Muhammad Noman, Team Lead DCS Engineer

Muhammad Noman

Team Lead DCS Engineer

GE

Location
United Arab Emirates
Education
Bachelor's degree, Computer System Engineering
Experience
13 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 11 Months

Team Lead DCS Engineer at GE
  • United Arab Emirates - Dubai
  • My current job since January 2017

• Integration of third party DCS like Siemens, Yokogawa, Honeywell, Emerson and Mitsubishi to GE OSM Controller.
• Connectivity of customer Power plant sites from Middle East, Africa and Europe region to GE Atlanta US Monitoring and Diagnostics center.
• Responsible for site survey and write Basic of design document for project.
• Responsible for Firewall configuration and implementation of Data Diode solution cyber security solutions.
• For complex or first-of-a-kind installations, physically install M&D equipment, DCS software, and oversee high-speed connection network engineers to ensure connectivity between customer control systems and GE M&D Operations Center. Document changes to customer network topology diagram and understand controls one-line drawing.
Projects.

1. First Mind and Machine implementation in HUBCO Norowal Pakistan.
2. OSM Installation and connectivity of site to Atlanta M&D Center SESTO Italy.
3. DEWA Lockbox configuration and installation, Dubai.
4. Tokoradi Design for integration of Gas Turbines with Atlanta M&D Center, Ghana Africa.
5. OSM Installation and DCS configuration LALPIR Pakistan.
6. OSM Installation and DCS configuration Engro Thar Site.
7. OSM HP server installation, NOMAC Salalah 2 Oman Power plant.
8. And many more other sites that

Team Leader at Emirates Defence Industries Company-Al Taif
  • United Arab Emirates - Abu Dhabi
  • July 2015 to January 2017

Condition monitoring and predictive/corrective maintenance of critical high-tech military system .Integrate, service and maintain vehicles with militarized PLC, SCADA and communication systems .Developing a safe working environment by adhering to all necessary health and safety requirements and legislations.

• Led, coordinated and supervised overhauling workshop to overhaul and rebuild assets of as varied engines, instrumentation, PLC, SCADA, mechanical systems, hydraulic, pneumatic, fuel, power systems, electrical and control systems, with continuous improvement. Instituted a quality acceptance limits for all products as per the manufacturer standards designed.
• Managed for maintain functionality and calibration of all equipments, tools, testing units and automated dynamometers that require instrumentation, mechanical and data acquisition systems.

Head of Automation Department at IT and Automation Academy
  • Pakistan - Islamabad
  • November 2013 to July 2015

• Provide online training PLC and SCADA Oil & Gas Automation in Canada, Middle East, US and Ireland Egypt, KSA, UAE, Mexico, Germany, Kenya, Jordon, Canada, US, Africa, Slovakia, Sri-Lanka, India, UK, Italy, Cambodia, Turkey, Kuwait and Spain.
• Mange all staff and instructors to achieve quality education
• Establish and promote high standards for all students and staff for academic performance and responsibility for behavior.

Main online clients

I have provided training for professional of following companies.

 Premier Biomaterials Ireland.(PLC & SCADA System)
 Brave Control Solutions Canada.( PLC & SCADA System)
 Ford Motor Company Mexico.( PLC & SCADA System
 Siemens Dubai.( PLC & SCADA System)
 Danish Dairy Company K.C.S.C Kuwait.( PLC & SCADA System)
 Alghanim international Kuwait.(Oil & Gas Automation)
 ADNOC UAE(Oil & Gas Automation)
 Oil & Gas Automation Training Course Contents.
http://onlineplc.org/oil-gas-automation-webinar
 PLC & SCADA System Training Course Contents.
http://onlineplc.org/plc-scada-system

Web link of Engineers Feedback: http://onlineplc.org/students-feedback

Control System Engineer(DCS,SCADA,PLC And Networking) at Bestway Cement UK Based Multinational Group of Companies
  • Pakistan
  • June 2014 to July 2015

Mustehkam Cement has 1000 tons per day cement production, the Capacity enhancement Project from 1000TPD to 3400TPD is completed now. In project my participation was to design and implement control system for 3400TPD plant in SUPCON DCS Control System.
Supervising the Maintenance and Development in Instrumentation, and plant Automation system PLC DCS jobs at Cement Plant. Responsible for trouble free operation and fault diagnostic of Automation Section of both production lines.
Development of PLC Logic and interface with DCS and configuration of Control Modules.
Communication of WINCC SCADA with MODBUS RTU and OPC Server.
Data acquisition from various types of Energy Analyzers & PLCs through software using RS232 & RS485 MODBUS RTU & TCP/IP protocol.
Executed various jobs of fuel monitoring & energy management system.
Provided data/event logs (Excel, PDF), trends, and alarms through remote monitoring by deep-sea PLC by using DSE-890 GSM/GPRS device.
BMS system integration with Boiler.

