Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Muhammad Asif  Adnan, QA QC Engineer Mechanical

Muhammad Asif Adnan

QA QC Engineer Mechanical·PARSONS CORPORATION.

Saudi Arabia

Bachelor's degree, Mechanical

Work experience

Total years of experience: 15 years, 1 months

QA QC Engineer Mechanical

July 2023 - Present

PARSONS CORPORATION.

Tabouk, Saudi Arabia

July 2023 - Present

 Testing & Commissioning of fire pumps like Jockey, Electric & Diesel pumps.
 Set and test the pumps sequences of operations (Jockey Electric Diesel).
 Set and test the pressure in pressure switch through sensing line for auto Pump operation cut IN/OFF.
 Set and test the pump RPM.
 To test the pump performance through flow meter reading by various GPM.
 To test the functionality of Alarm Check Valve with Water Alarm Gong and Pressure switch.
 Testing and Commissioning of fire suppression system FM200, NOVEC, Pre-Action System, Foam System.
 Testing and Commissioning (Functionality/Performance and Air Balancing) of FAHU, AHU, FCU.
 Testing and Commissiong (Stand-alone/Performance and Air Balancing) of Basement Air Condition and Mechanical Ventilation (ACMV) Fresh Air Fan, Exhaust Air Fan, Jet’s Fan.
 Testing and Commissioning (Performance & Air Balancing) of Staircase case pressurization Fans and Fireman’s Lift Lobby.
 Testing and Commissioning of DX Units.
 Basement Smoke test simulation test.
 Testing and Commissioning (Performance test and Water Balancing) of Chilled water Pump.
 Testing and Commissiong of Plate Heat Exchanger to check the Primary and Secondary line temperature and Pressure drop.
 Testing and Commissiong of inhibitor Dosing pump and tank, M-402 Non-Oxidizing Liquid Biocide & M 318 Corrosion inhibitor Sodium Nitrite with corrosion coupon racks and Pressurization Unit.
 Water Balancing and PICV setting of FCU, FAHU, AHU.
 To make a plain & Dynamic flushing.
 To add a chemical flushing after meeting the parameters (I.e. pH, Conductivity & Iron value).
 Addition of temporary passivation chemical.
 To make a dynamic after passivation.
 To make a backflushing of FCU, AHU & FAHU once iron value meets as per specification.
 To make a final flushing & removal of chemical.
 Addition of corrosion inhibitor & Biocide.
 To disposal of wastewater.

Company industry:
Construction & Building
Job role:
Consulting

Mechanical Qc Engineer

February 2020 - July 2023

SENDAN INTERNATIONAL CO.

Jubail, Saudi Arabia

February 2020 - July 2023

 To manage the fabrication groups and control the progress.
 To prepare material lists according to drawings and issuing the material from the warehouse.
 Spool marking on isometric drawings.
 Beveling (Single/Double), grinding, fit-up the joints according to approved procedure.
 Spools dimension verification before start welding & arranging the tools and consumable material.
 To monitor and control piping fabrication following drawings & specifications, to verify spool dimensions before & after welding.
 To Identify the spool with weld no’s, spool no’s as per drawings.
 To arrange the fabrication according to the materials group (CS, SS, Duplex, and Alloy Steel).
 To monitor the fabrication, erection activities and meet the schedule.
 To control welding as per approved welding procedures & quality control inspection plan.
 To complete the lines, installation of valves and connect with equipment.
 Prepare the punch list pre-test & post-test and verify the rectifications.
 Material traceability by color-coding (fitting, pipe & consumable material).
 Preparation for hydro testing, leak testing & pneumatic testing U/G & A/G piping.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Mechanical Engineer

