Muhammad Rizwan Sheikh, Projects Planner

Muhammad Rizwan Sheikh

Projects Planner

proserv

Location
United Arab Emirates - Abu Dhabi
Education
Bachelor's degree, machanical specialized in manufacturing
Experience
17 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 6 Months

Projects Planner at proserv
  • United Arab Emirates - Dubai
  • My current job since April 2013

 To produce comprehensive project schedules as per the project requirement with task information backups from project management team
 To co-ordinate with various intercompany departments to gather the information for updating individual project plan
 Update the project schedules as & when required keeping the baseline to track the actual Vs planned
 To analyze & highlight to management the critical path, mile stones and impacts on schedule as and when the changes happen
 To load manpower, materials, costs to schedule and track the same on regular basis
 To generate various reports from MS projects like S curves, Manpower histogram, loading charts etc
 To collate all the projects schedules into the master schedule and update the same on regular basis
 Analyze critical deliverables and conduct risk mitigation meetings with project team
 Analyze slippage impact during individual project schedule updates and identify activities to be expedited to dampen the effect of slippage
 Report variance and delays proactively after review of master payment schedule and POC for forecast submittals of invoice
 Maintain and follow up for Update Master List - Project Risk Mitigation Request
 Generate minutes of meeting for project progress review meetings and follow up to verify agreed closing dates
 Issue comparison report on updates for consecutive week`s project schedule weekly
 Prepare project schedule for proposals
 Assist Project Management Team to establish realistic and achievable schedule baselines and for all related issues
 Demonstrate a personal commitment to Quality, Health, Safety and the Environment
 Apply Proserv, and where appropriate Client Company’s, Quality, Health, Safety & Environment Policies and Safety Management Systems
 Promote a culture of continuous improvement, and lead by example to ensure company goals are achieved and exceeded

planning engineer at al jaber group
  • United Arab Emirates - Abu Dhabi
  • December 2008 to March 2013

 Prepare Long Range Capacity Plan for current and forecasted projects
 Prepare Monthly Master Schedule
- Schedule for design/detailing to meet dates of master schedule
- Schedule Procurement of Materials
- Schedule Production priorities
- Manipulate and allocate Manpower to use efficiently to meet master schedule

 Prepare Project Schedules
 Study Project specification documents to identify risks
 Prepare BOQ, Deliverables through drawing study, Sequence of production/erection with execution team
 Issue work instructions and Material requisitions based on IFC drawings, material nesting for procurement
 Estimate lead time for project activities, deliverables based on information from design, procurement, production, erection teams
 Setting Target for activities at micro-level keeping in view the Critical Activity Lead Time
 Progress monitoring to take corrective actions Proactively to meet the target dates from schedule
 Daily follow up of running projects for on time completion of activities with all the concerned project team members
 Expediting the Critical Jobs, Operations, Tasks through Man, Machine, Material and Method effectiveness
 Analysis of Equipment and Manpower output/requirement on Weekly Basis for efficiency
 Planning and monitoring the intermediate outsourcing to avoid delays
 Planning, Coordinating Logistics for intermediate outsourcing and delivery of completed deliverables
 Liaison for Client, Consultant, QC, TPI, Vendors to keep the schedule on track
 Identify and discuss with project team for high risk activities

Manager Production Planning and Control (M.P.P.C at Infinity Engineering (Pvt.) Ltd. Lahore, Pakistan
  • Pakistan - Lahore
  • January 2008 to November 2008

 Make quarterly Production Plan, Procurement Plan and accordingly check for the requirements along with Manager Operations
 Make Monthly Master Production Schedule based on capacity analysis
 Strive for the non-stop production to fill customer order by continuous monitoring of bottlenecks identified in capacity analysis
 Evaluating machines, material availability and manpower w.r.t. master production schedule and take corrective actions to meet the schedules
 Work closely with Quality Assurance department to manufacture quality products and eliminate non-value added processes
 Weekly participate Obeya room to look for progress during the week and finding solutions for the delayed orders,
 Provide recommendations for machining feasibility Report of new parts to be developed and manufactured
 Select machines for new and existing parts, make capacity planning and provide recommendations to build new capacity required to meet the customer orders
 Prepare feasibility report of new equipment required for new parts and update existing assets to improve quality and accordingly look for and evaluate equipment supplier’s offer
 Being a Supply Chain Management member keep up the supplier partner relationship between upstream by striving to fulfill customer schedules and downstream (sub-venders)
 Being a facilitator for quality circles, support quality circles to find better ways to do the things and monitor the progress of quality circles

Assistant Manager Production Planning and Control at A.M.P.P.C
  • Pakistan - Lahore
  • December 2006 to January 2008

Assistant Manager Production Planning and Control (A.M.P.P.C.)
December 2006-January 2008
• Scheduling the Workstations, Manpower and other resources according to the Master Production Schedule
• Supervising the production floor and identifying the factors which may influence the productivity
• Optimizing the Production Rates by time and motion study of each operation w.r.t. specific machining job, identifying bottlenecks and leveling bottlenecks by cutting time reduction and or by leveling the work stations
• Monitor the daily work station schedules according to the customer supplies and timely take corrective actions to avoid the delays
• Review layout for mass production parts to build Production Islands keeping in view the line balancing principle
• Improving productivity by reducing setup times using Work Element Analysis and using time and motion studies by transfer of setups from Online to Offline
• Improve material handling at shop floor
• Assist Management Representative for Document and Data Control for fully aligned PPAP (production part approval process) documents i.e. control plan, FMEA, shop floor documents i.e. process flow, operations sheets, inspection sheets and production planning docs i.e. standard tolling list, cycle time study, tool cost analysis sheets based on daily practice and tool wear analysis
• Production Optimization through selecting most suitable cutting tools, optimal cutting parameters, appropriate cutting strategies, proper tool holding system from best cutting tools and tool holding system manufacturers
• Arrange for daily machining requirements like production tooling, material and cutting tools to keep the production up to mark
• Keep up the shop floor team players for lean manufacturing techniques like Kaizen quality circles, Poka-Yoke, process focused manufacturing, automation and 5S activities

Education

Bachelor's degree, machanical specialized in manufacturing
  • at university of engineering and technology lahore
  • December 2006

Mechanical engineering specializedin industrial and manufacturing

Specialties & Skills

Capacity
Production
Outsourcing
Manufacturing
ARCHITECTURAL
AUTO CAD
BRIDGES
ENGINEER
FABRICATION
FLUX CORE
GROUND STORAGE
PAINTING
STRUCTURAL STEEL
project planning

Languages

Hindi
Beginner
Urdu
Expert
English
Expert

Training and Certifications

• Project Planning And Control Using Primavera P6 (Certificate)
Date Attended:
September 2012
Valid Until:
September 2012
• ASME Section VIII Div. 1: Boiler & Pressure Vessel (Certificate)
Date Attended:
May 2011
Valid Until:
May 2011