Muhammad Musharraf Kaleem, Certification & Compliance Manager

Muhammad Musharraf Kaleem

Certification & Compliance Manager

Pak Suzuki Motor Company Ltd.

البلد
باكستان
التعليم
ماجستير, Marketing
الخبرات
16 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 2 أشهر

Certification & Compliance Manager في Pak Suzuki Motor Company Ltd.
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ أبريل 2021

1. Business risk management: coordination, meetings, compiling risks, and mitigating risks.
2. Compliance: meetings, coordination, assessment and complying local, regional, provincial, and national laws.
3. External and internal audits; coordination with external auditors, coordination with internal coordinators and HoDs, conducting audits and provision of related data to auditors.
4. IMS (integrated management system) Review; meetings and coordination for effective implementation of ISO 9000, 14000 and 18000. Data review and be prepared for audits company wide.
5. Conducting various coordination on behalf of MD and principal SMC (Suzuki Motor Corporation) with the rest of the company.

group internal auditor في Pak Suzuki Motor Company Ltd.
  • باكستان - كراتشي
  • نوفمبر 2017 إلى مارس 2021

1. To perform in defining a generalized methodology for auditing the technical / procurement / various projects.
2. To improve the overall auditing mechanism.
3. To identify new and hidden risks in all of company’s divisions / processes / functions.
4. Performing planned audit. (process flows, audit program, issue sheets, Test of controls, Test of details, draft report, final report and closing evidence.)

Assistant Manager في Pak Suzuki Motor Company Limited
  • باكستان - كراتشي
  • فبراير 2012 إلى نوفمبر 2017

Currently I am in the Production Engineering deptt. at Pak Suzuki Motor Company Ltd. where my prime responsibilities inculde:
1. Using Project Management tools for all the projects arising in the whole company.
2. Awarding contracts and getting projects done on time from contractors.
3. Preparing all relevant documentation including proposal, drawings, scope and benefits associated as well as budgeting all the costs of the project.
4. Allocating the projects cost from the Budgeted or revenue capital.
5. All relevant technical and project specific details are worked up to the best industry practices.

Industrial Engineer في Karachi Shipyard & Engineering Works
  • باكستان - كراتشي
  • ديسمبر 2009 إلى ديسمبر 2011

 Supervising and controlling production activities for 4th Frigate F22-P Warship for Pakistan Navy.
 Planning production activities.
 Ensuring Safety of teams at work.
 Proposal Management.
 Correcting and proposing design flaws.

Maintenance and planning Engineer في Al-Abid Silk Mills Pvt Ltd
  • باكستان - كراتشي
  • فبراير 2008 إلى نوفمبر 2009

 Planning the monthly / quarterly / yearly preventive maintenance schedules, optimizing opportunistic maintenance whenever possible.
 Implementing the QMS systems, Implementing and fulfilling the requirements of ISO 9000, 14000, IKEA IWAY, QWAY Standards.
 Responsible for ordering and receiving spares, ensuring their quantity and quality on arrival.
 Responsible for sending machine parts to be repaired at vendors.
 Deputed for special tasks related to Welding jobs, repairing of Grey Area Machines, Boiler and its accessory unit, ETP Plant, CRU Unit, Power House, and Surveillance and cross checking of facility at Stitching Units.
 Carried out the pending work and successfully completed the “Condensate Recovery Unit” Energy Conservation System, and saved Rs. 0.6 million / month of water, 28˚C - 56˚C of boiler inlet water.
 Headed a team of 30 Skilled Mechanical Workforce during the leave period of Sr. Mechanical Engineer (duration 1.5 months).
 Assisted Sr. Manager Engineering in the erection of SAGA PAD STEAM and LOOSE Boiler (capacity=22ton/hr).
 Being solely responsible for the LOOSE boiler’s commissioning period and coordinated with safety inspector, facilitated boiler engineer in carrying out inspections and closely monitor activities until 1st boiler firing.
 Maintaining the calibration data and conducts tests on regular basis coordinating with Electric / Mechanical departments.
 Checking the proper usage of PPE at workplace.
 Ensuring the correct filling of Job Cards & Handover Forms.
 Providing GM & Sr. Manager with daily machine downtimes.
 Evaluating the total daily / weekly / monthly and yearly downtime of the machines.
 Coordinating with the “ISO & Compliance department”.
 Conducting trainings to promote safety and cleanliness at workplace.
 Proper usage and training taken and taught others to use fire prevention

الخلفية التعليمية

ماجستير, Marketing
  • في Institute of Business Administration Karachi
  • ديسمبر 2016

MBA degree completed in December 2016, and will be willing to relocate internationally and nationally. I did case studies and research projects on various subjects such as: 1. Marketing Management 2. Management Theory & Practice 3. Research Methodology 4.Operations & tech Management 5. Strategic HRM 6. Organization Behavior 7. Project evaluation & Management 8. Brand Management 9. Advance corporate Finance 10. Accounting For Decision Making and as well as studied these subjects also: 11. Accounting 12. Managerial Communication 13. Stats & Math’s 14. Business Economics 15. Business Finance 16. Legal & Regulatory Environment 17. Global Economics and Political Environment 18. Corporate Governance 19. Corporate Strategy 20. Leadership in Organization

بكالوريوس, Industrial Engineering and Management
  • في Dawood College of Engg. & Tech. / Mehran University of Engineering and Technology
  • يونيو 2008

Internships at: 1. Pure Water Technologies Pvt Ltd 2. PARCO Pak-Arab Refinery Ltd. Projects at: 1. Pakistan State Oil (PSO) in QMS 2. General Tyre and Rubber Company Ltd. in QMS

Specialties & Skills

Brand Standards
Maintenance Management
Project Collaboration
Team Management
MS office
Branding and Creative Skills
Primevera 5.0 Project Planner

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Member
  • December 2019
IBA Alumni
  • Member
  • December 2016

التدريب و الشهادات

Primevera 5.0 Project Planner (الشهادة)
تاريخ الدورة:
August 2008
صالحة لغاية:
November 2008