February 2017 - December 2019

Timeline Consultants

Lahore, Pakistan

February 2017 - December 2019

Project Nishat Emporium Mall
Site Johar Town Lahore
Client Nishat Group
Contractor Timeline Consultants
Duties and Responsibilities
 Ericson of Four Boilers and Its Utilities including Piping.
 Installation Inspections MIR & RFWITs supervision & witness at the site.
 Ensure the Mechanical work has Complied with specifications standards according to drawings.
 Coordinates with the client representatives on matters involving quality assurance and control activities.
 Quantification and inspection Contractors Bill according to with as per build Drawings.
 Compiling measurements, handing overs, RFWIT’s & MIR with their supportive documents, Quantification for
IPC & IPN.
 Responsible for creating & review the Plot Plan for rotary & static Equipment Layout.
 Review the Piping Layout, isometrics & MTO, 3D Modeling, Nozzle orientation, Platform orientation, Section
& Details, Piping Stress and Piping Support, Isometrics & MTO.
 Piping material, fitting, valves BOQ preparation.
 Check and review vendor documents.
 Drafting Piping Material specifications, datasheets, and drawings.
 Preparing and issuing Piping Material requisitions for bid and procurement.
 Preparing Technical Bid Comparison & evaluation.
 Following the piping material requisition package though the life of the project up to close of the purchase order.
 Preparing piping material calculations such as wall thickness, area reinforcement as per ASME B 31.3.
 Preparing and planning piping material work on a project.
 Interacting with vendors, site, fabrication yard, and the client to sort out queries related to piping materials.
 Mechanical completion, pre-commissioning, testing, handed over the project.

Company industry:
Construction & Building
Job role:
Mechanical Engineering

Engineer

November 2013 - November 2016

Control Contracting & Trading Co

Abu Dhabi, United Arab Emirates

November 2013 - November 2016

Project Jopetwill Company
Site P-349 (Yard)
Client Jopetwill Company
Contractor CCTC
2nd
Project EPC WORKS FOR ZK FIELD
Site P-343 (Yard)
Client ADMA
Contractor CCTC
3rd Project UAD SURFACE FACILITIES FOR ESP, PH-I
Site P-331 ZADCO (OFFSHORE)
Client ADMA
Sub-Contractors CCTC
4th Project SEP-550 JACK UP BARGE
Site P-333 NPCC
Client NPCC & ABS
Sub-Contractors CCTC
Duties and Responsibilities
 Continuous use of Material Specifications for finalizing Line Routing & Layout.
 Supervision of fabrication, installation & execution work activates of Steel Structure.
 Supervision of fabrication and erection of piping for chilled water, seawater and firefighting system.
 Supervision of layout, marking, cutting, fabrication and erection activities for plate and structural work.
 Responsible to manage the manpower and machinery properly.
 To monitor and control piping fabrication following drawings & specifications, to verify spool dimensions before
& after welding.
 Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.
 Responsible for Piping erection and pipe support installation following schedule, Procedures, Specifications,
Priorities, and Availability of Construction Drawings.
 Handling all piping technical queries and investigating all field pipe work-related problems, including the
drawing of field sketches when necessary.
 Spools dimension verification before start welding.
 Raising MTO(s) for all materials required to additional materials for hydro tests etc.
 Responsible for welding activities such as SMAW, GTAW (TIG), SAW Welding Processes.
 Coordination for the NDT of Welding Joint (RT, DPT, and MPI) & keep records of the Test Report.
 Responsible for material issuance, handing & consumables.
 Responsible to clear the punch list raised by the client.
 Responsible to arrange the hydro testing for all piping systems.
 Enforce HSE requirements (PPE, PTW) and attend the weekly safety meeting.
 Reporting the daily progress to the construction manager.

