Muhammad Salah, Sr. Project Manager (Sr. Risk / Sr. Construction /Sr. Logistics

Muhammad Salah

Sr. Project Manager (Sr. Risk / Sr. Construction /Sr. Logistics

Faithfull and Gould

Location
United Arab Emirates - Al Ain
Education
Bachelor's degree, Civil Engineering
Experience
19 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :19 years, 0 Months

Sr. Project Manager (Sr. Risk / Sr. Construction /Sr. Logistics at Faithfull and Gould
  • United Arab Emirates - Abu Dhabi
  • April 2018 to July 2020

Sr. Risk Manager : National Housing Program (NHP)
Community Development Program of multiple large-scale township projects (circa 395, 000 housing units with infrastructure and social infrastructure support within 6 townships Riyadh, Jeddah, Dammam, Mecca Assir and Al Kharj, ) across the Kingdom of Saudi Arabia has been established by CDC as part of The Public Investment Fund (PIF).
As a Sr. Risk Manager for NHP program and F+G business, leading the risk and crises management process.
• Reviewed and updated the developer risk management documents of policy and procedure.
• Generated sets strategic risk management vision and updated The Program risk management plan(PMP) from identification to close-out per ISO31000 and PMI for Client review and implementation.
• Lead risk management process and conducted audit process along with KRIs for risk performance
• Established and enhanced best practice tools and techniques to properly and jointly identified the risks, assess the risks ( quantitative and qualitative), proposed best action plan, monitored and control the risk by assigning risk owner to close the risk by due time.
• Updated Enterprise Risk Management procedures of F+G business and managed F+G risk plan using F+G’s Business Risk Management Framework and Risk procedures
• Generated and updated overall F+G business Master Risk Register and NHP projects risk registers with issues log and lesson leaned for weekly and monthly reports .
• Identified all Risk and opportunities to Programme objectives along with the Projects with causes and consequences,
• Assess the qualitative and quantitative with level of uncertainty to very high and high the risks ( cost/time).
• Propose with the project team best risk management strategy along with risk action plan to implement by due date.
• Communicated and coordinated with risk owners to implement the risk action plan by due time.
• Evaluate the effective risk management strategies ( Avoidance, Reduce, transfer, acceptance) to control and close out the risks along with recovery plan.
• Enhanced or shared with the program team the opportunities to the programme objectives.
• Chairing all Bi-weekly risk and crises meetings with all the department to identify new risks, assess, mitigate, control, monitor and close-out the risk by due time.
• Prepared risk and crises analysis reports for top risks (very high and high risks) to evaluate the quantitative risk time/cost along using primavera risk analysis software along with level of confident per Monte Carlo analysis to meet the programme planned time/cost and Initiate contingency allowance.
• Ensured the Consultants (/ PMC /CS) scope of work include risk managements process and direct the consultants to comply and implement the same.
• Conducted risk awareness and session as training of risk process for all project team reference and action .
• Established fire warded and Crises management team and generated site office evacuation and security plans.

Project Manager/ Resident Engineer at AECOM Mideast (PMC/CS)
  • United Arab Emirates - Abu Dhabi
  • January 2017 to March 2018

Yas South Development Project Miral Management Asset
Sky Venture and 5D cinema commercial building projects are entertainment projects to development Ferrari and water World Worlds the Projects includes all services and neighbourhoods. Project Manager/ Resident Engineer lead the construction supervision team teams to ensure the contractor engineering submittals and works at site as per the project quality as well as ensure project completion is met per the program and within the budget.
Handling multi tasks and positions with responsibilities:
•Plan, organize, and direct activities concerned with the design, procurement, construction and handover team
•Interpret and explain plans and contract terms to staff, representing the owner and developer.
•Communicate with the Client’s representatives continuously regarding project progress and areas of concerns.
•Oversee all aspects of the day-to-day management of the construction project; monitor and coordinate work performed by architectural, engineering, and construction departments.
•Ensure the project is scheduled in logical steps and time is correctly budgeted to meet milestones.
•Coordinate with the site supervision team to ensure activities projects were delivered as planned in terms of quality.
•Chair progress coordination meetings and issue meetings minutes for parties’ action accordingly
•Conduct technical coordination’s meetings with the contractor’s and consultant technical team to deliver and expedite technical approval.
•Supervised the sequencing of work for the entire project and avoid access and obstructions issues due to multi contractors works...
•Assisted in preparing contracts and negotiating revisions, changes, and additions to contractual agreements.
•Ensured timely allocation and requisitioning of supplies and materials to complete construction projects.
•Liaison with the Employer, Project Stakeholders and Statutory Authorities.
•Evaluated construction methods and determine cost-effectiveness of plans.
•Managed the construction supervision team to the review of the Engineering submittal per the technical specs.
•Interface management and coordination with stockholders as per the project and Client requirement.
•Lead the logistics of contractor & consultant along with interface management with other buildings and utilities under construction.
•Verify HSE and Security requirements are implemented in all stages of construction process.

