SHALL GTL
DOOSAN BLACKAT
Total years of experience :15 years, 0 Months
WORK AS A PIPING SUPERINTENDENT . DOOSAN BABCOK
work as a piping and static equipment
installation and overhauling
• Execute test packages
• Checking for ISO & release for fabrication GRE underground piping & CS Review and implementation of Method Statement, Job hazard analysis, risk assessment and mitigation plan in consultation with HSSE team for key Piping activities
• Coordinate Main contractor engineering depart & piping depart discuss technical issue & solve the problem
• Preparation of weld map history sheet
• Fabrication piping CS, SS, Alloy, In Cloy Fabrication yard
• Pipe support fabrication
• GRE Preparation spool
• 48”, 42” 64”dia Flare line Stainless Steel 60000 dia inches. 50% Stainless Steel and 50% Carbon Steel erection and fabrication
• Good supervision of piping construction activities, Hydro testing of piping system and Test package release for Pre commissioning
Project co-ordination with client & consultant.
Maintenance of equipment’s.
Well versed with office manners, ethics and etiquette.
Fast grasping power and quick learning ability.
• Supervision of execution work during shop fabrication & erection during plant shutdown Field erection underground and above ground piping work and Correction punch list
• Support of piping work and as-built
• Initiate preparation of work procedure and work instruction, related to mechanical work and welding activities.
• Preparation inspection verification plans and hydro test package.
• Initiate preparation site quires, Clarification request to verify discrepancies in the work with preference to drawing, Technical specification or actual site condition.
• Prepare notification for initial inspection prior to start of work.
• Witness Air blow/hydro test, Pneumatic test, WQT as well.
• Fabrication piping spool material CS, SS ALLY DUPLEX
• Fabrication pipe support & fit-up with pipe spool location fab shop
• 40 people working Forman, char hand beneath
• Fabrication of furnace brogue tube pre fabricate
• Pre fab tube 0% repair job Casco habshan heater job
Lead Char hand on a daily basis
Co-ordinate with Superintendents of other disciplines at the project site and Construction Manager to review work interfaces at field to minimize hold on work
Preparation/implementation of Method Statement, Job hazard analysis, risk assessment and mitigation plan in consultation with HSE team for key Piping activities
Mechanical Associate engineer DAE 03 YEARS
DAE OF MECHANICAL ENGINEERING COMPLETION 2004