, High Voltage
  • في Management And Science University
  • نوفمبر 2011