Baptiste Lakes Wastewater Feasibility Study for Council of the Summer Village of Island Lake, Athabasca,
Alberta: Conducted feasibility study for the wastewater collection and treatment systems which included evaluation of
the design alternatives including conventional gravity, small diameter gravity and low pressure STEP systems.
Prepared conceptual design, hydraulic calculations and cost estimates for the selected option of low pressure
Page 2 of 4
system comprising force mains, pumping stations, and sewage lagoon.
• Josephburg and Area Water Supply Feasibility Study for Strathcona County, Alberta: Prepared feasibility report,
conceptual design and cost estimates for the proposed domestic water distribution and fire water systems for the
Hamlet of Josephburg and Alberta’s Industrial Heartland Area including hydraulic modelling, storage reservoirs
and assessment of pumping requirements.
• Keephills Plant Wastewater Treatment System Assessment for TransAlta Utilities, Alberta: The study included
analysis of the demand conditions, complete review of the plant’s existing domestic wastewater treatment system
capacity and provided recommendations for the system improvements based on Alberta Environment’s
guidelines.
• Pedley Dam Decommissioning Project for Alberta Sustainable Resource Development, Hinton, Alberta: Conducted
complete hydrological analysis to determine frequency floods and investigated alternatives for the
decommissioning of Pedley dam.
• Raw Water Intake at North Saskatchewan River for ATCO Gas, Edmonton: Prepared preliminary design and
layout for the pump station including site access roads, grading and drainage works.
• Millennium Plant Water Main Analysis for Suncor, Fort McMurray, Alberta: Conducted hydraulic analysis for
determining domestic water servicing requirements of the camp site.
• 41 Avenue and QEII Interchange Storm Outfall Concept Review for the City of Edmonton: Prepared conceptual
design and report for the proposed storm outfall into Blackmud Creek to service Ellerslie / Southeast area in
conjunction with the proposed 41 Ave. /QEII interchange construction.
• St. Michael’s Cemetery Drainage Design for Ukrainian Episcopal Corporation, Edmonton: Performed hydrologic /
hydraulic calculations and prepared detail design for the site’s storm drainage connection to the City’s sewer
system.
• GO Community Centre Utilities Servicing for University of Alberta, Edmonton: Detailed design of the sanitary and
stormwater systems for the new facility.
• Edmonton South Terminal Hydrology Study for Enbridge Pipelines: Conducted detailed hydrology of the drainage
basin and prepared stormwater management plan and report for the terminal expansion project.
• CCIS Phase-2 Project for University of Alberta, Edmonton: Detailed engineering design and construction support
for the site development including surface drainage & grading, and water, sanitary and stormwater utilities.
• South Campus Servicing Study for University of Alberta, Edmonton: Conducted detailed hydrologic / hydraulic
analysis and prepared conceptual design and cost estimates for the storm, sanitary and water servicing of the
South Campus to align with the campus future development planning.
• Alberta Schools Alternative Procurement (ASAP-2) for Alberta Infrastructure / Clark Builders, Various Locations:
Detailed design and construction support for the development of four new school sites at various locations in
Alberta, built through design-build approach. The scope included design of water, sanitary and stormwater
systems, site grading and drainage, pavement structures, hydraulic structures and permitting support.
• West Edmonton Park Facility project for Finning Canada, Edmonton: detailed design of site development works
including pavement structures, underground utilities, surface grading and drainage, and provided permitting
support.
• Caribou Energy Park Development for Finning Canada, Fort McKay, Alberta: Prepared preliminary engineering
plans and design for the site development including pavement structures, underground utilities, surface drainage
and stormwater management systems, and associated site infrastructure.
• Edmonton North Terminal 2011 Site Containment and Drainage Project for Enbridge Pipelines: detailed design of
spill containment and surface drainage systems of the facilities areas of the terminal which included
hydrological/hydraulic analysis, stormwater management systems, roads, site infrastructure, vendor design
reviews, material requisitions, specifications and cost estimates.
• Edmonton North Terminal, Pembina Nipisi Heavy Recipient Pipeline Connection project for Enbridge Pipelines:
Detailed design for the site infrastructure development including roads, grading and surface drainage system.
• Heating Plant Expansion Project for EPCOR, Edmonton: Detailed design for the site infrastructure including
pavement structures, site grading and underground utilities.
• Athabasca Upgrader FEL 3 for Total Oil, Edmonton, Alberta: Prepared preliminary design for the new raw water
intake at North Saskatchewan River including site grading and surface drainage system for the facility and access
road.
- Company industry:
- General Engineering Consultancy
- Job role:
-
Civil Engineering