muhammad rizwan ullah, SHALL GTL

muhammad rizwan ullah

SHALL GTL

DOOSAN BLACKAT

Location
United Arab Emirates - Abu Dhabi
Education
Diploma, Mechanical
Experience
15 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 0 Months

SHALL GTL at DOOSAN BLACKAT
  • Qatar - Al Khawr
  • March 2021 to May 2022

WORK AS A PIPING SUPERINTENDENT . DOOSAN BABCOK

Piping Superintendent at QCON
  • Qatar - Al Khawr
  • January 2018 to January 2021

work as a piping and static equipment
installation and overhauling

Piping Superintendent at Al Hassan engineering abu dhabi llc
  • United Arab Emirates - Abu Dhabi
  • April 2015 to April 2017

• Execute test packages
• Checking for ISO & release for fabrication GRE underground piping & CS Review and implementation of Method Statement, Job hazard analysis, risk assessment and mitigation plan in consultation with HSSE team for key Piping activities
• Coordinate Main contractor engineering depart & piping depart discuss technical issue & solve the problem
• Preparation of weld map history sheet
• Fabrication piping CS, SS, Alloy, In Cloy Fabrication yard
• Pipe support fabrication
• GRE Preparation spool

Piping Supervisor at Descon engineering UAE BA
  • United Arab Emirates - Abu Dhabi
  • November 2010 to November 2014

• 48”, 42” 64”dia Flare line Stainless Steel 60000 dia inches. 50% Stainless Steel and 50% Carbon Steel erection and fabrication
• Good supervision of piping construction activities, Hydro testing of piping system and Test package release for Pre commissioning
Project co-ordination with client & consultant.
Maintenance of equipment’s.
Well versed with office manners, ethics and etiquette.
Fast grasping power and quick learning ability.
• Supervision of execution work during shop fabrication & erection during plant shutdown Field erection underground and above ground piping work and Correction punch list
• Support of piping work and as-built

Piping Foreman at CCC
  • Saudi Arabia - Jubail
  • August 2007 to August 2009

• Initiate preparation of work procedure and work instruction, related to mechanical work and welding activities.
• Preparation inspection verification plans and hydro test package.
• Initiate preparation site quires, Clarification request to verify discrepancies in the work with preference to drawing, Technical specification or actual site condition.
• Prepare notification for initial inspection prior to start of work.
• Witness Air blow/hydro test, Pneumatic test, WQT as well.

Piping Foreman at Descon engineering
  • Pakistan - Karachi
  • February 2006 to July 2007

• Fabrication piping spool material CS, SS ALLY DUPLEX
• Fabrication pipe support & fit-up with pipe spool location fab shop
• 40 people working Forman, char hand beneath
• Fabrication of furnace brogue tube pre fabricate
• Pre fab tube 0% repair job Casco habshan heater job

Piping Lead man at Dutch Babcock Germeny
  • Kuwait - Al Kuwait
  • January 2005 to November 2005

Lead Char hand on a daily basis
Co-ordinate with Superintendents of other disciplines at the project site and Construction Manager to review work interfaces at field to minimize hold on work
Preparation/implementation of Method Statement, Job hazard analysis, risk assessment and mitigation plan in consultation with HSE team for key Piping activities

Education

Diploma, Mechanical
  • at Govt polytechnic institute bhawalpour
  • November 2004

Mechanical Associate engineer DAE 03 YEARS

Diploma, DAE OF MECHANICAL
  • at Lahore School of Economics
  • November 2004

DAE OF MECHANICAL ENGINEERING COMPLETION 2004

Specialties & Skills

Testing
Fabrication
Manufacturing Engineering
PETROCHEMICAL
PETROCHEMICAL INDUSTRY
REFINERY

Languages

Hindi
Expert
Urdu
Expert
English
Intermediate

Training and Certifications

IOSH SAFETY TARING AND MANAGEMENT CERTIFICATE (Certificate)
Date Attended:
March 2017

Hobbies

  • Cricket
    Batting and fielding is good Internet use part time