Planning/LC Electrical Engineer
SBG (Sudi Bin Ladan Group)
Total years of experience :15 years, 8 Months
Building Management System:
Operation and Maintenance of DDC (Direct Digital Control) Siemens and Johnson Controller
Software Siemens DESIGO v4
Handling BMS of Air Traffic Control Complex, Air Traffic Transmitter & Receiver Building, and other Communication Buildings on Airport Runway
BMS Control of Yourk Chiller Units (2000 ton), Air Handling Units, Fan Coil Units, Water Pump Stations (Fire Water Pumps, Makeup Water Pumps, Potable Water Pumps), Cooling Tower.
Operation and maintenance of all types of transmitters such as pressure Tx, Level Tx, Flow Tx, Temperature Tx, I/P converter, valve calibration. Lubricates instruments and replaces defective wiring and tubing
Scheduled the PM automation Devices and Instrumentation
Managing the Overall Corrective Maintenance Activities
Planning and Managing the Preventive Maintenance Activities
Testing, Maintaining & Modifying the mentioned Systems
Analyzing data and presenting findings in written reports
Managing Operations, working collaboratively with other internal staff
Liaising with Clients, Suppliers, Contractors & Relevant Authorities i.e. QCAA and QCDD
Manage and schedule monthly duty Roster of Technicians, Supervisor & Forman
Fire Alarm And Detection System:
Working as Site Engineer for Fire Alarm and Detection System (FADS).
PM and CM of FM 200 KIDE Fire Suppression System
O&M the Fire Fighting System, FM200 fire suppression system,
Installation and Maintenance of VESDA ADS Smoke Detector System
O&M of EST3 Main Fire Alarm Panel (Intelligent analog Addressable system)
Planning and Managing the Preventive Maintenance Activities of Fire Alarm and Detection System (MFACPEST3, Initiating Devices and others Control Modules etc)
Take immediate decision when Fire Alarm Sounded as per Alarm Condition (false alarm or true alarm)
CCTV System:
Digital Video manager And DVR (Digital Video Recorders), NVR (Network Video Recorders), CCTV Switchers, IP Cameras (IP Creating & Commissioning with Network & then Fault has been Carried on Network & Cameras) PTZ domes, Streamers, Video Surveillance System
Camera’s Setting, System Recording according to Client requirements
FRC Engineer:
Make Possible to solve the Problem with in minimum Time Duration
Coordination with Clint HIA-FRC (Hamad International Airport), and make sure the Quality of work protocol of QD-SBG FRC according to HIA-FRC
make possible to close the Trouble Ticket’s within minimum time
Coordination with Project Engineer and Field Engineer Regarding Complains
Supervise the Maxima Software and give Guidance to WCCO (Work Control Centre Operator) regarding Maxima and work control protocol
Documentation work as per QD-SBG standards
Handling Daily CM and PM Work Order and Reported HIA-FRC
Working on PON (Passive Optical Network), Triple Play Services over Optical fiber (Voice, Data, Video)
Installation of ONT(Optical Network Terminal), Branch joint, ODF’s, VOLT, POLT
Use of Splicing Machine, OTDR, VFL, Optical Power Meter, Optical Light Source, Optical Loss Meter, Variable Optical Attenuator, Optical Talk Set LAN Tester
Performing Optical Loss Test according to EIA Standard’s
Manage and schedule The Team Work and Supervise the Installation FTTH work at Customer Premises
Prepare the plan of Installation of ONT (Optical Network Terminator) from Main Distribution cabin to Customer Premises
Quality Check Visit as per NTL standers.
On-Line Support to the field Staff for Provisioning, Maintenance, Testing & Fault Rectification
Attend the call-out duty and any special event duty to ensure clearing the faults within the time and keep the network efficiency in optimum level with customer satisfaction
Work indoor and outdoor along with skill to work in a team or independently
Manage and schedule work plans and action plans for ongoing development projects i.e. PDH/SDH Transmission System/OFC in order to monitor high quality service and ensure that is laid and commissioned according to defined quality standards
Main Projects:
NSN swap Project (Nokia Flexi BTS)
Telenor (Nokia) Project (Nokia Ultra BTS)
NSN Expansion Project (Nokia Ultra BTS)
NEC Mobilink Project
RESPONSIBILITIES
Worked as a Associate Field Engineer for Telenor Projects & NSN Projects in the central region of Lahore, Multan & Islamabad
Installation & Troubleshooting of Nokia ULTRA BTS and Nokia FLEXI BTS.
Nokia flexi BTS Commissioning using Nokia flexi edge BTS Manager
Installation Commissioning & Troubleshooting of Nokia & siemens NEC Transmission Links and Alcatel lucent.
Alarms troubleshooting, reporting, testing, patching at rectifier & BTS end & verification at OMCR terminal
Installation and Troubleshooting of Electrical ATS and IPS
Installation and Troubleshooting of Rectifiers(Delta, Elteck, Power One, Emerson) For BTS
Expansion of Nokia ULTRA BTS & Nokia FLEXI BTS
Swapping indoor and outdoor Alcatel lucent, Siemens BTS to Nokia Flexi BTS
Swap activity of the transmission links : Nokia (flexi BTS, Siemens (Sral XD)
Forwarding completed Document to the customer and rectifying quality checklist.
Feeder testing (VSWR) by using Anristu and Bird Site Master
Quality check visits as per Nokia & TP standards.
Hand on work experience BIRD Site Master, Anristu Site Master, Splicing Machine, VFL (visual fault locator)
Master of Science Electronics
Bachelor of Technology Electronics (pass)
Diploma Of Associate Engineer of Electronics (3 year)