Murat Bora ESKI, Construction Manager

Murat Bora ESKI

Construction Manager

Tedeschia Construction

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Civil Engineering
الخبرات
19 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 11 أشهر

Construction Manager في Tedeschia Construction
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أغسطس 2018

150.000 m2 Precast Building & Infrastructure & Road Project
• Assign construction organisation & disciplines and managing the project by considering of HSE regulations.
• Setup the project methodology & schedule for the activities
• Monitor the project on going as per budget & plan.

Senior Engineer في Anagold Mining
  • تركيا - أرضروم
  • أغسطس 2017 إلى أغسطس 2018

Construction of haul road( 5 km) as well as utility corridors & O/H transmission line for the mining plant of the company.
Construction of tailing storage dam- 5.000.000 ton earthwork.
Sub-contractor's work review and approve.
Sub-contractors under my responsibility:
1- Amec Foster Wheeler -(WOOD)
2- Ciftay Construction

Project Manager في AK-AY-DO Construction
  • إيران
  • أكتوبر 2016 إلى يوليو 2017

Design & Build of Industrial building for the purpose of warehouse & trailer parking for Unilever company in Industrial Zone at Qazvin /Iran

Project Manager في FAST Consortium - Riyadh Metro Project
  • المملكة العربية السعودية - الرياض
  • أبريل 2016 إلى أكتوبر 2016

Responsible for construction of Metro Tunnels super structure in Line 4 - Riyadh Metro project.

Construction Manager في Yuksel Insaat
  • المملكة العربية السعودية - الرياض
  • أغسطس 2015 إلى مارس 2016

Construction manager position at Project of Bus Rapit Transit System for Riyadh. Scope; operate & manage construction of Bus station, pedestrian bridges, bus stops and hardscape & asphalt work around the above structures.

Project Manager في YUKSEL CONSTRUCTION CO.
  • المملكة العربية السعودية
  • مارس 2014 إلى أغسطس 2015

Infrastructure works in Area 200-Female Zone in King Abdul Aziz University (KAU)- Jeddah. Project value is 20.000.000 $ (approx.) Client: KAU - Consultant : ZFP

Site Manager في Yuksel Construction Co.
  • المملكة العربية السعودية - جدة
  • أكتوبر 2011 إلى مارس 2014

Concrete Repair for Selected Structures of Power & Desalination Plant of Jeddah. Project value is 30.000.000 $ (approx.) Client: Saline Water Conversion Corporation- SWCC.

Construction Manager في Yuksel Construction Co.
  • المملكة العربية السعودية - الخبر
  • أكتوبر 2010 إلى أكتوبر 2011

Concrete Repair for Selected Structures of Power & Desalination Plant of Al-Khobar- AK2. Project. Project Cost: 23.000.000 $. Client: Saline Water Conversion Corporation- SWCC.

Site Manager في Yuksel Construction Co.
  • المملكة العربية السعودية - الرياض
  • ديسمبر 2006 إلى أكتوبر 2010

Concrete Repair & Arresting of Water Leakage for Riyadh Emergency Reservoirs (R1-C3)&(R2-C4) Compartments Project was managed & executed & completed under my responsibility. 2 nos water tanks - 250.000 m3 each and major works of the scope are total 15.000 m3 demolition & reconstruction Project cost: 10.000.000 $. Client: Saline Water Conversion Corporation- SWCC.

Section Chief في Yuksel Construction Co.
  • أفغانستان
  • أكتوبر 2005 إلى أكتوبر 2006

I have worked as site engineer and steel construction supervisor of Project for Afghan National Army Brigade in Khowst - Afghanistan. During this project, total 500 Tons steel structures have been erected under my supervision. Furthermore, a temporary camp construction has been managed under my control - 10.000.000. $, and at the end of the project I have promoted to Turn - over Manager to complete the project. Total project cost: 60.000.000$.Client: Corps of Engineer- USA Army. Project Duration - 12 Months.

Site Engineer في Mega & Ozgun & Namberg JV.
  • أفغانستان
  • نوفمبر 2004 إلى أكتوبر 2005

I have worked as site engineer and steel construction supervisor of Project for Afghan National Army Brigade in Herat - Afghanistan. During this project, total 450 Tons steel structures have been erected under my supervision. Total project cost: 55.000.000$.Client: Corps of Engineer- USA Army. Project Duration - 12 Months.

Site Manager في ASFA
  • العراق
  • يونيو 2004 إلى ديسمبر 2004

I’ve supervised and directed construction of 6 new office buildings for KBR at remote site in IRAQ. Total construction field is 1400 m2 and total proposal value is $10 million approximately.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Ondokuz Mayis University
  • يناير 1998

Department : Civil Engineering

Specialties & Skills

Concrete
Construction Management
Water Resources
Infrastructure Projects
Cash Flow
MICROSOFT OFFICE
MICROSOFT PROJECT
AutoCad
Cash Flow
Communication and Negotiating
Management & Supervisory
Leadership & Technical Knowledge
Preparing Method Statement
Primavera P6

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Primavera P6 (تدريب)
معهد التدريب:
Private
تاريخ الدورة:
April 2014
المدة:
60 ساعة
PMP Attendance Programe (تدريب)
معهد التدريب:
Private
تاريخ الدورة:
May 2015
المدة:
35 ساعة