مشتاق   حسين, Senior Lab Supervisor

مشتاق حسين

Senior Lab Supervisor

Al Mumayaz Laboratory

البلد
المملكة العربية السعودية - الرياض
التعليم
ماجستير, Mass Communication, Research Methodology, Social Psychology,
الخبرات
19 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 0 أشهر

Senior Lab Supervisor في Al Mumayaz Laboratory
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أكتوبر 2016

Period 15th October, 2016 to Date
Company Al-Mumayaz Laboratory, Saudi Arabia
Position Senior Lab Supervisor/ Lab Manager
Projects * Infra Structure at Malik Abdullah Housing Project, Jazan
* Aramco Project Package-5, 9 & 10 at Jazan Economic City
* Riyadh Metro Project

* King Salman Air Base Project

* King Salman Park Project

* Qiddiya Upper Plateau, Lower Plateau and Six Flags Theme Park


Main Responsibilities:

 I am the in charge for all work requirements and materials requisition
 I am Supervising Concrete, Soil, Aggregate, and Asphalt Testing in the Lab
 Checking the Safety of men and equipment and strictly Safety Compliance
 Ensuring proper compliance of ASTM Standards and work according to the Projects Specifications
 Detailing the Technicians for testing/ taking samples from sites
 Supervising the testing procedure, record keeping, and final reporting
 Coordinating with Clients for Requests, Final Reports submission and Cash Receiving
 Over all care of Equipment and its calibration to be conducted in time
 Periodic training of technicians and result submission to Al-Mumayaz Head Office
 Training of technicians for Aramco testing and coordinating with Head Office for such purposes
 Preparation of Inspections by Aramco, ISO, SASO etc
 Making Invoices, coordinating with Head office for the quotations and requirements of Clients
 Surveillance check of work, equipment and surrounding of Lab to avoid any mishandling by the technicians
 Keeping up to date record of ASTM, AASHTO and ACI and BS as per requirements

Senior Lab Technician/ Lab In-charge في A.A.M.Al-Khodari Sons Co.
  • المملكة العربية السعودية - مكة المكرمة
  • يونيو 2011 إلى مايو 2016

Period 8th June, 2011 to 31st May, 2016

Projects * Construction of Group-8, Roads in Makkah Al Mukarama (110 Km )
* Construction of Al-Shafa Road/ King Khalid Road 35 Km (Taif City)
* Construction of Al-Ruduf Park Project 1000 x 2000 Sq Meters (Taif City)
* Construction of Taif Paving and Lightening Project

Main Responsibilities:

 I was the in charge for all work requirements and materials requisition
 I was Supervising Concrete Batching Plant for all the requirements
 I had taken samples from sites to Lab and testing according to the specifications
 I did coordination with Consultants of MOT/ Municipality Taif for requests and results submission
 I did manage the executed works to ensure appropriate work quality with minimum cost
 I had supervised and taken sample for construction of Retaining Walls, Box Culverts, and Side Slopes etc
 I had keep on checking embankment, sub-base and base course materials
 I did testing of Asphalt material according to specifications
 I did checking, filling of Ruduf Park ground level, foot path construction by using color cemented material
 I checked construction of underground water tanks and pipe lines
 I did testing of construction of Cemented & Asphaltic roads and pathways
 I had supervised and did testing construction of Boundary Walls according to the design and specifications
 I did properly testing of construction of Under Ground Canal inside the Park area
 I worked for the construction of Swimming Pool in the Center of the Park
 I worked for testing the construction of trajectory paths, bathrooms, and entertainment area shops
 I had prepared progressive daily and monthly reports / summaries
 I did supervising manpower, technicians responsible for material submittal, quality assurance and control

Lab Technician في Don Fang Electric Company
  • باكستان
  • أبريل 2009 إلى مايو 2011

Project Jinnah Hydro Power Project

Main Responsibilities:

 Monitored the project developments and ensured the QC/ QA with the projections
 Provide the material resources development assistance to the manager
 Filed the daily test reports and monthly summaries in a separate folder
 Provided assistance to the seniors by supporting them in their routine duties
 Ensured all the material according to the approved design.
 Ensured the working area safe and sound.
 Tested for back filling, bottom, sub-base and base course materials
 All quality tests performed regarded Asphalt Mix, Concrete Mix. Soil and Aggregates

Lab Technician في Descon Engineering (Private) Limited
  • باكستان - كراتشي
  • فبراير 2007 إلى مارس 2009

Projects: Hub Co Power Project

Main Responsibilities:

 Strict quality compliance by ensuring proper material testing accordingly
 Carried out supervision of work in a properly process approvals.
 All quality tests performed which related with asphalt mix, aggregate, soil and concrete
 Check material submission and properly process approvals.
 Visit Factories to ensure proper manufacture and testing of materials produced
 Ensured materials delivered were as approved and properly stored.
 Assisted in the development of testing procedure, to keep up to date
 Managed manpower, responsible for materials submittals, quality assurance & control
 Formed daily reports, and monthly summaries

Assistant Lab Technician في Maple Leaf Cement Factory
  • باكستان
  • يناير 2005 إلى فبراير 2007

Period Jan, 2005 to Feb, 2007
Company Maple Leaf Cement Factory
Position Asst. Lab Technician
Projects: New Cement Plant Construction

Main Responsibilities:

 Timely reporting any hindrance during work to the Lab In-charge
 Taking sample from site to Lab and tested in Lab
 Preparation of results and presented to Lab In-charge
 Checked Temperature of Concrete Mix, Slump and Compressive Strength there after in the Lab accordingly after 03, 07 and 28 days
 Filed the daily test reports and monthly summaries in a separate folder
 Provided assistance to the seniors by supporting them in their routine duties
 Check material on periodic interval to maintain the quality
 Assisted the quality testing procedure to ensure quality of work and material

الخلفية التعليمية

ماجستير, Mass Communication, Research Methodology, Social Psychology,
  • في Allama Iqbal Open University Islamabad
  • سبتمبر 2009

I have achieved my Master degree with honor and distinction.

Specialties & Skills

Supervising
Concrete
Office Work
Asphalt
MS Office
E-mailing, Documentations and Composing
CTTA Certificate from Aramco
Asphalt
Concrete
Aggregate

اللغات

العربية
متوسط
الانجليزية
متمرّس
الأوردو
متمرّس
البنجابية
اللغة الأم

العضويات

ASTM
  • Online Reading Membership
  • August 2015

التدريب و الشهادات

MS Office (الشهادة)
تاريخ الدورة:
March 2006

الهوايات

  • Hobbies & Interests
    I stood 1st in my district in debate, I have to spend my spare time in Gardening, and playing Cricket. I am a member of my Organization Cricket Team.