Position Senior Lab Supervisor/ Lab Manager
Projects * Infra Structure at Malik Abdullah Housing Project, Jazan
* Aramco Project Package-5, 9 & 10 at Jazan Economic City
* Riyadh Metro Project
* King Salman Air Base Project
* King Salman Park Project
* Qiddiya Upper Plateau, Lower Plateau and Six Flags Theme Park
Main Responsibilities:
I am the in charge for all work requirements and materials requisition
I am Supervising Concrete, Soil, Aggregate, and Asphalt Testing in the Lab
Checking the Safety of men and equipment and strictly Safety Compliance
Ensuring proper compliance of ASTM Standards and work according to the Projects Specifications
Detailing the Technicians for testing/ taking samples from sites
Supervising the testing procedure, record keeping, and final reporting
Coordinating with Clients for Requests, Final Reports submission and Cash Receiving
Over all care of Equipment and its calibration to be conducted in time
Periodic training of technicians and result submission to Al-Mumayaz Head Office
Training of technicians for Aramco testing and coordinating with Head Office for such purposes
Preparation of Inspections by Aramco, ISO, SASO etc
Making Invoices, coordinating with Head office for the quotations and requirements of Clients
Surveillance check of work, equipment and surrounding of Lab to avoid any mishandling by the technicians
Keeping up to date record of ASTM, AASHTO and ACI and BS as per requirements
Period 8th June, 2011 to 31st May, 2016
Projects * Construction of Group-8, Roads in Makkah Al Mukarama (110 Km )
* Construction of Al-Shafa Road/ King Khalid Road 35 Km (Taif City)
* Construction of Al-Ruduf Park Project 1000 x 2000 Sq Meters (Taif City)
* Construction of Taif Paving and Lightening Project
Main Responsibilities:
I was the in charge for all work requirements and materials requisition
I was Supervising Concrete Batching Plant for all the requirements
I had taken samples from sites to Lab and testing according to the specifications
I did coordination with Consultants of MOT/ Municipality Taif for requests and results submission
I did manage the executed works to ensure appropriate work quality with minimum cost
I had supervised and taken sample for construction of Retaining Walls, Box Culverts, and Side Slopes etc
I had keep on checking embankment, sub-base and base course materials
I did testing of Asphalt material according to specifications
I did checking, filling of Ruduf Park ground level, foot path construction by using color cemented material
I checked construction of underground water tanks and pipe lines
I did testing of construction of Cemented & Asphaltic roads and pathways
I had supervised and did testing construction of Boundary Walls according to the design and specifications
I did properly testing of construction of Under Ground Canal inside the Park area
I worked for the construction of Swimming Pool in the Center of the Park
I worked for testing the construction of trajectory paths, bathrooms, and entertainment area shops
I had prepared progressive daily and monthly reports / summaries
I did supervising manpower, technicians responsible for material submittal, quality assurance and control
Project Jinnah Hydro Power Project
Main Responsibilities:
Monitored the project developments and ensured the QC/ QA with the projections
Provide the material resources development assistance to the manager
Filed the daily test reports and monthly summaries in a separate folder
Provided assistance to the seniors by supporting them in their routine duties
Ensured all the material according to the approved design.
Ensured the working area safe and sound.
Tested for back filling, bottom, sub-base and base course materials
All quality tests performed regarded Asphalt Mix, Concrete Mix. Soil and Aggregates
Projects: Hub Co Power Project
Main Responsibilities:
Strict quality compliance by ensuring proper material testing accordingly
Carried out supervision of work in a properly process approvals.
All quality tests performed which related with asphalt mix, aggregate, soil and concrete
Check material submission and properly process approvals.
Visit Factories to ensure proper manufacture and testing of materials produced
Ensured materials delivered were as approved and properly stored.
Assisted in the development of testing procedure, to keep up to date
Managed manpower, responsible for materials submittals, quality assurance & control
Formed daily reports, and monthly summaries
Period Jan, 2005 to Feb, 2007
Company Maple Leaf Cement Factory
Position Asst. Lab Technician
Projects: New Cement Plant Construction
Main Responsibilities:
Timely reporting any hindrance during work to the Lab In-charge
Taking sample from site to Lab and tested in Lab
Preparation of results and presented to Lab In-charge
Checked Temperature of Concrete Mix, Slump and Compressive Strength there after in the Lab accordingly after 03, 07 and 28 days
Filed the daily test reports and monthly summaries in a separate folder
Provided assistance to the seniors by supporting them in their routine duties
Check material on periodic interval to maintain the quality
Assisted the quality testing procedure to ensure quality of work and material
I have achieved my Master degree with honor and distinction.