Site Electrical Engineer
Alfanar Construction Company
مجموع سنوات الخبرة :10 years, 9 أشهر
Worked on the installation of smart energy meter Project in saudi arabia
Working on Construction of Double circuit 380KV 152Km OHTL from Rabigh IPP2 to Jeddah BSP
• Inspect all Tower materials as per P.O. and client specifications, delivery notes & packing list & approved submittals.
• To ensure that the work is carried out as per approved IFC drawings, standards & specifications.
• Maintain quality records such as log book of the work performed, QA/QC weekly report, Internal inspection report, Non-conformance report (NCR),
• Review Master Time Schedule of projects and accordingly prepare inspection and test plans in coordination with client, consultant and vendor.
• Implementation of Quality Management System ISO 9001:2015.
• To ensure that all testing and measuring instruments are calibrated & maintain calibration log.
• Conduct Quality Audits of different projects & report any non-conformity to Project Managers & QA/AC Managers.
• Liaises with design engineer over any reported technical issues which require their input.
• Site inspection of assembly & erection 380KV Towers, Tower Tightening, Insulator Assembly & Hoisting, AAAC conductor pulling, sagging & spacer fixing, OPGW pulling sagging & vibration damper fixing, OPGW joint box fixing & witnessing of Pre & Post installation tests for OPGW.
• Coordinates with Execution & client for closing of punch list and witnessing of Testing & commissioning.
Worked with Alfanar Construction Company as a QA/QC on 132/13.8KV Substation along with 15km 132KV Transmission Line & 6Km 132KV Underground cable for Sulaiman Al Rajhi Colleges Bakeria Al Qassim from September, 2018 to Dec, 2018 (Project Cost = 164M SAR)
• Inspect all Substation & Tower materials as per P.O. and client specifications, delivery notes & packing list & approved submittals.
• To ensure that the work is carried out as per approved IFC drawings, standards & specifications.
• Maintain quality records such as log book of the work performed, QA/QC weekly report, Internal inspection report, Non-conformance report (NCR),
• Review Master Time Schedule of projects and accordingly prepare inspection and test plans in coordination with client, consultant and vendor.
• Implementation of Quality Management System ISO 9001:2015.
• To ensure that all testing and measuring instruments are calibrated & maintain calibration log.
• Conduct Quality Audits of different projects & report any non-conformity to Project Managers & QA/AC Managers.
• Liaises with design engineer over any reported technical issues which require their input.
• Site inspection assembly & erection 132KV Towers, Tower Tightening, Insulator Assembly & Hoisting, AAAC conductor pulling & sagging, OPGW pulling sagging & vibration damper fixing, OPGW joint box fixing, Pre & Post installation tests for OPGW.
• Site Inspections of 132KV & 13.8KV Power Transformers, 132KV GIS, 132KV & 13.8KV Protection Panels. 13.8KV Switchgear, 13.8KV Capacitor Banks, AC/DC Panels, LCC & Telecom Panels, cable trays installation, Laying & termination of control, power & optical fiber cables etc.
• Coordinates with Execution & client for closing of punch list and witnessing of Testing & commissioning.
Worked with Alfanar Construction Company as a QA/QC on 380/115/13.8KV DAMMAM North Substation in DAMMAM from March, 2018 to Aug, 2018 (Project Cost = 469M SAR)
• Inspect all Substation & Tower materials as per P.O. and client specifications, delivery notes & packing list & approved submittals.
• To ensure that the work is carried out as per approved IFC drawings, standards & specifications.
• Maintain quality records such as log book of the work performed, QA/QC weekly report, Internal inspection report, Non-conformance report (NCR),
• Review Master Time Schedule of projects and accordingly prepare inspection and test plans in coordination with client, consultant and vendor.
• Implementation of Quality Management System ISO 9001:2015.
• To ensure that all testing and measuring instruments are calibrated & maintain calibration log.
• Conduct Quality Audits of different projects & report any non-conformity to Project Managers & QA/AC Managers.
• Liaises with design engineer over any reported technical issues which require their input.
• Site inspection assembly & erection 380KV Towers, Tower Tightening, Insulator Assembly & Hoisting, AAAC conductor pulling, sagging & spacer fixing, OPGW pulling sagging & vibration damper fixing, OPGW joint box fixing, Pre & post installation tests of OPGW.
• Site Inspections of 380KV, 115KV & 13.8KV Power Transformers, 380KV, 115KV GIS, 380KV, 115KV & 13.8KV Protection Panels. 13.8KV Switchgear, 13.8KV Capacitor Banks, AC/DC Panels, LCC & Telecom Panels, cable trays installation, Laying & termination of control, power & optical fiber cables etc.
• Coordinates with Execution & client for closing of punch list and witnessing of Testing & commissioning.
Working on a 132/13.8KV Substation in Al Qassim Buraidah
• Inspect all Substation materials as per P.O. and client specifications, delivery notes & packing list & approved submittals.
• To ensure that the work is carried out as per approved IFC drawings, standards & specifications.
• Maintain quality records such as log book of the work performed, QA/QC weekly report, Internal inspection report, Non-conformance report (NCR),
• Review Master Time Schedule of projects and accordingly prepare inspection and test plans in coordination with client, consultant and vendor.