Project Manager at Kellogg Brown and Root EMEA(KBR)-PMC
  • United Arab Emirates - Abu Dhabi
  • April 2015 to December 2016

Yas South Development Project Miral Management Asset
Developments for Southern Part of Yas Island, a vibrant mixed-use community, residential neighbourhoods, new location of the Media Zone Authority office campus, production studios, the new Yas Arena, and a unique mix of retail and leisure destinations along nearly 3km of an active waterfront promenade. Project Manager led all awarded projects for infrastructure and Public realm projects. Logistics and interface Manager of entire Yas South Development along with obtaining local authority’s necessary approvals, NOC and permits. Additional duties and achievements included:
•Participated in the planning and formulation of design alternatives and solutions for the construction project
•Managed the Consultant & The Contractor and ensure the project operations comply with design specifications, contract specifications and client requirements.
•Coordination of work sequencing to expedite project delivery and to minimize disruption of ongoing operations.
•Inspected, identified non-compliances/ acceptance of completed projects, ensuring conformance with institutional standards, building and life safety codes.
•Evaluated the Consultants and The Contractors technical proposals and issue final recommendation for The Client.
•Generated sequencing of work for the entire development to avoid access and obstructions issues
•Coordinated with the project team to prepare tender document per development programme & budget.
•Liaised with local authorities and ensure the necessary approvals, NOC, permits are obtained from local authorities.
•Monitored and evaluate the projects progress in terms of document submittals and physical work at jobsite
•Conducted technical and progress coordination’s meetings to present the progress and resolve the problems resolve and issue meetings munities for stakeholders’ action accordingly.
•Managed all aspects of transportation, road closures, diversion routes and temporary traffic orders, management, waste
•Established Construction Plan, Logistics & Interface Plan, Traffic management & Security Plan and End User Strategy Plan.
•Managed the logistics of contractor & consultant and led the interface management with other buildings and utilities under construction .
•Reviewed and evaluated The Consultant’s and Contractors execution plans, method statement and progress reports.
•Participated in preparation progress weekly and monthly reports for the Client reference as well review the stakeholders report.
•Oversees the Supervision Consultants in assisting the Contractor to find alternative solutions to problematic site and NOC/ Permits issues.
•Ensured HSE and Security requirements are properly considered and included in all stages Logistics & Construction process.

Project Control Manager at LANE Mideast Contracting
  • United Arab Emirates - Abu Dhabi
  • March 2014 to March 2015

South Airfield Development & Rehabilitation Abu Dhabi International Airport Project
Developments are made for Southern Runway and the new Midfield Airside Road Tunnel at Abu Dhabi Airport. Project manager direct the project management team to deliver the scope as per the development programme and lead project control team to report and analysis records in terms of progress and cost. My duties included but not limited to the following:
•Manage the performance and delivery criteria, ensuring that client requirements are being met; review project specifications, and coordinates procurement, as appropriate.
•Generate sequencing & flow of work along with the document submittals, necessary approval, interface with authorities and other parties
•Identify all required permits and NOC with the ADAC authority and ensure all are addressed in the baseline programme
•Guide the construction team to achieve the production and submit recovery plan as needed.
•Manage project controls and planning team to understand and follows the Project Management Processes and Procedures.
•Always think ahead, identify new opportunities and create new and innovative approaches to work-related issues.
•Strong Management of large teams and communication.
•Coordinate with all other contractors working in some areas for logistics requirement and NOC
•Lead project control team to submit baseline programme & update the programme as required
•Identify the risks with Project Management Team for early warnings for any potential delays or deviations from the approved plan.
•Review and endorse for approval the progress and schedules for all phases of the project lifecycle.
•Prepare and submit the Project Weekly & Monthly Reports.
•Ensure accurate cost and schedule data is provided to Economics department
•Coordinate and endorsed Project KPIs and ensured that these KPIs are met in a timely manner.
•Monitoring Quality, Health & Safety. Environmental and Security
•Lead the cost control team to prepare monthly payment in line with progress of works.

Project Manager/ Risk / Construction/ Logistics at Fluor Mideast Ltd. (PMC)
  • United Arab Emirates - Abu Dhabi
  • September 2008 to February 2014

Al Falah Community Development Project ALDAR Properties
Al Falah community is mixed -use a master planned development constructed 4, 857 villas and all supporting infrastructure with neighbourhood and village commercial shopping centres from paper concept to handover using multiple consultants and construction contractors. Sr. Project Manager lead early and enabling work, soil investigation works, cavity remediation works, heavy dynamics works, main point of coordination of both Building and Infrastructure Contractors work in the same area and at same time as well as participate in generation master plan and projects detail design for approval of UPC and local authorities. Managed the project logistics & interface and risk. Manager lead all Consultants and Contractors of buildings and infrastructure aspects of transportation, traffic management, access road, security control, warehousing, waste management to deliver the projects as per development . Additional duties and achievements include.

