محمد شهيد, Electrical Engineer

محمد شهيد

Electrical Engineer

China Petroleum Engineering and construction corporation

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
بكالوريوس, Electrical Engineering
الخبرات
15 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 1 أشهر

Electrical Engineer في China Petroleum Engineering and construction corporation
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ مارس 2020

• Accountable for managing the site material order according to the site plan, program, and schedule as per project planning department to the proper flow of work.
• Advanced Project Management skills including coordination of a team with diversified skilled workforce, monitoring the progress of work, milestone achieved and identification of constraints.
• Work along with the HSE Manager evaluating the workplace environment and developing safety-management policies.
• Develop knowledge and work practices within the guidelines of health & safety and legislative regulations.
• Understanding how engineering systems are planned and implemented in oil and gas projects.
• Assist HSE Manager on reports and design of safety and necessary trainings.
• Monitor along with HSE Manager Compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.

Project: ADNOC Onshore. BOB Integrated facilities project.(Construction) Habshan Abu Dhbai UAE

Electrical Engineer في ADB-SAFEGATE
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2016 إلى ديسمبر 2019

• Accountable for managing the site material order according to the site plan, program
• Confer with engineers, customers, and others to discuss existing or potential engineering projects and products.
• Design, implement, maintain, and improve electrical instruments, equipment, facilities, components, products, and systems for commercial, industrial, and domestic purposes.
• Operate computer-assisted engineering and design software and equipment to perform engineering tasks.
• Direct and coordinate manufacturing, construction, installation, maintenance, support, documentation, and testing activities to ensure compliance with specifications, codes, and customer requirements.
• Perform detailed calculations to compute and establish manufacturing, construction, and installation standards and specifications compliance with operational and safety standards.
• Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
• Prepare specifications for purchase of materials and equipment.
• Supervise and train project team members as necessary.

Project :

Abu Dhabi International Airport Extension: Abu Dhabi United Arab Emirates

Designing Managing site, plans, programmed & schedules. Analyzing scope of work, Electrical Design review & monitoring. AGL substation execution & Equipment electrification.

Project Engineer في MTECH International LLC
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2010 إلى أكتوبر 2015

• Design functional electrical systems through the development and testing of components.
• Research and design components for electrical equipment and systems for use in commercial, military, or scientific industries.
• Supervise the manufacturing and installation of electrical equipment, components, and systems.
• Devise testing methods and properties to confirm the functionality of electrical components and systems.
• Develop electrical products and systems to meet customer specifications.
• Conduct research to collect and analyze data to create reports about ongoing projects.
• Communicate engineering information across teams and departments to facilitate successful completion of large-scale projects.
• Troubleshoot to solve unforeseen problems with product design or implementation. Maintain detailed database to catalog products and component parts.

PROJECTS :

Project #01
Designing Managing site, plans, programmed & schedules. Analyzing scope of work, Electrical Design review & monitoring. AGL substation execution & Equipment electrification.
Snamprogetti (SAIPEM) Dammam (SAFCO Jabal Ali Industrial city KSA).

Project#02
Designing of containerized substation, manual change over LV panel, verification & testing of Cables, testing & commissioning of panels. Successful handing over.
Coca Cola Beverages Limited Karachi Pakistan (Electrical Installation).

Project#03
Installation of Electrical Panel Boards & Electrification of complete factory machines, LV cable laying, marking, terminations, LV Cable testing, testing, commissioning and energizing.
SAIPEM CAMP at Rumailah Busrah Iraq (Electrical Installation).

Project#04
Installation of Electrical Panel Boards including Synchronizing and distribution panels complete commissioning and energizing, laying & terminations of LV Cable.
Sajer Zubair Oil Field Development, Iraq (Electrical Design).

Project#05
Electrical Load calculation of complete camp, cable size calculations, earthing system design calculation. Cable Quantity Calculation.
KRIS ENERGY BANGLADESH (Electrical Design/Execution).

Project#06
Installation of 750 GAS generator, Design & Installation of Electrical Panel boards, Installation of 2x15KVA UPS, Electrification, testing & commissioning of complete distribution system. Handing Over of project.

Electrech pvt. Limited في Electrech PVT Limited
  • باكستان - لاهور
  • سبتمبر 2008 إلى أبريل 2010

• Displayed exceptional skills in designing calculations using software (Echo dial (Schneider Electric), DEVA etc).
•Handled cable calculations using software tools.
•Studying a design brief thinking of possible design solutions
•Researching whether the design will work and be cost-effective
•Assessing the usability, environmental impact and safety of a design
•Collecting and analyzing data from tests on prototypes
•Modifying designs and retesting them.
•Writing regular progress reports and presenting them to project managers and clients.
•Power and schematic drawings of different switchgear. (DB, ASD/DOL circuit, synchronizing panel, VFD Circuits, HVAC) circuits.
•Preparing project estimate.
•Maintained the highest levels of work at all times; immediately identified, addressed, and resolved all problem service issues.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Azad Jammu Kashmir University Pakistan
  • يناير 2007
الثانوية العامة أو ما يعادلها, Science
  • في Garrision Science Degree College Lahore Cantt, Pakistan
  • سبتمبر 2002

Specialties & Skills

Execution Skills
Project Work
Construction Methods
Planning
Management Planning
CIRCUITS
NETWORK DESIGN
OPTIMIZATION
SCHEMATIC
SUBSTATION
TECHNICAL LEADERSHIP
MICROSOFT OFFICE

اللغات

الأوردو
متمرّس
العربية
مبتدئ
الانجليزية
متمرّس