Implementation of Maintenance Jiritsuka for reducing downtime up to 8%.
•Supervising team of 47 members for incorporating Preventive Maintenance (PM), Breakdown maintenance & countermeasure implementation to eliminate / reduce future downtime.
Key Responsibilities
•Troubleshooting of Breakdowns of machinery through 5W & 1H.
•OSHMS implementation (Occupational Safety & Health Management System).
•Electrical Hazard finding & removal in Panels as per Bureau Veritas Guidelines.
•Maintaining inventories, PM reports, technical Data, and training data of member.
•Planning of Preventive Maintenance of cranes, Press Machines, Spot Welding System, CO2 welding, Main Body Jig & Robots.
•Troubleshooting of Robot & PLC.
•Coordinating with different departments (Civil, Mechanical, Electrical and Projects team) and sub-contractors for expansion of line, new installations and getting the desired results on time or ahead of schedule.
•Coordinating with equipment manufacturers for coming up with the possible Root Cause of unusual breakdowns.
Monthly plant Utilities consumption trend, power plant availability & reduction plan
•Liaison with Government bodies & plant users for uninterrupted supply of utilities.
Key Responsibilities
•Verify all consumables usage including fuel usage, utility bill expenses and suggest new methods to decrease utility usage up to 5%.
•Using BMS (Building Management System) system to incorporate cooling load by cooling towers and diversion of chill water to prioritize production through utilization of centrifugal and absorption chillers.
•Liaison with concerned authorities (government / private authorities) and general office work.
•Using Power monitoring system () for monitoring all different department and base loads at different seasons.
•Responsible for preparation of Fuel Consumption report, KWH generated and availability report of engines.
•Preventive Maintenance planning of Gas Generators, Diesel Generators, chillers (Absorption & Centrifugal), Transformers & Auxiliaries.
•Verify all network consumables, fuel usage, utility bill expenses and comparison of trends with the provision made before getting the expense.
•Maintaining inventories of equipment.
•Projects and Achievements
•Project execution for Installation of 20/40 Ton Cranes while plant is operational. (