Senior project control engineer في Elsewedy electric T&D
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يناير 2023

SAAD 348 MWp Solar Plant is Developed By REPDO Program Round 3 - Cat B - (The Renewable Energy Project Development Office) The Site is located 85 km east of the city of Riyadh, KSA.
scope of work consists of EPC, Testing & Commissioning, O&M for 2 Yrs. of 1x348 MWp PV Power Plant, Substation Interconnection of 33/132 KV, Including OHTL of 2 km

The major goals of the project are:
1- Execute a zero-accidents strategy.
2- Achieve JINKO POWER objectives in terms of the project delivery time, Long-term operability and maintainability.
3- Complete the project in accordance with the highest quality Health, Safety and Environmental (HSE) standards.
4- Perform the project with value-added Engineering, Procurement, and Construction practice.
5- Mitigate potential adverse risk consequences.
6- Achieve or exceed the PV solar plant Performance & Energy Yield requirements.

Responsabilites & Acheivements:
1- participate in the project time schedule in the study and tender stage with the project team
2- hold workshops with client planning and directors' teams, to create and validate contractual time schedules to be part of the project contract
3- create a project detailed baseline schedule as an EPC project consist design and procurement, construction and test and commissions with details of Areas, agreed methodology of works, project codes
4- create project Resource dictionary, and resource assignments as per agreed manpower productivity rates
5- Manage project control tasks which include preparation of baseline schedules, and progress reports and revising the output before distributing the reports to project parties
6- Monitor and control procurement and engineering progress.
7- Ensure that the subcontractor's performance is on track.
8- Propose the recommended recovery plans to complete the project schedule to ensure that critical issues and assumptions are covered.
9- Highlight variances, provide analyses and give recommendations on cost deviations when occurs.

Specialties & Skills

Planning
Cost Control
Primavera P6
Microsoft Excel
AutoCAD
DRAWING
DREDGING
PLANNING
MANAGEMENT
PROJECT MANAGEMENT
PROGRESS MONITORING
SHOP DRAWING
AUTOCAD
CLOSING (SALES)

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.


اللغات

الانجليزية
متمرّس
العربية
متمرّس