COMMUNICATION

Profibus, Ethernet, ScNet, Hart Communication.

HMI’s Software’s and Hardware’s

• Win CC Version 6.0 and 5.1
• Win CC Flexible

SCADA Software's

• Win CC Professional
• Wintr SCADA

PROJECTS.
=================================================

1) Waste Heat Recovery Plant DCS Project (In Progress)
• Design and Build program of WHRP in DCS System ECS-100 SUPCON.
• Supervise termination of field signals to Terminal Board and DCS panel hardware installation.
• Coordinating with vendors to complete this project.

2) Wireless control stacker reclaimer.

• Wireless control using Redlion controllers using MODBUS TCP/IP and MODBUS RTU and S7-300 Siemens PLC For Bestway Cement Pakistan

2) Robot and pressing machine control
3) TP 1200 Comfort Panel HMI design using TIA V12

Instrument and Control Engineer(PLC/DCS/SCADA) at Systematic Engineering Solutions - Pakistan
  • Pakistan - Islamabad
  • May 2013 to June 2014

• Installation and commissioning of Rosemount Radar Tank Gauging system for process control and display its physical parameters and process on Tank Master in Shell and Pakistan State Oil.
• Installation and configuration of PLC, DCS, HMI and SCADA System.
• Communication of WINTR SCADA with MODBUS RTU and OPC Server.
• Configuration of web Server of WINTR SCADA.
• Calibration of Level Pressure Flow and Temperature Transmitters with HART Communicator.
• OPC Communication between WINCC SCADA and SUPCON DCS.
• WINTR SCADA Client Server implementation.
• Robot and pressing machine control using S7-300 Siemens PLC For Bestway Cement Pakistan.
• ICE CREAM Company Project: Control of mixer including batching, mixing and discharge to freezing. This system was developed was made Siemens PLC and operator can interact with system through an HMI
===============================================
PROJECTS
===============================================
Three-element boiler drum level control using the ABB freelance 800F DCS at Confidential organization.
• Configure and tune PID for Level and flow.
• Make graphics to show new added control process parameters.

Yokogawa Centum CS 3000 DCS Modification Project at Pakistan Petroleum Limited (PPL)
• Addition of new control loops in existing DCS
• That includes ESD Logic Modification.
• Make graphics to show new added control process parameters.

Installation and commissioning of Rosemount Radar Tank Gauging at Shell Pakistan and PSO .

• Installation and commissioning of Rosemount Radar Tank Gauging system for process control and display its physical parameters and process on Tank Master in Shell and Pakistan State Oil.

Automation Engineer at MOL Multinational Oil Company – Pakistan
  • Pakistan - Islamabad
  • July 2010 to May 2013

• Supervising the maintenance and development plant automation system PLC DCS SCADA jobs at Plant. Responsible for trouble free operation and fault diagnostic of Automation Section of both production lines.
• Development of PLC Logic S7-200 and S7-300 and interface with ABB DCS and configuration of Control Modules and MODBUS TCP and MODBUS RTU Communication with DCS.
• Installation and Configuration of RTN Software (via OPC link) of ABB DCS for Process optimization and to provide Management level monitoring to Managers on plant and in head office.
• Configured SIP server provided connectivity for all nodes; assigned new IP and LAN Pools.
• Responsible for configuration of VoIP phones X-Lite, Nortel and D-Link.
• Handled installation and configuration of various Cisco Switches.
• Responsible for wireless connectivity of two different sites with NanoBridge M5.
• Provide training to fresh Engineers about Process control.

Education

Bachelor's degree, Computer System Engineering
  • at COMSATS
  • July 2011

Major Subjects 1:Control system 2:Electronics 3: Networks 4: VLSI 5:Computer System Related subjects

Specialties & Skills

IP Networking
Industrial Networks
Programming skills
Networking Skills
Automation
Modbus RTU
Management
Oil and Gas Safety
Instructor
OPC Server
SolarWinds IT management software
Industrial Networks
Profibus
SCADA Security
CISCO Switches
Wireless
Radar Tank Gauging System
Project management
Routing
Nagios Network Monitoring Software
WINCC Flexible HMI
Instrumentation
Oil and Gas Process
IT Support
Control Design
SIP Server
Instrumentation
Siemens 1200 Tia portal
Cisco Switching
ABB DCS
S7-400 Siemens PLC

Languages

English
Expert
Urdu
Expert
Arabic
Beginner
Punjabi
Expert

Memberships

Pakistan Engineering Council
  • Registered Engineer in PAkistan
  • December 2011

Training and Certifications

ABB DCS freelance 900F training (Training)
Training Institute:
ABB UK
Date Attended:
October 2014
Duration:
15 hours
PLC and SCADA (Training)
Training Institute:
SINA
Oil and Gas Automation (Training)
Training Institute:
Oil and Gas Development Company Limited Islamabad Pakistan
CCNA (Training)
Training Institute:
Corvit
Date Attended:
November 2011