Company industry:
Oil & Gas
Job role:
Engineering

Site Engineer

March 2012 - October 2013

Tobishima & Dai Nippon Corporation

Abbottabad, Pakistan

March 2012 - October 2013

Project Improvement of Water Supply System in Abbottabad
Site Raw water Transmission Main (RWTM).
Consultant NSC & JAPAN TECHNO (JAT)
Client PHED (KPK)
Sub-Contractors Zoom Engineers, IECS & PETROCON.
Duties and Responsibilities
 Supervision of installation & execution work of steel Pipeline of Treated Water Transmission Main 27KM.
 Responsible for WPS, WQT & PQR according to standards.
 Responsible for fabrication & installation of valve and fittings.
 Inspection of Fit-up, Welding of joint & Tie in Joints.
 Responsible for the NDT of Welding Joint (DPT, UT) & keep records of the Test Report.
 Inspection of Installation of Heat Shrink Sleeve & Cold Wrapping Tape.
 Inspection of External Coating by Holiday Test with D.C Pinhole detector.
 Responsible for the modification as per site & informs to Consultant.
 Planning of Weekly & monthly Schedule to achieve the Installation of Steel Pipe & Fittings.
 To attend the Weekly Meeting with Japanese & Managers of Sub-Contractor.
Worked with: Tobishima Corporation Japan

Company industry:
Construction & Building
Job role:
Civil Engineering

Site Supervisor

March 2011 - March 2012

Tobishima Corporation Japan

Faisalabad, Pakistan

March 2011 - March 2012

Project Improvement of Water Supply System in Faisalabad
Site Transmission Main, CM, JBC & Terminal Reservoir
Consultant JAPAN TECHNO (JAT)
Client WASA (Faisalabad)
Sub-Contractors EKL, PETROCON & KSB
Duties and Responsibilities
 Supervision of installation & execution work of steel Pipeline (DN-1000) of Transmission Main 26KM &
Terminal Reservoir.
 Responsible for WPS, WQT & PQR according to standards.
 Responsible for fabrication & installation of Header DN-1600 for TR.
 Responsible for the fabrication of elbows, saddle, dummy Steel Pipe (04” to 64”) in the Fabrication shop.
 Inspection of Fit-up, Welding of joint & Tie in Joints.
 Responsible for the NDT of Welding Joint (DPT, RT, and UT) & keep records of the Test Report.
 Inspection of Installation of Heat Shrink Sleeve & Cold Wrapping Tape.
 Inspection of External & Internal Holiday Test with D.C Pinhole detector.
 Supervise to Sub-Contractor & their progress work as per schedule.
 Responsible for the modification as per site & informs to Consultant.
 Responsible to submit RFI to the consultant for Inspection.
 To prepare a test pack for hydro testing of the pipeline.
 To Prepare Weekly & monthly Schedule to achieve the Installation of Steel Pipe & Fittings.
 Responsible for receiving of Steel Pipe & Fittings (DN-150 ~DN-1600) from Crescent Steel Mill & Kubota.
 To attend the Weekly Meeting with Japanese & Managers of Sub-Contractor.

Company industry:
Construction & Building
Job role:
Engineering

Education

Preston University Pakistan

October 2013

October 2013

Bachelor's degree, Mechanical

Pakistan

GPA (point): 3.7 out of 4

GPA (point): 3.7 out of 4

Punjab Board of Boiler Examining Poonch House

August 2009

August 2009

High school or equivalent, Mechanical

Pakistan

GPA (percentage): 68%

GPA (percentage): 68%

Skills

Planning

Expert

Commissioning

Expert

Plan Execution

Expert

HVAC

Expert

Operation

Expert

ADVERTISING

Expert

CUSTOMER RELATIONS

Expert

HVAC

Expert

PROGRESS

Expert

TELECOMMUNICATIONS

Expert

TROUBLESHOOTING

Expert

UTILITIES

Expert

LAYOUT DESIGN

Expert

MATERIALS MANAGEMENT

Expert

SUPERVISORY SKILLS

Expert

Planning

Expert

Commissioning

Expert

Plan Execution

Expert

Operation

Expert

Languages

English

Expert

Memberships

National Technology Council Pakistan

Higher Education Commission Pakistan

November 2020

Training and Certifications

Certifications
Process Piping Design, Layout & Stress Analysis
Apr 2016