Project Manager
ROYAL GROUP (Tamouh Investments)
Total years of experience :20 years, 2 Months
As Project Manager/Senior Project Engineer (PM) working for the Infrastructure Works (Sector 2 & 3), Al-Reem Island, Abu Dhabi, UAE
1. Overseeing the construction of regional and local road works, infrastructure utilities, bridge structures over canal, sewerage pump station and shore protection works to ensure that the projects are built as per approved design.
2. Construction planning, management and contract administration.
3. Conduct regular project meetings with internal and external teams for project tracking and progress review.
4. Review and monitor variations to the work to mitigate time and cost impacts for any required changes.
As Asst. Resident Engineer and worked for Abu Dhabi International Airport- New Main 2-K Runway and Allied Works Project.
1. Construction supervision of main runway, taxiways, tunnel structure and allied building works.
2. Coordination and active follow-up for stage wise approval of construction activities.
3. Contract administration.
4. Review, evaluation and approval of method statements, material submittals, shop drawings and RFIs.
5. Review and monitor the implementation of project schedule at site.
6. Final inspection and implementation of project close out plans.
1. As Senior Project Engineer and worked for following projects
a) Construction of Al-Sadd Sports Complex Phase II (inception to hand over), Doha, Qatar
b) Construction of Substructure works of World Trade Centre (54 stories), Doha, Qatar
1. Construction supervision of substructure, super structure and architectural finishing works and finishing fit out works.
2. Contract administration, planning & controlling works.
3. Liaison with the client for site meetings, special meetings & monthly progress review meetings and routine correspondence with various agencies involved in the project.
4. Quality control on materials and workmanship
5. Supervision of assembling and erection of the steel roof structure of Multipurpose Hall (50mx50m), Main Entrance Dome (42m Φ) and Swimming & Diving Pool Hall (50mx80m).
6. Final inspection and implementation of project close out plans.
1. As Project Manager (SEP 2003 to MAY 2005) and worked for Construction of New NHA Head Office Building (B+G+4), Islamabad
2. As Dy. Manager (Planning and Coordination) handling the following projects
a) 132/11 KVA Grid Station, Lahore International Airport New Terminal Complex.
b) Habib Bank Building, Paris Road, Sialkot. (B+G+3)
1. Construction planning, implementation and management of construction activities till hand over.
2. Preparation, review, and monitor the project schedule at site.
3. Preparation of claims & variation in rates and approval from the Consultants/Client.
4. Liaison with the consultants/Client regarding the Contractual matters (FIDIC 4th edition).
5. Preparation of technical bid for various tenders to be submitted for competition.
1. As Construction Manager and worked for the Construction of Motorway Service Areas at Lahore - Islamabad Motorway (10 #s) each includes, five star restaurant complex, admin building, staff accommodation, substation and infrastructure utilities.
1. Oversee the construction activities from inception to completion.
2. Review, monitor and implementation of project schedule at site.
3. Review, analyze and recommend approvals or denials of claims, change orders submitted by the Contractor
4. Liaison with the consultant regarding the updating the status of cost to date, estimated cost to complete comparison to target estimates, contingency and escalation evaluation and reports of major changes.
5. Final inspection and implementation of project close out plans.
As QA/QC Engineer and worked for Lahore By-Pass Project (17 km motorway including a Bridge on river Ravi and three interchanges).
1. Construction of road embankments, asphalt pavements and slope protections
2. Construction of reinforced, Pre/Post tensioned concrete structures.
3. Execution of structural works at Ravi Bridge (640 m long), Babusabu Interchange Bridge, Shahpur Interchange Bridge and Faizpur flyover. (Piling, transoms, Girders, Diaphragms, deck-slabs and Barriers).
4. Design of concrete mixes according to ACI and assurance of quality of concrete at batching plant.
5. Studies of quarry for stones, aggregates, sands and gravels and on the job premix production.
6. Preparation of Job Mix Formula and quality assurance of asphalt works at asphalt plant and site.
7. Coordination with commercial laboratories & institutions for the testing of different materials
8. Training and guidance of technical staff to tackle different tasks in the field
Project Management Professional Credential, Good Standing.