Total des années d'expérience: 18 Années, 8 Mois
juillet 2005
A À présent
QA/QC Engineer (Mechanical & Piping, Welding)
à Descon Engineering Limited
Lieu :
Pakistan - Lahore
I am Mechanical Engineer working as a QA/QC Engineer in DESCON Engineering since more then eight years. I have API 510 certification ( Certified Pressure vessel Inspector ). I have also Welding Inspector Level-1 & NDT Level 2 in VT, DPT, MPI, RT. I have strong communication & management skills. I have worked in many different projects .I have worked in Mechanical Static & rotating Equipment’s, Piping, Welding, NDT and I also have worked in many oil & gas shut downs as an inspection Engineer. I have rich professional experience as I have worked in TAKREER expansion project Abu dhabi, TAKREER hydrocracker & hydroskimmer Abu dhabi, Fertilizer Plant ( Fertil ) Ruwais Abu dhabi, Engro fertilizer plant Envin 1.3 Pakistan, DAP Revamping FFBL Karachi Pakistan, DG Cement CO.Kalar Kahar Chakwal Pakistan, Pakistan Refinery, Fouji Fertilizer Pakistan.
février 2012
A À présent
QA/QC Engineer (Mechanical & Piping, Welding)
à TAKREER Oil Refinery
Lieu :
Émirats Arabes Unis - Abu Dhabi
• Project: Takreer Refinery Expansion Project Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: Dec: 2012 to Till (Project)
• Project: Amonia Flare Expansion Project Fertilizer Plant Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding, Piping)
• Duration: Oct: 2012 to Nov: 2012 (Project)
• Project: Takreer Refinery Expansion Project Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: 20, April: 2012 to Aug: 2012 (Project)
• Project: Engro Chemical Expansion Plant Enven 1.3 Daharki Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: 01, Apr: 2008 to 15, Nov: 2010.
• Project: DAP Revamping FFBL Karachi Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding, Piping)
• Duration: Sep: 2007 to March 2008.
• Project: DG Cement CO.Kalar Kahar Chakwal Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: July: 2005 to Aug: 2007.
SHUTDOWN EXPERIENCE
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: Dec: 2012 to Till (Project)
• Project: Amonia Flare Expansion Project Fertilizer Plant Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding, Piping)
• Duration: Oct: 2012 to Nov: 2012 (Project)
• Project: Takreer Refinery Expansion Project Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: 20, April: 2012 to Aug: 2012 (Project)
• Project: Engro Chemical Expansion Plant Enven 1.3 Daharki Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: 01, Apr: 2008 to 15, Nov: 2010.
• Project: DAP Revamping FFBL Karachi Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding, Piping)
• Duration: Sep: 2007 to March 2008.
• Project: DG Cement CO.Kalar Kahar Chakwal Pakistan.
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: July: 2005 to Aug: 2007.
SHUTDOWN EXPERIENCE
janvier 2012
A novembre 2013
QA/QC Engineer
à FOUJI FERTILIZER BIN QASIM KARACHI PAKISTAN
Lieu :
Pakistan - Karachi
FOUJI FERTILIZER BIN QASIM KARACHI PAKISTAN.
From 1 Jan 2012 to 1 Feb 2012 (TAR 2012)
PAKISTAN REFINERY KARACHI PAKISTAN.
From 1 Jan 2012 to 1 Feb 2012 (TAR 2012)
PAKISTAN REFINERY KARACHI PAKISTAN.
décembre 2012
A décembre 2012
QA/QC Inspector (Mechanical & Welding & Piping)
à Descon Engineering L.L.C
Lieu :
Pakistan - Karachi
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: Dec: 2012 to Till (Project)
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: Dec: 2012 to Till (Project)
octobre 2012
A novembre 2012
QA/QC Inspector (Mechanical & Welding, Piping)
à Descon Engineering L.L.C
Lieu :
Émirats Arabes Unis
• Project: Amonia Flare Expansion Project Fertilizer Plant Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding, Piping)
• Duration: Oct: 2012 to Nov: 2012 (Project)
• Project: Takreer Refinery Expansion Project Ruwais Abu Dhabi U.A.E.
