موسى عليان, Elevator Project Manager

موسى عليان

Elevator Project Manager

Mitsubishi Electric Saudi LTD

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Mechatronics Engineering
الخبرات
8 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :8 years, 7 أشهر

Elevator Project Manager في Mitsubishi Electric Saudi LTD
  • المملكة العربية السعودية - جدة
  • يوليو 2011 إلى سبتمبر 2018

• Mitsubishi Electric Saudi LTD. _ \[Jeddah_Saudi Arabia\] _ \[ 7 Years \] :

 Project Manager _Major Project Division \[1.5 Year\]:

Handling “Islamic Development Bank Project (IsDB) Headquarter ” (dismantling Project)
in Jeddah as project manager with following duties (summary):
o Receive and pre study project file with sales department.
o Generate project plan based on customer needs, factory conditions, manpower etc.
o Arrange weekly meetings with the customer to keep smooth process.
o Follow the customer to make elevator shafts ready for installation.
o Arrange material delivery plan to save from damage or miss.
o Check payments situation before starting activities at site.
o Prepare safe and enough storage space with customer near elevator shafts.
o Deliver and arrange elevator material to the site (Last in First Out).
o Arrange necessary documents from customer and consultant for payment issues.
o Check site ready and safety status before sending installation teams to the site.
o Prepare all necessary tools and materials required for installation teams.
o Start and follow installation process with coordination with QC department.
o Support installation teams at all sides (time, quality, safety, logistics, .. etc)
o Make sure that installation completed as planed with high quality and safety.
o Arrange necessary documents from customer and consultant for payment issues.
o Protect all installed equipment until site ready for testing.
o Keep following project payments as per contract conditions.
o Follow the client to prepare the site for elevator testing before send testing teams.
o Follow same procedure as mentioned in installation phase.
o After finish testing and commissioning; arrange inspection with QC department.
o After snags completion arrange inspection with customer for hand over.
o Hand over the project after receives all payments.

 Senior Project Engineer_ Major Project Division ( Installation & Testing ) \[ 5 Years\] :

o Handling “The Sail Tower Project” in Jeddah (65 floors) for most activities : Planning, Weekly Meetings, Site Requirements, Following Up… etc.

o Handling more than 30 Project with different capacities like (Al Thuraya College, Technical College, Jeddah Gate, Grain Silos …etc.) from pre delivery to hand over (receive from sales department then handover to maintenance department).

o Handling King Saud University for Health Sciences \[88 Elevators\] : ( Testing, Commissioning and Handover Part).

 Elevator Installation Engineer \[ 6 months \] :

o Installation Engineer at General Organization for Social Insurance (GOSI) Headquarter Project in Riyadh.
o Escalators concentrated training course (Installation, Testing and Commissioning).

Testing, Commissioning and Maintenance Engineer في Al_Methaq Company For Elevators and Escalators
  • الأردن - عمان
  • أغسطس 2010 إلى يونيو 2011

o Troubleshooting for all kind of problems for \[MASHIBA Elevators\] & Locale Elevators.
o Do step by step testing process for \[MASHIBA Elevators\] & Locale Elevators.
o Do final adjustment for all parts (External doors, internal doors, car … etc.).
o Assemble and connect elevator control panel for dumbwaiter elevators.
o Do all kind of inspection with related parties (client, consultant, government ... etc.).
o Do short technical and safety training for technicians and helpers.

Testing, Commissioning and Maintenance Engineer في Petra Company For Elevators and Escalators [KONE Elevators
  • الأردن - عمان
  • مايو 2010 إلى أغسطس 2010

o Learn names of mechanical and electrical parts for the elevator.
o Support technicians during solving problems.
o Learn how to connect and adjust main elevator parts.

Maintenance Engineer في Petra Company For Elevators and Escalators [KONE Elevators
  • الأردن - عمان
  • يوليو 2008 إلى أغسطس 2008

• Maintenance Engineer: 40 days concentrated training

الخلفية التعليمية

بكالوريوس, Mechatronics Engineering
  • في Balqa Applied University
  • يونيو 2009

• Graduation Project: Yaw Mechanism Control of Wind Turbine. • Speed Control of DC Motor through stator voltage. • Loader Circuit to program PIC 16F877A and PIC 16F84A from PC. • Transformer Stages: Transformation, Rectification and Filtering (220V AC - 6V DC) COLLEGE SKILLS: • High knowledge in: PLC and PIC microcontroller programming. • High knowledge in: Process Control _ Open loop system and Closed loop system. • High knowledge in: PID tuning. • High knowledge in: Hydraulic and Pneumatic - components and connections. • High knowledge in: Elevators control, safeties and components. • High knowledge in: The principles of work of Escalators, Cranes, and Conveyors. • High knowledge in: The connection of Power, Control and Electronics circuits. • High knowledge in: MATLAB Simulink and Automation Studio. • High knowledge in: 2D AutoCAD drawing. • Good knowledge in: Sensing Elements. • Good knowledge in: Robotics. • Computer Skills: • High knowledge in: Microsoft Office (Word, Excel, and Power Point) and Internet use. • Good Knowledge in programming: Assembly, C++, micro C and G-Code.

الثانوية العامة أو ما يعادلها, Scientific Branch
  • في Al Thundwah High School
  • يونيو 2004

• Saudi Secondary Education Certificate: scientific branch. (Average = 96.5)

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس
التركية
متوسط

العضويات

Saudi council of Engineers
  • Engineer
  • December 2013