Murugaperumal kuttalingam, MEP Engineer

Murugaperumal kuttalingam

MEP Engineer

QDVC

البلد
قطر - الدوحة
التعليم
ماجستير, BE,MBA (Project Management)
الخبرات
19 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 0 أشهر

MEP Engineer في QDVC
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ أغسطس 2012

 Meeting with the Client, Consultant and sub-Contractors on regular intervals in regards to the Project progress and plan.
 Review of P& ID, Layout & Installation details etc,
 Review of MAR & MST with ITP for Client approval.
 Fabrication and Installation of Various Pipe lines such as Stainless Steel, Carbon Steel, DI, CI, GI, GRP, HDPE, Vitrified Clay, UPVC & its accessories with support systems.
 Installation of HVAC Ducts, AHU & Refrigerant Pipe lines
 Installation Fire Fighting Pumps with piping accessories and FAS also.
 Installation of Water Features elements, Pumps with dosing accessories.
 Installation of Landscaping systems
 Supervision of Parking Management system, Public Address System and Building Management system
 Installation of various Instruments such as Electro magnetic flow meter, Pressure gauge, Pressure transmitter, Level switch & Ultrasonic level transmitter
 Co-ordination with Civil & Electrical works.
 Installation of HV/MV Panels, VFD, Transformers, and Diesel Generator sets.
 Erection of Cable trays, Cable Laying, Glanding, Termination & Continuity Test.

Mechanical Engineer في QDVC
  • قطر - الدوحة
  • سبتمبر 2010 إلى أغسطس 2012

 Review of P& ID, Layout & Installation details etc,
 Preparation / submission of MAR & MST with ITP for approval.
 Installation, Erection & Commissioning of various capital equipments such as Pumps, Penstocks, Cranes, Manual Bar screen & valves.
 Fabrication and Installation of Various Pipe lines such as Stainless Steel, Carbon Steel, DI, GI, GRP, HDPE, Vitrified Clay, UPVC & its accessories with support systems.
 Installation of various Instruments such as Electro magnetic flow meter, Pressure gauge, Pressure transmitter, Level switch & Ultrasonic level transmitter
 Installation of HV/MV Panels, VFD, Transformers, and Diesel Generator sets.
 Erection of Cable trays, Cable Laying, Glanding, Termination & Continuity Test.
 Installation of Lighting / earthing system.
 Supervision & Extracting the works from Sub- Contractors for speeding up the works.
 Co-ordination with Civil & Electrical & Other Trades of works.

Project Coordinator في Belhasa Projects LLC
  • الإمارات العربية المتحدة - دبي
  • أبريل 2009 إلى سبتمبر 2010

 Procurement coordination for all kind of unit Equipments from recommended suppliers as per Client’s Specifications/Approval.
 Managed successful relationships with Client’s and Suppliers.
 Worked closely with program managers and project managers to support the successful development and implementation of project schedules.
 Facilitated on-time and efficient completion of projects by understanding critical activities and alerts.
 Supported the project close out process and ensure project closeout in a timely manner.
 Coordinated multi-site work flow processes through procurement, shipping and receiving, staging, and release organizations.
 Coordinating and supporting to transfer all kind of equipments and accessories to the site.

Site Engineer في Belhasa Projects LLC
  • قطر - الدوحة
  • ديسمبر 2007 إلى أبريل 2009

 Completion of site works according to the Programme of works (As per Scope of work and Contract Period)
 Supervision for the preparation of P& ID, Layout, and GA & all kind of Installation of various equipments with piping details etc.
 Installation, Erection & Commissioning of various capital equipments such as Pumps, Penstocks, Valves, Cranes, Manual & Mechanical Bar screen, Pre-Treatment Equipments, Aerator, Blower, Clarifier, Belt Filter press, Poly- Preparation units & Odor Control unit.
 Fabrication and Installation of Various Pipe lines such as Stainless Steel, Carbon Steel, DI, GRP, HDPE, Vitrified Clay, UPVC, Asbestos Cement pipes and Pre-Insulated Pipes and Fittings & its accessories such as Dismantling joints, Flange adaptor, coupling with support systems.
 Hot Tapping in Chilled water Pipelines.
 Fabrication / installation of Insulation and cladding works for the chilled water pipe lines.
 Planning and Execution of Site works on daily basis & Supervision of all works at site as per approved MST
 Supervision & Extracting the works from Sub- Contractors for speeding up the works.
 Subsequent implementation at site requirement according to client’s approval.
 Preparation of Bill of Materials
 Handing over of the project to the Client with required documentation.
 Hydro Testing for all kind of pipes lines as per approved MST & ITP
 Bolt Torquing for all kind of flanged joints.
 Tape wrapping for Ductile iron pipes
 Supervision of Metal works installation such as platforms, ladders, and hand rails in various materials like Aluminium, Stainless steel & GRP.
 Co-ordination with Civil & Electrical works

Engineer Designs في Aqua Designs India Ltd
  • الهند - تشيناي
  • يونيو 2005 إلى ديسمبر 2007

 Project Co ordination with project team
 Planning and scheduling for drawings
 Proposal P&I diagram & Layout finalization as per client’s suggestion
 Preparing Civil GA and Fabrication drawings
 Drawing preparation for pressure vessels/UF/RO Systems/STP /Desalination
 Preparation of piping layout & related Isometric drawings with supporting details
 Preparation of BOM

الخلفية التعليمية

ماجستير, BE,MBA (Project Management)
  • في Alagappa University
  • يناير 2012
بكالوريوس, Mechanical Engineering
  • في Anna University
  • أبريل 2005

Specialties & Skills

Commissioning
Installation
Preparation
Building Management System (BMS)
Water Features
Fire Fighting & Fire Alarm System
Landscaping
LV , MV & HV
Sewage Treatment Plants & Water Treatment Plants
Pumping Stations (Irrigation & Sewage)
Public Address System (PAS)
Parking Management System (PMS)

اللغات

الانجليزية
متمرّس
الملايام
متوسط
التاميلية
متمرّس
الهندية
مبتدئ

التدريب و الشهادات

Quality Management System Awareness Part 1 (تدريب)
معهد التدريب:
Qualityaustria
تاريخ الدورة:
September 2011
المدة:
8 ساعات
Pro-Engineer (تدريب)
معهد التدريب:
CSC Computer Education (P) Ltd India
تاريخ الدورة:
July 2005
المدة:
80 ساعة
Plant Design System(PDS) (تدريب)
معهد التدريب:
Siva PDS Training & Projects
تاريخ الدورة:
December 2008
المدة:
40 ساعة
AutoCAD (تدريب)
معهد التدريب:
CSC Computer Education (P) Ltd India
تاريخ الدورة:
July 2004
المدة:
240 ساعة
Quality Management System Awareness Part 2 (تدريب)
معهد التدريب:
Qualityaustria
تاريخ الدورة:
October 2011
المدة:
8 ساعات