• Organization: Descon Engineering L.L.C U.A.E
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding, Piping)
• Duration: Oct: 2012 to Nov: 2012 (Project)
• Project: Takreer Refinery Expansion Project Ruwais Abu Dhabi U.A.E.
avril 2012
A août 2012
QA/QC Inspector (Mechanical & Welding & Piping)
à Descon Engineering L.L.C
Lieu :
Émirats Arabes Unis - Abu Dhabi
• Organization: Descon Engineering L.L.C U.A.E
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: 20, April: 2012 to Aug: 2012 (Project)
• Project: Engro Chemical Expansion Plant Enven 1.3 Daharki Pakistan.
• Client: Daewoo E & C
• Designation: QA/QC Engineer
• Position: QA/QC Inspector (Welding & Piping)
• Duration: 20, April: 2012 to Aug: 2012 (Project)
• Project: Engro Chemical Expansion Plant Enven 1.3 Daharki Pakistan.
février 2012
A mars 2012
QA/QC Inspection Engineer
à TAKREER Oil Refinery
Lieu :
Émirats Arabes Unis
Worked as a QA/QC Inspection Engineer,
TAKREER Oil Refinery, Abu Dhabi (Hydro skimmer hydrocracker)
From 04, Feb 2012 to 19, March, 2012.
TAKREER Oil Refinery, Abu Dhabi (Hydro skimmer hydrocracker)
From 04, Feb 2012 to 19, March, 2012.
juillet 2005
A janvier 2012
QA/QC Engineer
à Descon Engineering ltd
Lieu :
Pakistan - Lahore
I am Mechanical Engineer working as a QA/QC Engineer in DESCON since more then eight years. I have API 510 certification ( Certified Pressure vessel Inspector ). I have also Welding Inspector Level-1 & NDT Level 2 in VT, DPT, MPI, RT. I have strong communication & management skills. I have worked in many different projects .I have worked in Mechanical Piping, Welding, NDT and Equipments. I also have worked in many oil & gas shut downs as an inspection Engineer. I have rich professional experience as I have worked in TAKREER expansion project Abu dhabi, TAKREER hydrocracker & hydroskimmer Abu dhabi, Fertilizer Plant Ruwais Abu dhabi, Engro fertilizer plant Envin 1.3 Pakistan, DAP Revamping FFBL Karachi Pakistan, DG Cement CO.Kalar Kahar Chakwal Pakistan, Pakistan Refinery, Fouji Fertilizer Pakistan.
The detail of my qualification, skills & experience is enclosed in this attachment
Sincerely,
Muhammad Waseem Ahmad
API 510 Certified pressure vessel inspector.( certificate number-48985 )
The detail of my qualification, skills & experience is enclosed in this attachment
Sincerely,
Muhammad Waseem Ahmad
API 510 Certified pressure vessel inspector.( certificate number-48985 )
avril 2011
A mai 2011
QA/QC Engineer
à FOUJI FERTILIZER BIN QASIM KARACHI PAKISTAN
Lieu :
Pakistan - Karachi
FROM April 2011 to May 2011 (TAR 2011)
FOUJI FERTILIZER BIN QASIM KARACHI PAKISTAN.
From 1 Jan 2011 to 1 Feb 2011 (TAR 2011)
.
FOUJI FERTILIZER BIN QASIM KARACHI PAKISTAN.
From 1 Jan 2011 to 1 Feb 2011 (TAR 2011)
.
avril 2008
A novembre 2010
QA/QC Inspector (Welding & Piping)
à Descon Engineering Limited
Lieu :
Pakistan - Karachi
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: 01, Apr: 2008 to 15, Nov: 2010.
• Project: DAP Revamping FFBL Karachi Pakistan.
• Designation: QA/QC Inspector (Welding & Piping)
• Duration: 01, Apr: 2008 to 15, Nov: 2010.
• Project: DAP Revamping FFBL Karachi Pakistan.
septembre 2007
A mars 2008
QA/QC Inspector (Welding, Piping)
à Descon Engineering Limited
Lieu :
Pakistan - Karachi
• Organization: Descon Engineering Limited.
• Designation: QA/QC Inspector (Welding, Piping)
• Duration: Sep: 2007 to March 2008.
• Designation: QA/QC Inspector (Welding, Piping)
• Duration: Sep: 2007 to March 2008.