• Implementation of Quality Management System ISO 9001:2015.
• To ensure that all testing and measuring instruments are calibrated & maintain calibration log.
• Conduct Quality Audits of different projects & report any non-conformity to Project Managers & QA/AC Managers.
• Liaises with design engineer over any reported technical issues which require their input.
• Site Inspections of 132KV & 13.8KV Power Transformers, 132KV GIS, 132KV & 13.8KV Protection Panels. 13.8KV Switchgear, 13.8KV Capacitor Banks, AC/DC Panels, LCC & Telecom Panels, cable trays installation, Laying & termination of control, power & optical fiber cables etc.
• Coordinates with Execution & client for closing of punch list and witnessing of Testing & commissioning.
Worked on a 380KV 150Km Overhead Transmission line from Rabigh to Al Adel.
• Inspect all Tower materials as per P.O. and client specifications, delivery notes & packing list & approved submittals.
• To ensure that the work is carried out as per approved IFC drawings, standards & specifications.
• Maintain quality records such as log book of the work performed, QA/QC weekly report, Internal inspection report, Non-conformance report (NCR),
• Review Master Time Schedule of projects and accordingly prepare inspection and test plans in coordination with client, consultant and vendor.
• Implementation of Quality Management System ISO 9001:2015.
• To ensure that all testing and measuring instruments are calibrated & maintain calibration log.
• Conduct Quality Audits of different projects & report any non-conformity to Project Managers & QA/AC Managers.
• Liaises with design engineer over any reported technical issues which require their input.
• Site inspection of assembly & erection 380KV Towers, Tower Tightening, Insulator Assembly & Hoisting, AAAC conductor pulling, sagging & spacer fixing, OPGW pulling sagging & vibration damper fixing, OPGW joint box fixing & witnessing of Pre & Post installation tests for OPGW.
• Coordinates with Execution & client for closing of punch list and witnessing of Testing & commissioning.
Preparing Submittals for electrical materials which are to be used at site for clients according to the requirements specified in Technical Specification.
Provides Engineering management with program status updates on a regular basis
Supervises the field electrical systems and facilities of project, including its organization, planning and scheduling in order to complete the work on time, within budget and to the quality specified.
Ensure successful execution and supervision of on-site activities accordance with approved plans, drawings and specification.
Tracking construction deficiencies and ensuring timely corrective action.
Following the design during construction and making the decisions for change in design as per site.
Preparing Bill of quantity for all electrical materials to be used at site.
Monitoring and supervising for the quality control at site.
Attending weekly coordination meeting with Clients i.e. USACE and providing meeting minutes to Head office.
• Regular monitoring visits in accordance with the agreed QA plan.
• Ensure generation of bi-weekly & monthly reports.
• Assistance to Field Manager M & E with various M & E tasks.
• Coordination with stakeholder’s i-e FWO, WAPDA & NESPAK..
• Monitoring of excavation of HT/LT pole foundations, Erection of HT/LT poles, monitoring the stringing of HT/LT conductor & Installation of 11KV & 33KV transformers.
• Monitoring of excavation of 132KV ZM-1, ZM-30 & ZM-60 towers foundations, checking of earth resistance of towers, Monitoring of erection of superstructure and stringing of conductor.
• Monitoring of civil works, inspection, placement and power cabling of 132KV Power transformer, Lightening arrestors, Circuit breakers, Bus disconnectors, Line disconnectors, Potential transformers, Current transformers, Surge arrestor & Control house building.
• Ensure collection of identified material samples for further testing/processing.
• Conduct simple field test and prepare test reports for review by the M & E Field Manager and TL.
• Ensure regular technical and field assessment reports which will provide the basis for various M & E actions.
• Material inspection of Conductors (LYNX, DOG, ANT, Aluminum conductor 600mm2), Earth wire 9mm, GSL wire 10mm, Control cables, XLPE, HT/LT poles, 132KV towers, Pin & Disc insulators, Nuts Bolts all types at manufacturer premises before dispatch to site.
Responsibilities:
• Generate reports for the project.
• Review of designs of the distribution sub-stations, 132KV transmission line and 132KV Grid Station.
• Coordination with senior sector Specialist and the head office.
• Verify the tests conducted at manufacture premises.
• Review/Checking of PC-1’s.
• Preparation of monthly M&E plans.
Taught the subject of Electronics drawing, Motors & Generators, Electronic measuring instruments
• Troubleshooting of different microwave links (NEC, Minilink, and Ericson).
• Handled different rectifiers (Eltec, Delta and Emerson).
• Handled different BSS & transmission alarms.
• Corrective maintenance of the site.
• Preventive maintenance of the site.
• Involves in office management activities.
Currently studying Master of Business Administration from Virtual University of Pakistan.
This course was about telecom systems and mobile repairing.
This course was about optical fiber cable jointing splicing & transmission system
I graduated in the field of Electrical Engineering from NWFP UNIVERSITY OF ENGINEERING & TECHNOLOGY PESHAWAR in the year 2008. I have multi experience in different field of Engineering from Teaching to Telecom, Transmission Line, Substation, Quality Assurance. Currently I am seeking for a career that can further enhance my skills.