•Establish with project team the development briefs, including the outline concept design and overall master plan
•Liaise with local authorities and ensure the necessary approvals, NOC, permits are obtained from local authorities
•Provide technical support to Project Management team for on-time successful completion of the project
•Participate to obtain the approval of Abu Dhabi authority and others UPC/DOT/ADM/Civil Defence DWEA/ADDC/
•Generate the flow and sequencing of works of the development to overcome the interface and logistics issues.
•Monitor progress of work and recommend to the party’s best approach to recover the actual and potential delay.
•Review all contractor’s pre-construction plans, method statement, material submittals, and program of work
•Coordinate with Project Team for smooth handover of the villas and infrastructure to stockholders.
•Manage the development’s risks, logistics, traffic and implementation of projects management strategies / plans
•Provide technical and management overview, support and feedback on all construction activities to best interest of the client
•Lead all soil investigation works, enabling works, cavity remediation works and deliver as per ADM geotechnical section requirement
•Supervise building and infrastructure consultants and contractors working in same place and at same time for all project phases
•Monitor the quality of work with approved technical documentation and project execution plan
•Demonstrates a determination, desire to succeed and a wish to progress and develop within a commercial role.
•Main point of contact to obtain NOC and permits from authorities and the Client for the development logistics requirement .
•Establish Master Logistics plan and traffic layouts ensure site access & security, temporary site facilities, waste management, traffic flow.

Project Manager at Morganti Group (PMC)
  • United Arab Emirates - Abu Dhabi
  • September 2005 to August 2008

, Residential High-Rise Building (34 Floors), Dubai healthcare city.
Quality Control Assurance Manager responsible for planning, directing, coordinating of all aspect of quality assurance in line with project’s requirement of two residential high-rise buildings (34 Floors) for healthcare team of Dubai healthcare city. Participate in value engineering exercises and workshop to meet the project budget with the Client & The Contractor. Prepared project Quality Assurance plan and submitted for the Client Approval. Managed all Quality Control/Assurance required for the project and conducted Technical coordination meetings to expedite approval process. Ensure the contractor’s quality of the work is in line with technical specification. Managed process of review and approval all prequalification, material submittals, shop drawings, method statements, and procedures submitted by contractors

•.Contract Manager / Commercial Manager, United Arab Emirates University (UAEU) Project, Al Ain Abu Dhabi.
The United Arab Emirates University Project constructed a female campus, a male campus, all supporting facilities and infrastructure from paper concept to handover using multiple construction contractors. Contract Commercial Manager responsible for managing the consultant and contractor contracts and claims. Commercial Manager responsible for maintaining the project budget and making recommendations to the Client for best address any time and / or cost impacts. Explored and analysed value engineering options as needed. Coordinated with the Project director during tender preparation for the provisional sum items, opening and awarding of tenders. Evaluated the Contractors Technical and Commercial proposal and submitted technical and commercial recommendation. Claims coordinator to resolve the additional cost and time issues. Identify and track risks to the overall program time /cost and developed appropriate mitigation strategies.
•Planning Engineer / Warranty Manager, Design-Build Relocatable Buildings (RLB) Project
The Design-Build Relocatable Buildings Project expanded six existing U.S. military bases and constructed one completely new U.S. military base to provide support for military forces. Planning Engineer responsible for the development and maintenance of the overall project schedule. Updated P3 programme of work and submit weekly and monthly reports. Identified the risks to the programme and developed mitigation strategies for the team’s action Responsible for preparing and evaluating all time impact justifications for claims or changes, develop schedule impact. Warranty Manager responsible for 89 subcontractors and suppliers after project completion due to project warranty period for one year. Prepared and updated warranty plan managed the warranty team and rectified any defects works within specified contractual time. Prepared warranty monthly report and update warranty tracking list.
Experience with Arab Contractors (Osman Ahmad Osman) (Contractors)-Palestine (

Projects Manager at Sami Sleibi Est. & Brothers for Contracting
  • September 2000 to July 2002

Rehabilitation Infrastructure Works & New Buildings Project.
Project Manager responsible for the rehabilitation infrastructure Works & New Buildings Project. The Rehabilitation Infrastructure Works & New Buildings Project included the construction of the A1-Zawih primary, elementary and secondary schools with all supporting facilities (football field, parking, etc.), fourteen medical clinics, a handicap development centre and the rehabilitation of roads & landscaping for the City of Beit Sahor. Planned, controlled and prepared program of work, preconstruction submittals (list of materials, staffing, equipment, and schedule), managed the changes and claim
Experience with

Structural Designer at Anistas Ltd. International Technical Consulting
  • July 1994 to August 1996

Structural Designer and Site Engineer for construction main head office building for Philips & Nestele and a branch office for the Arab Bank. Responsibilities included structural designer and site engineer for the preparation and submittal of reinforced concrete designs. Prepared and submitted structural concrete reinforcement design and structural drawings as well as supervised the quality of work on site of the projects.

Education

Bachelor's degree, Civil Engineering
  • at Birzeit University
  • May 2020

.,

High school or equivalent, Education And Professional Studies
  • at Risk Management Process - Fluor University
  • January 2000

AutoCAD®

Specialties & Skills

Contract Management
Logistics Management
Construction Management
Project Management
Risk Analysis
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT OFFICE
MICROSOFT WORKS
NETWORKING
PROGRESS
QUALITY
QUALITY CONTROL
SPECIFICATION

Languages

Arabic
Expert
English
Expert

Hobbies

  • Playing Football